ARGE Tunnel Albabstieg from Monaco have been awarded an integrated contract for more monitoring drilling at Dornstadt at the northern portal. This is part of the continuing construction of 5.9 km-long Albabstieg tunnel on the section from Ulm to Dornstadt for the new 60 km-long AV line Wendlingen to Ulm. The total amount of the contract is EUR252.71 million, excluding VAT. The duration of the contract is from 16.01.2017 to 30.06.2017. Contact DB AG, attn Beschaffung Infrastruktur FS.EI 3, Stuttgart, fax +49 6926521939, e-mail einkauf-S21nbs@deutschebahn.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=020095-2017. Ref. n. TEC 5/10/239665 03/17.