Negotiated procedure, deadline 8th November, 2002 for engineering services for a 3 km northeast ... More Information
Permalink
Stredich Beratende Ingenieure GmbH & Co. KG from Bochum secured the contract for the ... More Information
For Currency Converter click HERE
Dywidag, now part of Walter Bau, has won a €13 million contract to build the Schwarzer Berg ... More Information
Open call for tenders, deadline 20th November, 2002 for construction of a twin 1,770 m tunnel, 5.8 ... More Information
Preinformation for construction of a 1.7 km double tunnel on A38 between Göttingen and Halle. ... More Information
Negotiated procedure, deadline 19th August, 2002 for construction of the Schlüchterner tunnel, ... More Information
Preinformation for the construction of lot 4 of highway A 113 including the 900 m Rudower Höhe ... More Information
Preinformation notice for the construction of the 1,250 m Nollinger Berg tunnel, west tube on the ... More Information
Award to a jv of Strabag and Züblin of a 940 m bored tunnel and a 229 m cut-and-cover portion for ... More Information
A feasibility study for a Transrapid rail link from Düsseldorf to Dortmund is to be presented to ... More Information
A feasibility study for a Transrapid rail link from Munich city to its airport is to be presented ... More Information
Invitation to tender by negotiated procedure, deadline 17.06.2011, for construction of 210 m-long, ... More Information
Open invitation to tender, deadline 30.09.2015, for the construction of two single-track ... More Information
Delta h Ingenieurgesellschaft mbH from Witten secured the contract for a numerical model for ... More Information
Open invitation to tender, deadline 17.12.2018, for Environmental Monitoring according to the EBA, ... More Information
Open invitation to tender, deadline 20.12.2018, for supervision services during the construction ... More Information
KREBS+KIEFER Ingenieure GmbH from Munich secured the contract for the construction of tunnel west ... More Information
The joint venture between Implenia Construction GmbH (50%) and Hochtief Infrastructure GmbH (50%) ... More Information
Deutsche Bahn has awarded the EUR189 million contract (VE10) to the group consisting ... More Information
Deutsche Bahn has awarded the EUR676 million contract (VE30) to the group consisting of Wayss ... More Information
Open invitation to tender, deadline 22.03.2019, for vertical wells, a preliminary measure for ... More Information
The JV 2. S-Bahn Stammstrecke Muenchen Tunnel Hauptbahnhof, Max Boegl Stiftung & Co. KG, ... More Information
Page:
28.01.2021 Belgium
28.01.2021 France
28.01.2021 Italy
28.01.2021 Switzerland
29.01.2021 Spain
29.01.2021 Romania
01.02.2021 Italy
01.02.2021 Switzerland
02.02.2021 Switzerland
05.02.2021 United Kingdom
05.02.2021 Italy
05.02.2021 Czech Republic
08.02.2021 Italy
09.02.2021 Italy
09.02.2021 Norway
09.02.2021 Germany
09.02.2021 France
09.02.2021 Sweden
11.02.2021 Switzerland
12.02.2021 France
12.02.2021 Austria
15.02.2021 Italy
15.02.2021 Sweden
15.02.2021 Spain
16.02.2021 Switzerland
17.02.2021 Austria
18.02.2021 France
18.02.2021 Switzerland
19.02.2021 Spain
22.02.2021 Italy
22.02.2021 France
22.02.2021 Switzerland
23.02.2021 France
23.02.2021 Austria
25.02.2021 France
25.02.2021 Czech Republic
26.02.2021 Spain
26.02.2021 Switzerland
01.03.2021 Switzerland
03.03.2021 Italy
08.03.2021 Norway
08.03.2021 India
14.04.2021 Hungary
19.05.2021 United Kingdom
01.06.2021 Switzerland
tunnelbuilder.com is an online news source for tunnelling projects and tunnelling news worldwide. It provides information on tenders and awards as well as providing information of what’s happening in the tunnelling industry.