Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Germany

Germany, Baden-Wuerttemberg - de/75

Road

Negotiated procedure, deadline 2nd November, 2005 for design of the Schindhau tunnel between Tuebingen (road B 27) and Tuebinger Kreuz (B 28). It is a 3.55 km section, including a 2.35 km twin bore tunnel. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=190676-2005, OJ S 193, or contact Regierungspräsidium Tuebingen, Tuebingen, fax +49 70717573190 or 707175793436. E-mail poststelle@rpt.bwl.de or ulrich.kunze@rpt.bwl.de 41/05.BUNG received a EUR160,000 contract to design the Schindhau tunnel between Tuebingen (road B 27) and Tuebinger Kreuz (B 28). It is a 3.55 km section, including a 2.35 km twin bore tunnel. Visit www.bung-ag.de 15/06.Open call for bids, deadline 20th September, 2007 for construction of a 2.3 km tunnel, whereof 230 and 315 metres in cut-and-cover and 1,687 metres bored, 100 square metres in cross-section, as well as a parallel safety tunnel, 25 square metres in cross-section, and other related structures. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=183754-2007, OJ S 148, or contact Regierungspraesidium Stuttgart, Schwaebisch Gmuend, fax +49 71711040799 or 7116660184. E-mail johannes.zengerle@rps.bwl.de or vergabeunterlagen@staatsanzeiger.de 33/07.Negotiated call for tenders, deadline 11th January, 2008 for construction supervision of a 1,687 m-long, 100 sq m cross-sectional tunnel and a 1,613 m-long 20 sq m parallel safety tunnel, a shaft to be built raise boring and other minor works. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=287497-2007, OJ S 236, or contact Regierungspraesidium Stuttgart, Schwaebisch Gmuend, fax +49 71711040799. 52/07-01/08.A joint venture of Zueblin, Baresel, Ostu-Stettin and Hinteregger signed a EUR140 million contract to build a 1.8 km 105 sq m tunnel on road B 29 in Schwäbisch Gmünd. Visit www.zueblin.de, www.baresel.de, www.oestu-stettin.at and www.hinteregger.co.at 17/08.A joint venture of BUNG and Müller+Hereth will supervise the construction of a 1,687 m-long, 100 sq m cross-sectional tunnel and a 1,613 m-long 20 sq m parallel safety tunnel, a shaft to be built using raise boring and other minor works on road B 29 in Schwäbisch Gmünd. Visit www.bung-ag.de and www.mueller-hereth.com 34-35/08.



Permalink