Metro line 5 connects the periphery to the centre of Sao Paulo city, Capao Redondo to Chacara Klabin. The Capao Redondo to Largo Treze section is already in operation. Design and the construction of the second section Largo Treze-Chacara Klabin is underway, with Geodata Engineering managing the executive project and construction assistance, including seven lots for a total of 11 km of tunnels, 10 stations and 19 ventilation shafts and emergency exits. The expected duration of the project is 41 months from July, 2011. Tunnelling will be by NATM and TBM. Visit www.metro.sp.gov.br and www.geodatagroup.com. 41/11.