Singapore,
Singapore
- sg/27
Thomson Line
Closing Date:
04.06.2013 (Tender Closed)
Second pre-qualification notice, deadline 04.06.2013, for Signalling System and Platform Screen Doors (Contract T252) for TSL and ERL. The proposed fully underground 30 km Thomson Line (TSL) and 13 km Eastern Region Line (ERL). The ERL will have 10 stations (one interchange), and an at-grade depot. Contact LTA, att.n Ms Monica Wong/Ms Felicia Neo, tel 65-6396 1205/1194, fax 65-6396 1124, e-mail lta_contracts@lta.gov.sg. Visit http://app.lta.gov.sg/data/apps/tender/doc/3622/T252_2nd%20PQ%20Notice_7May13.pdf and http://www.gebiz.gov.sg/scripts/main.do?doctype=PQ&doc=LTA000EPQ13000014. Bid Code LTA000EPQ13000014. 21/13.
Second pre-qualification notice, deadline 10.06.2013, for design, supply, installation, testing and commissioning of Integrated Supervisory Control System (Contract T255) for the proposed fully underground 30 km Thomson Line (TSL) and 13 km Eastern Region Line (ERL). The ERL will have 10 stations (one interchange), and an at-grade depot. Contact LTA, att.n Ms Low Bee Eng/Ms Lim Pi Feei, tel 65-6396 1202/1623, fax 65-6396 1124, e-mail lta_contracts@lta.gov.sg. Visit http://app.lta.gov.sg/data/apps/tender/doc/3761/T255_2nd%20PQ%20Notice.pdf and http://www.gebiz.gov.sg/scripts/main.do?doctype=PQ&doc=LTA000EPQ13000018. Bid Code LTA000EPQ13000018. 21/13.
Second pre-qualification notice, deadline 10.06.2013, for design, supply, installation, testing and commissioning of Communications System (Contract T260) for the proposed fully underground 30 km Thomson Line (TSL) and 13 km Eastern Region Line (ERL). The ERL will have 10 stations (one interchange) and an at-grade depot. Contact LTA, att.n Ms Low Bee Eng/Ms Amanda Leong, tel 65-6396 1202/62997431, fax 65-6396 1124, e-mail lta_contracts@lta.gov.sg. Visit http://app.lta.gov.sg/data/apps/tender/doc/3781/T260_2nd%20PQ%20Brochure_upload.pdf and http://www.gebiz.gov.sg/scripts/main.do?doctype=PQ&doc=LTA000EPQ13000019. Bid Code LTA000EPQ13000019. 21/13.
Pre-qualification notice, deadline 12.06.2013, for the power supply system (Contract T253) for the 30 km Thomson Line (TSL). Contact LTA, att.n Ms Low Bee Eng/Ms Lim Pi Feei, tel 65-6396 1202/1623, fax 65-6396 1124, e-mail lta_contracts@lta.gov.sg. Visit http://app.lta.gov.sg/data/apps/tender/doc/3662/T253_PQ%20Notice_rev.pdf and http://www.gebiz.gov.sg/scripts/main.do?doctype=PQ&doc=LTA000EPQ13000016. Bid Code LTA000EPQ13000016. 21/13.
Pre-qualification (PQ) notice, deadline 05.10.2012, for the 23 Build-Only
Civil Contracts in the 30 km Thomson Line (TSL) fully underground:
a) One (1) no Depot Contract include Bus Deck and Bus Depot;
b) Five (5) nos station only contracts;
c) Two (2) nos station cum Cut & Cover / Mined Tunnels contracts;
d) Thirteen (13) nos station cum Bored Tunnels and Cut & Cover Tunnels
(where applicable) contracts; and
e) Two (2) nos tunnels only contracts.
The proposed Thomson Line (TSL) is a fully underground 4-car mass Rapid Transit System with a route-length of approximately 30 km. Visit http://app.lta.gov.sg/data/apps/tender/doc/1482/TSL_PQ_Notice.pdf and http://www.gebiz.gov.sg/scripts/main.do?doctype=PQ&doc=LTA000EPQ12000003. 40/12.
Award of contract for construction of Caldecott station and associated tunnels, value USD285 million, to Samsung C&T. Award of twin-tunnel construction contract 3.5 km between Woodland station and Woodlands South station, value USD421 million, to STEC. Construction commences August, 2013 for completion 2019. Contact LTA, att.n Ms Low Bee Eng/Ms Lim Pi Feei, tel 65-6396 1202/1623, fax 65-6396 1124, e-mail lta_contracts@lta.gov.sg. Visit http://app.lta.gov.sg/data/apps/tender/doc/. 31/13.
The company Woh Hup of Singapore secured the contract T205, value EUR85 million (SGD144 million) for the construction of Woodlands South station, one of 22 on the 30 km-long, fully underground Thomson Line, which will be completed in phases from 2019 to 2021. Works will begin later this year, and the station will be completed in 2019. Visit http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=987c56c1-2992-49d9-b176-5a8f7faa2bb5. 36/13.
The Land Transport Authority (LTA) has awarded four civils contracts T201, T203, T209 and T210 with a total value of around EUR610 million for three Thomson Line stations and adjacent tunnels, as well as Thomson Line’s Mandai Depot.
Contract T203 for the construction of Woodlands station and its associated cut-and-cover tunnels has been awarded to GS Engineering & Construction Corp at a contract sum of EUR171 million. When completed, Woodlands station will serve as the interchange between Thomson Line and North-South Line.
Contract T209 for the design and construction of Lentor station and its associated tunnels has been awarded to China Railway No. 5 Engineering Group Co., Ltd (Singapore Branch) at a contract sum of EUR145 million.
Contract T210 for the design and construction of Mayflower station has been awarded to Gammon Construction Limited Singapore Branch (GPL) at a contract sum of EUR102 million.
When completed, these Thomson Line stations will connect the northern and central parts of Singapore through Woodlands and Caldecott stations to connect with the North-South and the Circle Line respectively, bringing further convenience and connectivity to commuters working and residing in Woodlands, Lentor, Thomson and Ang Mo Kio. In addition, these three stations will serve as Civil Defence shelters along the Thomson Line.
Contract T201 for the construction of Thomson Line’s Mandai Depot was awarded to Jurong Primewide Pte Ltd (JPW) for EUR192 million.
Construction works for these civils contracts are expected to start by the first quarter of 2014. The Woodlands interchange station and Mandai depot are scheduled to be completed in the year 2019, while Lentor and Mayflower stations are scheduled to be completed in 2020. Click sg/27 for tunnelbuilder archive. Visit http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=e24d3853-ee73-4d65-922b-bba5dcb8beb7. 44/13.
The Land Transport Authority (LTA) has awarded two civil contracts, T208 and T212 with a total value of around EUR447 million (SGD757 million).
The construction of Springleaf station and its associated tunnels (T208) has been awarded to Leighton Contractors (Asia) Limited (Singapore Branch) – John Holland Pty Ltd Joint Venture (JV) at a contract sum of EUR226 million (SGD383 million).
Contract T212 for the construction of Upper Thomson station and its associated tunnels has been awarded to Sato Kogyo (S) Pte. Ltd at a contract sum of EUR221 million (SGD374 million).
Construction works for contracts T208 and T212 are expected to start by the first quarter of 2014. Click sg/27. Visit http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=b71143b9-db2f-4b06-92d1-485d05f61d46. 48/13.
The Joint Venture of Bachy Soletanche Singapore Pte Ltd (France) and Wai Fong Construction Pte Ltd (Singapore) secured the EUR189.5 million (SGD294 million) contract for the construction of Tanjong Rhu station and its associated tunnels along the 13km Thomson-East Coast Line (TEL) in Singapore. Construction works are expected to start by the first quarter of 2016 and targeted to complete in 2023.
Bachy Soletanche Singapore Pte Ltd is currently involved in the construction of TEL’s Orchard and Gardens By The Bay stations. Wai Fong Construction Pte Ltd is an established civil engineering contractor in Singapore. They are currently involved in the construction of TEL’s Mount Pleasant Station. Visit http://www.lta.gov.sg/apps/news/page.aspx?c=2&id=c478ad2f-e4b5-4c0d-9c2c-5f9a2c1eecdb. 04/16.
Shanghai Tunnel Engineering Co. (Singapore) Pte Ltd secured the EUR188.8 million (SGD293 million) contract for the construction of Katong Park station and its associated tunnels along the 13km Thomson-East Coast Line (TEL) in Singapore. Shanghai Tunnel Engineering Co. (Singapore) Pte Ltd is currently involved the construction of TEL’s Shenton Way station and tunneling portion between Woodlands Station and Woodlands Avenue 12. Construction works are expected to start by the first quarter of 2016 and targeted to complete in 2023. Visit http://www.lta.gov.sg/apps/news/page.aspx?c=2&id=c478ad2f-e4b5-4c0d-9c2c-5f9a2c1eecdb. 04/16.
The Joint Venture of Sangyong Engineering & Construction Co Ltd (Korea) and Hyundai Engineering & Construction Co Ltd (Korea) secured the EUR232.7 million (SGD361 million) contract for the construction of Marine Terrace station and its associated tunnels along the 13km Thomson-East Coast Line (TEL) in Singapore. Construction works are expected to start by the first quarter of 2016 and targeted to complete in 2023. Visit http://www.lta.gov.sg/apps/news/page.aspx?c=2&id=c478ad2f-e4b5-4c0d-9c2c-5f9a2c1eecdb. 04/16.