Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Colombia

Colombia, Antioquia - co/27

Toyo

Closing Date: 24.08.2015 (Tender Closed)

The bid deadline for construction, operation and maintenance of the Section1 of Toyo tunnel project is 24.08.2015. The section, from Canasgordas, is 18.3 km-long with bridges (973 m), open air roads (4.97 km) and 12.3 km in tunnel, including the 9.75 km-long Toyo tunnel. Award is scheduled for 28.09.2015. Visit http://antioquia.gov.co/index.php/la-secretaria-de-infraestructura/historico-infraestructura/25026-proceso-licitatorio-del-t%C3%BAnel-del-toyo,-un-ejercicio-de-transparencia



Permalink


The consortium Antioquia al Mar, lead by FCC with  Colombiana de Infraestructuras S.A.S. (40% shareholding), CASS Constructores & Compañía S.C.A., Carlos Alberto Solarte Solarte, Estyma Estudios y Manejos Sociedad Anónima (60% shareholding) secured the EUR 392 million for construction, operation and maintenance of the Section1 of Toyo tunnel project. The section, from Canasgordas, is 18.3 km-long with bridges (973 m), roads (4.97 km) and tunnels (12.3 km), including the 9.75 km-long Toyo tunnel. Visit https://www.invias.gov.co/index.php/sala/noticias/2627-arranco-construccion-del-tunel-del-toyo-en-antioquia  and https://www.fcc.es/-/fcc-construira-el-proyecto-del-tunel-del-toyo-en-colombia-por-392-millones-de-euros    44/15.






Permalink


Invias, the Colombian highway authority, have awarded the two contracts for the 19.4 km access roads and accompanying infrastructure between Santa Fe de Antioquia and Canasgordas, linking to the 9.8 km Toyo/Guillermo Gaviria Echeverri tunnel. The project includes 13 bridges, 12.5 km open air roads, 11 tunnels and 4 cut & cover tunnels. 

Construcciones el Condor SA secured the EUR 97.28 million (COP418.20bn) contract 1, involving 10km access road from the Santa Fe de Antioquia adit tunnel to the ‘Mar 1’ highway including 4 tunnels.   

Consortium Vias Colombia 061, which includes Hidalgo,  Hidalgo Colombia-Hidalgo and Hidalgo Sucursal Colombia have secured the EUR 90.71 million (COP390 bn) contract 2, involving about  9km access road from Canas Gordas adit tunnel with 13 bridges and 6 tunnels.  

Works will start in May-June 2021. A new tenderwill be announced for supply, installation and operation of E&E equipment. For further information please visit https://www.invias.gov.co. 13/21. 

 




Permalink


COMSA Industrial -  in a consortium with local companies Disico e G&C - has been awarded  the EUR100 million contract for the supply, installation, configuration, commissioning and operational support of E&M equipment for the Guillermo Gaviria Echeverri Tunnel (Tunel del Toyo) project and its access roads, as part of the “Roads for Legality and Reactivation Vision 2030” public works programme. The contract includes ventilation systems, fire protection, lighting, control and intelligent transport systems, among others.  Visit https://www.comsa.com/en/. 12/22.  



Permalink