Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Germany

Germany, Baden Wuerttemberg - de/22

Railway

Closing Date: 20.05.2010 (Tender Closed)

Invitation to tender by negotiated procedure, deadline 20.05.2010, for construction of Lots 1A and 1B twin-tube tunnels. Lot 1A is the 18.7 km-long Filder tunnel to be excavated in Keuper gypsum/marl and marl/sandstone and including 19 compound structures of 17-24 m-long, 250 m-long underground rescue access, 1.3 km-long intermediate section, and 255 m-long open cut tunnel. Lot 1B is the 12.3 km-long Untertuerkheim connection to be excavated with associated structures in Keuper marls and Upper Quaternary deposits. NATM or TBM methods can be used in both lots. Further information, specs and docs from Axel Heintel at Deutsch Bahn AG in Stuttgart, tel +49 71193319-361, fax +49 69-26521939, to whom tenders or requests to participate should be sent. For full history of Stuttgart 21 project over the last 10 years visit tunnelbuilder archive de/22. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=130705-2010. 18/10.



Permalink