Lokkak Downstream will have 5.8 km-long x 4.5 m-diameter headrace and 46 m-long tailrace from surface powerhouse. Pre-construction work underway on 6.5-year programme. Visit www.nhpcindia.com November 2000.
Permalink
For Currency Converter click HERE
13.05.2025 Germany
14.05.2025 Poland
14.05.2025 Switzerland
16.05.2025 Switzerland
16.05.2025 Italy
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Czech Republic
26.05.2025 Norway
28.05.2025 Italy
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
09.06.2025 Switzerland
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 Italy
19.06.2025 France
24.06.2025 Switzerland
27.06.2025 Switzerland
28.07.2025 Brazil
tunnelbuilder.com is an online news source for tunnelling projects and tunnelling news worldwide. It provides information on tenders and awards as well as providing information of what’s happening in the tunnelling industry.
Access to front page tunnelling news, the buyer’s guide, product promotion and jobs is FREE.