BUNG Ingenieure AG from Heidelberg has secured the EUR640,107.32 contract, excluding VAT, for the design of engineering structures and technical equipment for the new construction of the Dalheim bypass, including the 1.7km Eulingeberg tunnel, replacing Wetzlar bridge on B49 (lot 1 and lot 2). Contact Hessen Mobil Strassen- und Verkehrsmanagement Zentrale, Wiesbaden, tel +49 611366-0, fax +49 611366-3435, email vergabe.zentrale@mobil.hessen.de. Visit https://ted.europa.eu/en/notice/-/detail/76277-2024. Ref.n. VG-0459-2023-0096. 06/24.