$68 million scheme for two 500 m-deep, 5 m-diameter shafts and 1 km-long, 12 sq m-section tunnel network awarded to jv of Bouyges, Charbonnage de France, Dumez-GTM, and Campenon Bernard. Financed by users EDF, CEA and Cogema and owned by Andra, the national management agency for nuclear waste. December 1999.
Restricted tender, deadline 7th December, 2001, for the draft design comprising five lots: civil and mining engineering; nuclear engineering; mining mechanics; modelling and calculation, and computer graphics. Visit http://ted.eur-op.int, document S 213-146273 or contact Andra, Châtenay-Malabry, fax +33 1 46118258. This lab includes two 500 m-deep shafts connected to a network of 4 m-high tunnels. Geology consists of marls, limestone and very hard clay. Also visit www.andra.fr/en/labo/Bure-0001.htm 46/01.
Resumption of construction on the access shafts authorised by a Bar-le-Duc Court after work suspension further to a fatality which killed one worker in May. Andra, the national authority for the management of nuclear waste, and the construction consortium will set up a new quality insurance plan. Work to restart in February 2003. Visit www.andra.fr. Read E-News Weekly # 17 & 27. 48/02.
Award to the Belgatom / Coyne et Bellier / Deilmann Haniel JV of a €1.3 million contract for mining mechanics as part of the draft design for a deep storage for long-life nuclear waste. Visit www.andra.fr. Read E-News Weekly # 17 & 27. 04/03.