A high voltage cable must be installed in the area of the west portal of the Albvorland tunnel and the EUR377.96 million contract, excluding VAT, awarded to Implenia Construction GmbH (Wiesbade) for construction works for the 9.5 km-long section on the Wendlingen-Ulm line (PFA 2.1, Lot 2) has been modified. The duration of the contract is from 28/02/2017 to 31/12/2017. For further information contact DB Projekt Stuttgart-Ulm GmbH, Stuttgart, fax +49 6926521939, email einkauf-s21nbs@deutschebahn.com. Visit http://ted.publications.eu.int/udl?request=Seek-deliver&language=en&docid=079124-2017. Ref.n. 15TEI14773. 09/17.