Prequalification tenders invited, deadline 1st October, 2001, for feasibility and environmental impact studies for construction of 9 km-long bypass, including two tunnels. Contact Transport Ministry, fax +387 332 50490. Visit 45 221 240 at http://ted.eur-op.eu.int and www.mvp.gov.ba 39/01.
Feasibility studies and detailed design expected to be completed by late-2003 for three twin-tube NATM tunnels Ostrick (270 M), Ozega (400 m) and Tresevine (178 m). Contact Roads Ministry, fax +387 332 50490 for details. 43/01.