Closing Date: 08.03.2021 (Tender Closed)


Invitation to tender, deadline 08/03/21, for the construction of 5 underground stations at Radhakrishanan Salai Jn, Thirumayilai Metro, Mandaiveli, Greenways Road (with part diaphragm wall), Adyar Juntion and two cross passage shafts and one emergency escape shaft for the Radhakrishnan - Adyar Junction  section (Package UG-04) of the Chennai metro’s line 3. The new 26.7 km underground section between Madhavaram Milk Colony and Taramani Road Junction of  the Chennai’s new 45.81 km Line-3 - connecting Madhavaram and SIPCOT in the 118.9 km Chennai Metro Phase 2 project -  will be built through 5 civil packages, UG-01 to UG-05. Duration of the contract is 1725 days. Pre-bid meeting will be held on 23/12/2020 at 11:00 hours in the CMRL Conference Room, followed by site visit. Contact Chennai Metro Rail Ltd, Chennai, tel  (+91) 44-2379 2000, Ext. 22347, fax (+91) 44-2379 2200, email gurunath.reddy@cmrl.in. Visit  

https://chennaimetrorail.org/wp-content/uploads/2020/11/NIT-CP_04_UG_04-JICA-ID-P272.pdf .   

Ref.n. CMRL/CON/PHASE-II/CORR-3/CP04/UG04/2020. 46/20.



Permalink