Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Germany

Germany, Stuttgart - de/53

Road

Periodic notice issued on 28th August, 2001 to build a 1,150 m tunnel. Visit http://ted.eur-op.eu.int, document S 164-114303, or contact City of Stuttgart, fax +49 711 2162932. 43/01. Preinformation notice for a double 700 m-long cut-and-cover tunnel on the Pragsattel-Löwentor section of B10 published by the City of Stuttgart. Tenders scheduled for January, 2002. Visit http://ted.eur-op.eu.int, document S 227-156257 or fax +49 711 2167659. 49/01.Open tendering, deadline 14th March, 2002 for the construction of a 2 x 700 m cut-and-cover tunnel in Heilbronnerstrasse, Pragstrasse and Löwenstorstrasse. Visit http://ted.eur-op.eu.int/ojs/en/frame.htm, OJ S 27, document 20807-2002 or contact City of Stuttgart, fax +49 7111232755. 07/02.Negotiated procedure, deadline 11th October, 2004 for engineering for the Rosenstein tunnel. This is a twin tunnel, approximately 2 x 800 m using mining methods and 2 x 300 m in cut and cover. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=148868-2004 and http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=148869-2004, OJ S 173, or contact Landeshauptstadt Stuttgart, Stuttgart, fax +49 7112167659. E-mail daniel.hartenstein@stuttgart.de 38/04.Open call for bids, deadline 2nd December, 2004 for electrotechnical equipment for a 2 x 700 m tunnel on the Pragsattel-Loewentor section of road B10. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=174520-2004, OJ S 204, or contact Landeshaupstadt Stuttgart, Stuttgart, fax +49 7112164386 or 7112167191. E-mail matthias.braitinger@stuttgart.de or marie-luise.mueller@stuttgart.de 44/04.Open call for bids, deadline 21st December, 2004 for installation of ventilation equipment for a 2 x 700 m tunnel on section Pragsattel-Loewentor, road B10. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=190496-2004, OJ S 221, or contact Landeshaupstadt Stuttgart, Stuttgart, fax +49 7112164386 or 7112167191. E-mail ralf.kristel@stuttgart.de or marie-luise.mueller@stuttgart.de 48/04.Bung pocketed a EUR515,400 contract for general technical design of the Rosenstein tunnel. This is a twin tunnel, approximately 2 x 800 m using mining methods and 2 x 300 m in cut and cover. Visit www.bung-gmbh.de 33-34/05.WBI, Boll und Partner and Brenner + Muennich clinched a EUR2.2 million deal for general planning for the Rosenstein tunnel (architecture of the portals, operating rooms, project planning, structural design, soil mechanics and measurements). Visit www.wbionline.de, www.boll-und-partner.de and www.brenner-muennich.de 33-34/05.



Permalink