Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Italy

Italy, Lazio - it/153

Road

Open invitation to tender, deadline 04.05.2009, for project definition and VIA study for Tivoli East Bypass, including tunnel Monte Ripoli (1,225 m rock and 75 m cut and cover) with safety tunnel. Estimated value EUR63 million. Contact Comune di Tivoli, Settore VIII Lavori Pubblici, tel/fax +39 0774453614, e-mail settorellpp@comune.tivoli.rm.it. Bids to Comune di Tivoli, Ufficio Relazioni con il Pubblico (U.R.P.), Piazza del Governo 1, I-00019 Tivoli. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=075292-2009, OJ S 52. 14/09.



Permalink

Italy, South Tyrol - it/152

Roads

Invitation to tender by restricted procedure, deadline 07.04.2009, for engineering and security coordination in different phases of Lot 1 refurbishment on SP24 Prato Isarco-Ponte Gardena, Bozen Province, including a 500 m-long tunnel. Contract value EUR305,000. Contact Provincia Autonoma di Bolzano, Ufficio Appalti, tel +39 04714125-04, fax -39, e-mail wettbewerbe-11.5@provinz.bz.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=061597-2009, OJ S 42. 12/09.



Permalink

The JV Via Ingegneria-Franceschini - Benussi, via Flaminia Vecchia n 999, I-00196 Rome, e-mail via@via.it tel +39 06332-7441, fax -19798 secured the EUR189,087 contract for definitive engineering project, security coordination in different phases of the project, for Lot 1 refurbishment on SP 24 Prato Isarco-Ponte Gardena, Bozen Province, including a 500 m-long tunnel. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=277051-2009. 43/09.



Permalink

Oberosler Pietro Spa at San Lorenzo di Sebato secured the EUR7.5 million contract for 1.2 km Lot 1 refurbishment on SP24 Prato Isarco-Ponte Gardena, Bozen Province, including a new 555 m-long tunnel. Contact Provincia autonoma di Bolzano, Ufficio appalti 11.5, Bolzano, e-mail ufficio.appalti@provincia.bz.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=315304-2011. 41/11.



Permalink

Italy, Sardegna - it/151

Road

The JV M.G.A. Srl - UNIROCK Srl (MS), secured the EUR1.4 million contract for maintenance and refurbishment works of Santu Antine tunnel (956 m) on SS 131 - Diramazione Centrale Nuorese, between Oristano and Nuoro provinces. The contract includes correction of water seepage and is part of the larger refurbishment and security project for Anas tunnels. Visit www.stradeanas.it 12/09.



Permalink

Italy, Campania - it/150

Roads

Invitation to tender by restricted procedure for refurbishment of lighting, ventilation, MT/BT and special equipment in Varano (1,160 m) and Privati (1,940 m) tunnels on SS 145 Sorrentina between Gragnano e Castellamare di Stabia municipalities in Napoli province. Contract value EUR14.2 million, duration 570 days, of which 90 days for installation. Requests to participate, deadline 15.04.2009, to Anas, Direzione Generale - Servizio Gare, Via Monzambano 10, 00185 Roma. For information contact Anas, Direzione Generale, tel. +39 (0)6 490326, fax +39 (0)6 44462009, e-mail r.memoli@stradeanas.it. Visit www.stradeanas.it. Bid code:NA 2/09. 12/09.



Permalink

Consorzio Ravennate (Dam SpA-Eltec SaS) secured the contract, value EUR8.9 million, for the executive project and refurbishment of lighting, ventilation, MT/BT and special equipment in two tunnels on SS 145 Sorrentina, between Gragnano e Castellamare di Stabia municipalities, Napoli province: Varano (1,160 m) and Privati (1,940 m). Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/27977. Bid code:NA 2/09. 40/10.



Permalink

Italy, Countrywide - it/149

Gas

Notice of the existence of a qualification system, indefinite duration, for the construction work for gas pipelines. Contact Snam Rete Gas, att.n Ufficio Servizi al Procurement, San Donato Milanese, fax +39 02 52067570, email mevem@snamretegas.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=065649-2009, OJ S 45. 11/09.



Permalink

Notice of the existence of a qualification system, indefinite duration, for construction work for gas pipelines, tunnels, minitunnels and microtunnels. Contact Snam Rete Gas, San Donato Milanese, fax +39 02 52067570, e-mail mevem@snamretegas.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=105805-2011. 15/11.



Permalink



Notice of the existence of a qualification system, indefinite duration, for construction work for gas pipelines, tunnels, minitunnels and microtunnels. Contact Snam Rete Gas, San Donato Milanese, fax +39 02 52067570, e-mail mevem@snamretegas.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=049230-2013. 07/13.



Permalink

Notice of the existence of a qualification system, indefinite duration, for construction work for gas pipelines, tunnels, minitunnels and microtunnels. Contact Snam Rete Gas SpA, att.n Vendor Management Office, San Donato Milanese, fax +39 0237037570, e-mail mevem@snamretegas.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=443402-2014. 01/15.



Permalink

Notice of the existence of a qualification system, indefinite duration, for design and supervision services for gas pipelines. Contact Snam Rete Gas SpA, att.n Vendor Management Office, San Donato Milanese, fax +39 0237037570, e-mail mevem@snamretegas.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=443720-2014. 01/15.



Permalink


Notice for qualification system, indefinite duration, for construction work for gas pipelines, tunnels, mini-tunnels and micro-tunnels. Contact Sam Rete Gas SpA, San Donato Milanese, fax +39 0237037570, e-mail mevem@snamretegas.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=459295-2015. 53/15.




Permalink

Italy, Veneto - it/148

Road

Reinforcement works of the crown of the 4 km bidirectional Comelico tunnel on trunk road SS 52 Carnica, in Belluno province, commenced on 15th September. These works will take 60 days and aim at reducing the water ingress from the overlying rock and consolidating the top heading of the tunnel by rebuilding the groundwater collection and drainage. The main works consist of the reinforcement and waterproofing of the tunnel vault by means of epoxy and polyurethane resin injections and bolts along with the installation of fretted metal sheet to intercept and channel the groundwater. The contractor is Pierobon Silvio of Belluno for EUR3.3 million. Further to this first phase, other works will follow worth EUR3 million. 38/08.



Permalink

Open invitation to tender, deadline 25.03.2014, for final design of integrated contract and for the safety coordination at the design phase in order to maintenance and efficiency improvement of the technological equipment and safety of the 4 km-long bi-directional Comelico tunnel on trunk road SS 52 Carnica from Km 81 +009 at km 85 +119, in Belluno province. Value contract EUR120,000, excluding VAT, duration 90 days. Contact Anas SpA, Veneto roads department, Venezia-Mestre, Bids and contract Office, tel+39 041 2911440, fax +39 041 2911407, e-mail ve-garecontr@postacert.stradeanas.it. Visit http://www.stradeanas.it/index.php?/appalti/rilevanza_comunitaria/dettaglio/id/64093. Bid code: 03/2014. 09/14.



Permalink

Italy, Genoa - it/147

Railway

Open invitation to tender, deadline 25.02.2009, for improvements to Voltri-Brignole railway section including 3 km of tunnels, value EUR130 million. More from Angelo Putaturo of Italferr, tel +39 06 4975 2446, e-mail appalti.italferr@legalmail.it. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=313987-2008 51/08.



Permalink

Open invitation to tender, deadline 20.10.2017, for the completion of Colombo and San Tomaso tunnels and the extension of the Voltri bypass (Polcevera tunnel), included external section near Fegino, part of the infrastructural improvement of Voltri-Brignole railway section. Contract value is EUR73.16 million, excluding VAT. Duration of the contract is 905 days. For further information contact RFI SpA , attn Edgardo Greco, Rome, email rfi-ad-dac.ge@pec.rfi.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=313385-2017 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=373447-2017. Ref.n. DAC.0224.2017. 40/17.



Permalink

Astaldi SpA from Rome secured the EUR67.05 million contract, excluding VAT, for the completion of Colombo and San Tomaso tunnels and the extension of the Voltri bypass (Polcevera tunnel), includes external section near Feglino, part of the infrastructural improvement of the Voltri-Brignole railway section. Contact RFI SpA , attn Massimo Iorani, Rome, email rfi-ad-dac.ge@pec.rfi.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=140834-2018.

Ref.n. DAC.0224.2017. 15/18.



Permalink

Italy, Veneto - it/146

Highway

The Veneto regional assembly has approved a financing proposal presented by Grandi Lavori Fincosit, Adria Infrastrutture and Mantovani for the design, construction and operation under concession of the so-called Alpe Adria connection-Extension of highway A27. From the administrative point of view, the proposal has been sent to the regional council to be submitted to a commission of counsellors for approval prior to be examined and approved by the interministerial committee for economic planning (CIPE). Once the CIPE has approved the preliminary project, the project will be subject to an international tender to appoint the concessionaire for the project. The proposal plans to extend to north highway A27 Mestre-Belluno, starting from Pian di Vedoia and ending in Pian de l'Abate south of Caralte, with connection to road SS 51 di Alemagna. The scheme will extend the highway up to Macchietto in the Cadore area at the foothills of the Dolomites. To view the route, click here. Visit www.glf.it and www.fip-group.it/mantovaniThe project length, including the junctions, is approx. 21 km, with bridges and viaducts accounting for around 3.5 km and six tunnels, one of which in cut-and-cover, for a total of 11 km each way. For details, click here. Each carriageway will carry two 3.75 m lanes, an emergency lane and a 2.60 m median. The total estimated investment is around EUR1.2 billion. This is the first of three sections on the A27-A22 corridor aimed at extending the highway from the Cadore to the Carnia, where it will connect with the A23 Palmanova-Tarvisio. The connection with the A23 in Friuli-Venezia Giulia region is planned in a second stage, which will allow motorists to join Austria. 29/08.



Permalink

Italy, Piedmont - it/145

Road

  Open invitation to tender, deadline 26th June, 2008 for construction of a 992 m bypass tunnel in Ceppo Morelli. This is a single bore bidirectional tunnel, with one 3.50 m-wide lane per direction. A pilot tunnel will first be constructed, using a 4 m TBM, and then be widened using drilling and blasting. Support will comprise wire mesh, bolts, shotcrete and steel arches. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=116815-2008, OJ S 86, and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=123861-2008, OJ 92, or contact SCR, Turin, fax +39 0114323570. E-mail appalti@scr.piemonte.it 26/08.Joint venture of Cogeis, Cave Spadea and Geodata has secured the EUR21.4 million contract for construction of a 992 m-long bypass tunnel in Ceppo Morelli. This is a single bore bi-directional tunnel, with one 3.50 m-wide lane per direction. A 4 m-diameter TBM pilot tunnel will first be bored, and then widened using drilling and blasting. Support will comprise wire mesh, bolts, shotcrete and steel arches. Visit www.geodata.it, www.cogeis.it or http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=029058-2009, OJ S 21. 06/09.



Permalink

Dott. Ing. Luigi Quaranta of Turin, 3TI Progetti Italia SpA of Rome, SI.ME.TE S.r.l. of Turin, Studio O. Siniscalco of Turin secured the EUR842,327.80 contract, excluding VAT, for architectural and building-surveying services during the last part of construction of the 992 m-long bypass tunnel in Ceppo Morelli. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=161358-2013. 21/13.



Permalink

Italy, Lombardy - it/144

Railway

Negotiated invitation to tender, deadline 23rd June, 2008 for design and construction for maintenance works (civil works and railway systems) in the rail tunnels operated by Italy's railway network owner RFI in Lombardy. Visit www.rfi.it/gareult.asp 24/08.



Permalink

Restricted procedure, deadline 24.08.2009, for repair and maintenance services of EM equipment in the following Passante Ferroviario stations in Milan: Rho-Fiera, Villapizzone, Lancetti, Porta Garibaldi, Repubblica, Porta Venezia, Dateo and Porta Vittoria. Contract value EUR1,150,000, duration 24 months. Contact RFI SpA, Milan, tel +39 0263715683, fax +39 0263715618. Visit www.rfi.it and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=188646-2009. 29/09.



Permalink

Boffetti impianti Srl at Calusco d'Adda secured the EUR815,640 contract for repair and maintenance services of EM equipment in the following Passante Ferroviario stations in Milan: Rho-Fiera, Villapizzone, Lancetti, Porta Garibaldi, Repubblica, Porta Venezia, Dateo and Porta Vittoria. Contact RFI SpA, Milan, tel +39 02637156-83, fax -18. Visit www.boffetti.it and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=091741-2010. 14/10.



Permalink

The JV Impresa Luigi Notari SpA (Milano), Ivecos SpA and MGA SpA secured the EUR12.9 million contract, VAT not included, for refurbishment of km 3+258 to 4+053 of Monte Olimpino 2 section on the Milano-Chiasso line. Contact RFI SpA, Milano, tel +39 0263715683, fax +39 0263715618. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=159924-2012, www.impresaluiginotari.it and www.ivecos.it. 22/12



Permalink