Tendering for 5 km x 3.5 m-diameter TBM and 1 km x 10m2 drill/blast headraces and 89 m-deep x 7 m-diameter shaft. July 1998.
Periodic notice for construction of a 5 km-long 3.5 m-diameter TBM-driven tunnel, a 1 km-long 10 sq m drill/blast headrace tunnel and a 89 m-deep 7 m-diameter shaft. This is a re-tender further to the cancellation by the Bastia administrative court of the public inquiry and concession. Engineering by EDF-CIH. Work to commence end of 2004 to last 39 months. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=132724-2002, OJ S 128, or contact EDF, Grenoble, fax +33 476209190. E-mail jean-francois.machizaud@edf.fr and pierre.poilbout@edf.fr 36/02.