Lokkak Downstream will have 5.8 km-long x 4.5 m-diameter headrace and 46 m-long tailrace from surface powerhouse. Pre-construction work underway on 6.5-year programme. Visit www.nhpcindia.com November 2000.
Permalink
For Currency Converter click HERE
04.08.2025 Austria
05.08.2025 Poland
11.08.2025 Switzerland
12.08.2025 Austria
12.08.2025 Czech Republic
14.08.2025 Austria
14.08.2025 Italy
14.08.2025 Switzerland
19.08.2025 Spain
25.08.2025 France
26.08.2025 Switzerland
29.08.2025 Denmark
01.09.2025 Brazil
01.09.2025 Switzerland
02.09.2025 Macedonia
02.09.2025 Spain
03.09.2025 Spain
11.09.2025 Switzerland
15.09.2025 Sweden
15.09.2025 Italy
22.09.2025 Netherlands
03.10.2025 Netherlands
tunnelbuilder.com is an online news source for tunnelling projects and tunnelling news worldwide. It provides information on tenders and awards as well as providing information of what’s happening in the tunnelling industry.
Access to front page tunnelling news, the buyer’s guide, product promotion and jobs is FREE.