Open invitation to tender, deadline 04.08.2009, for the management and geological documentation of Innsbruck - Ahrental running tunnel, part of Brenner base tunnel. Specs and docs from Dr Johann Hager at BBT SE in Innsbruck, tel +43 512403-0, fax -0110, e-mail ava@bbt-se.com to whom tenders or requests to participate should be sent. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=161594-2009. 26/09.Invitation to tender, deadline 10.09.2009, for the measurement of emissions before and during the construction exploration tunnels Innsbruck-Steinach-Ahrental and Wolf. Time limit 03.09.2009 for receipt of requests for documents or for accessing documents. Contract duration 60 days. Contact Dott. Johann Hager, Brenner Basistunnel BBT SE, Innsbruck, tel +43 5124030, fax -110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200483-2009. 31/09.Invitation to tender, deadline 08.09.2009, for noise measurement, traffic surveys and site inspections before, during and after the construction of exploration tunnels Innsbruck-Steinach-Ahrental and Wolf. Time limit 01.09.2009 for receipt of requests for documents or for accessing documents. Contract duration 60 days. Contact Dott. Johann Hager, Brenner Basistunnel BBT SE, Innsbruck, tel +43 5124030, fax -110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200484 -2009. 31/09.Invitation to tender, deadline 09.09.2009, for detection and monitoring of vibration and secondary airborne noise before and during construction of the Innsbruck-Ahrental and Steinach-Wolf sections. Time limit 02.09.2009 for receipt of requests for documents or for accessing documents. Contract duration 60 days. Contact Dott. Johann Hager, Brenner Basistunnel BBT SE, Innsbruck, tel +43 5124030, fax -110, e-mail ava@bbt-se.com. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200485-2009 31/09.Invitation to tender, deadline 11.09.2009, to perform buildings certification and measurements of geodetic control (with technical assistance from a geologist) before, during and after construction work in Innsbruck-Ahrental and Steinach-Wolf sections. Time limit 04.09.2009 for receipt of requests for documents or for accessing documents. Contract duration 60 days. Contact Dott. Johann Hager, Brenner Basistunnel BBT SE, Innsbruck, tel +43 5124030, fax -110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=200486-2009. 31/09.First postponement of open invitation to tender for the management and geological documentation of Innsbruck-Ahrental running tunnel, part of Brenner base tunnel. Deadline now 25.08.2009. Time limit 18.08.2009 for receipt of requests for documents or for accessing documents. Contact Dr Johann Hager at BBT SE in Innsbruck, tel +43 512403-0, fax -0110, e-mail ava@bbt-se.com to whom tenders or requests to participate should be sent. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=217303-2009. 33/09.The JV Plankel/GPS/Tiefbohr of Gewerbepark 70, A-9710 Pöllan secured the contract n. B0041, value EUR1.1 million, for 23 short exploratory boreholes at the Austrian Brenner Base Tunnel section, Lot 1. Visit www.plankel.at, www.gps-bau.com and www.tiefbohr-robier.at. Geotec SpA.of Via G. Barbato 20, I-86100 Campobasso secured the contract n. B0051, value EUR1.1 million, for 22 short exploratory boreholes at the Italian Brenner Base Tunnel section, Lot 2. Visit www.geotecspa.com.For more information contact Dr Johann Hager, Galleria di Base del Brennero Brenner Basistunnel BBT SE, Innsbruck, tel +43 512403-0, fax -0110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=295478-2009. 44/09.NUA Umweltanalytik GMBH, Südstadtzentrum 4, A-2344 Maria Enzersdorf secured the EUR730,000 contract for the measurement of emissions before and during the construction of exploration tunnels Innsbruck-Ahrental and Steinach-Wolf. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=335983-2009 and www.nua.co.at.JV Bernard/Gebauer/Intergeo, Bahnhofstrasse 19, A-6060 Hall in Tirol secured the EUR2,435,682 million contract for the management and geological documentation of Innsbruck-Ahrental running tunnel, part of Brenner base tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=335984-2009.IC Consulenten Ziviltechniker GesmbH, Schönbrunner Strasse 297, A-1020 Vienna, secured the EUR241,588 contract for detection and monitoring of vibration and secondary airborne noise before and during construction of the Innsbruck-Ahrental and Steinach-Wolf sections. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=336038-2009 and www.ic-group.org.JV Bernard/Speckbacher/Trigonos, Bahnhofstrasse 19, A-6060 Hall in Tirol secured the EUR606,597 contract to perform buildings certification and measurements of geodetic control (with technical assistance from a geologist) before, during and after construction work in Innsbruck-Ahrental and Steinach-Wolf sections. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=341874-2009.Contact for the above Brenner awards is Dr Johann Hager at BBT SE in Innsbruck, tel +43 512403-0, fax -0110, e-mail ava@bbt-se.com. 51/09.Award of contract, value EUR63,227,727 excluding VAT, for establishment of Ahrental access tunnel (2.42 km); Ahrental exploration adit (2.515 km); and continuous miner tunnels Innsbruck (2.815 km) and Sillschlucht (290 m) and associated works, to Arbeitsgemeinschaft Erkundungsstollen Brenner Nord of 1100 Wien. More from Dr Johann Hager at BBT SE in Innsbruck, tel +43 5124030, fax +43 5124030-110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=020235-2010. 04/10.AVD-AI JV of Dornbirn, Austria secured the EUR960,699 contract for geotechnical distortion measurements and geodetic control of Innsbruck-Ahrental running tunnel, part of Brenner base tunnel. Contact Dr Johann Hager at BBT SE in Innsbruck, tel +43 512403-0, fax -0110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=022676-2010. 06/10.Vicenzetto Srl of Villa Estense have secured the EUR587,987 contract for test drilling and boring work in Brenner Base tunnel. Contact Johann Hager at BBT SE in Innsbruck, tel +43 5124030, fax +43 5124030-110, e-mail ava@bbt-se.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=062301-2010 and www.vicenzetto.it. 10/10.