Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Turkey

Turkey, Siirt - tr/39

Hydropower

Closing Date: 30.10.2013 (Tender Closed)

Invitation to tender by negotiated procedure, deadline 01.07.2013, for civil and hydromechanical works of Pervari Dam and HEPP project on Botan river in Pervari district of Siirt province, including 970 m-long, 9.5 m-ID diversion tunnel, three cofferdams, 154 m-high concrete face rockfill dam with water intake, 1,335 m-long low pressure energy tunnel with 10.3 m-ID, 96 m-long high pressure energy tunnel with 8 m-ID, and associated shafts and other works including powerhouse with 2 off 195.5 MW Francis vertical turbines and 2 off 9.15 MW Francis horizontal turbines. Contract duration 46 months. Time limit for accessing documents 05.10.2013. Further information, specs and docs from Esra Songur at Enerjisa in Ankara, tel +90 312 58340-59, fax +90 312 4738546, e-mail esra.songur@enerjisa.com to whom tenders or requests to participate must be sent. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=307957-2013. 37/13.



Permalink

Turkey, Siirt - tr/38

Hydropower

Closing Date: 01.07.2013 (Tender Closed)

Invitation to tender by negotiated procedure, deadline 01.07.2013, for construction works of Incir Dam and HEPP project on Buyuk Cay in Siirt province, including 455 m-long, 8.1 m-ID diversion tunnel, three cofferdams, 150 m-high RCC dam with water intake, bottom outlet and two 195 m-long penstocks of diameters 4.2 m and 4.0 m, spillway, 168.4 Mwe powerhouse and associated works. Contract duration 40 months. Time limit for accessing documents 01.06.2013. Further information, specs and docs from Yasemin Eken/Murat Ersungur at Enerjisa in Ankara, tel +90 312 58340-14 or -47, fax +90 312 4738546, e-mail yasemin.eken@enerjisa.com to whom tenders or requests to participate must be sent. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=124259-2013. 16/13.



Permalink

Turkey, Eastern Anatolia - tr/37

Hydropower

Kalehan Enerji Uretim AS has awarded Poyry's Energy business group a EUR 2.9 million contract for detailed design services on the Beyhan 1 hydroelectric project in Turkey. The work will be executed jointly with consortium partner Temelsu. The contract includes execution of the detailed design for civil works of the powerhouse and review of the project's structures, such as the RCC (roller compacted concrete) dam with power intake and penstocks, spillway, diversion structures with three 9.5 m-diameter tunnels with 65 cm-thick lining, lengths 535 m, 572 m, and 608 m, bottom outlet and switchyard. The contract runs to the end of 2013. The installed capacity of Beyhan 1 is 550 MW with an annual generation of 1,245 GWh. The projects of Beyhan and Kalekoy cascade are part of the first hydropower plant projects developed by private investors in Turkey.Visit www.poyry.com and www.temelsu.com.tr. 29/11.



Permalink

Turkey, Adana - tr/36

Hydropower

Closing Date: 30.06.2011 (Tender Closed)

Invitation to tender by negotiated procedure, deadline 30.06.2011, for construction and hydro-mechanical works of 62 MW Dogancay weir and HEPP project located on Dogancay stream in Adana province, including 7.0 km-long, 3.5 m-ID headrace tunnel, underground powerhouse, with 200 m vertical and 500 m horizontal penstock between powerhouse and surge tank. Contract duration 40 months. Time limit for accessing documents 15.06.2011. Further information, specs and docs from Koray Ozbek at Enerjisa in Istanbul, tel +90 312-5834023, fax -4738546, e-mail kozbek@enerjisa.com.tr to whom tenders or requests to participate must be sent. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=167779-2011. 22/11.



Permalink

Award of contract, value EUR42.5 million excluding VAT, for construction and hydro-mechanical works for 62 MW Dogancay weir and HEPP project located on Dogancay stream in Adana province, including 7.0 km-long, 3.5 m-ID headrace tunnel, underground powerhouse, with 200 m vertical and 500 m horizontal penstock between powerhouse and surge tank. Contract duration 40 months. Further information from Melih Keskin at Enerjisa in Istanbul, tel +90 21238588-33, fax –44, e-mail melih.keskin@enerjisa.com. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=411849-2011. 01/12.



Permalink

Invitation to tender by negotiated procedure, deadline 07.04.2014, for completion of the power tunnel and other unfinished work of the 62 MW Dogancay Weir and HEPP project located on Dogancay stream in Adana province: 4 km of 7 km tunnel has been excavated. Rest of the excavation of energy tunnel will be performed with TBM, which is in the tunnel. The underground powerhouse construction has been completed. Time limit for receipt of requests for documents or for accessing documents: 25.03.2014. Contact Mr Erdem Corekcioglu and Mr Kamil Basaraner, Enerjisa, Ankara, tel +90 3125834024/3125834013, fax +90 3124738546, e-mail erdem.corekcioglu@enerjisa.com, kamil.basaraner@enerjisa.com. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=091074-2014. 12/14.



Permalink

Turkey, Adana and Kahramanmaras - tr/35

Hydropower

Closing Date: 01.11.2010 (Tender Closed)

Invitation to tender by negotiated procedure, deadline 01.11.2010, for construction and hydro-mechanical works of 81.3 MW Yamanli 2 weir and HEPP project located on Goksu river in Adana and Kahramanmaras province, including 14.8 km-long, 3.5 m-ID headrace tunnel. Further information, specs and docs from Melih Karadut at Enerjisa in Istanbul, tel +90 312-5834067, fax -4738546, e-mail mkaradut@enerjisa.com.tr. Contract duration 40 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=299751-2010. 41/10.



Permalink

Invitation to tender by negotiated procedure, deadline 01.11.2010 delayed until 08.11.2010, for construction and hydro-mechanical works of 81.3 MW Yamanli 2 weir and HEPP project located on Goksu river in Adana and Kahramanmaras province, including 14.8 km-long, 3.5 m-ID headrace tunnel. Further information, specs and docs from Melih Karadut at Enerjisa in Istanbul, tel +90 312-5834067, fax -4738546, e-mail mkaradut@enerjisa.com.tr. Contract duration 40 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=323513-2010. 44/10.



Permalink

Award of contract, value EUR70.24 million excluding VAT, for construction and hydro-mechanical works of 81.3 MW Yamanli 2 weir and HEPP project located on Goksu river in Adana and Kahramanmaras province, including 14.8 km-long, 3.5 m-ID headrace tunnel. Contract duration 40 months. Further information from Melih Keskin at Enerjisa in Istanbul, tel +90 212-38588-33, fax -55, e-mail mkeskin@enerjisa.com.tr. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=167780-2011. 22/11.



Permalink

Invitation to tender by negotiated procedure, deadline 15.05.2014, for construction and hydro-mechanical works of 81.3 MW Yamanli 2 weir and HEPP project located on Goksu river in Adana and Kahramanmaras province. Further information, specs and docs from Kerem Colak at Enerjisa in Istanbul, tel +90 312-5834024, fax –4738546, e-mail kerem.colak@enerjisa.com.tr. Time limit for accessing documents 08.05.2014. Contract duration 40 months. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=151805-2014. 19/14.



Permalink

Turkey, Trabzon - tr/34

Hydropower

Closing Date: 23.08.2010 (Tender Closed)

Invitation to tender by negotiated procedure, deadline 23.08.2010, for construction of civil and hydromechanical works for 45 MW Cambasi Weir and HEPP project on Solakli river in Trabzon including: 6.38 km-long, 3.5 m-diameter energy tunnel; 1.95 km-long, 4.1 m-diameter transfer tunnel; and two access tunnels and associated works. Further information, specs and docs from Volkan Ceri at Enerjisa in Ankara, tel +90 3125834031, fax +90 3124738546, e-mail vceri@enerjisa.com.tr to whom tenders or requests to participate must be sent. Contract duration 21 months. Time limit for accessing documents 13.08.2010. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=208023-2010. 28/10.



Permalink

Contract awarded for construction of civil and hydromechanical works for 45 MW Cambasi Weir and HEPP project on Solakli river in Trabzon including: 6.38 km-long, 3.5 m-diameter energy tunnel; 1.95 km-long, 4.1 m-diameter transfer tunnel; and two access tunnels and associated works. Bid range EUR34.8 million to EUR50.8 million excluding VAT. Contract duration 21 months. Further information from Melih Keskin at Enerjisa in Ankara, tel +90 21238588-33, fax -55, e-mail mkeskin@enerjisa.com.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=074203-2011. 10/11.



Permalink

Turkey, Provinces of Kocaeli, Sakarya and Bilecik - tr/33

High Speed Railway

A consortium of Cengiz, IC Ictas and Belen consortium will build 39 bored tunnels totalling 39.1 kilometres and three cut-and-cover tunnels, with a total length of 1,550 metres, on the 158 km second stage of the 533 km high speed railway between Ankara and Istanbul. The bored tunnels will be drilled and blasted. The consortium of builders ordered from Atlas Copco 13 L2D underground drill rigs and two D7 surface crawler rigs. The longest tunnel spans 4,960 metres. Click here. Visit www.cengizgroup.com.tr, www.ictas.com.tr, www.belen.com.tr and www.atlascopco.com 52/07-01/08.



Permalink

Invitation for tenders, revised deadline 08.02.2012, for Istanbul-Ankara high-speed railway project procurement of design and construction works between Geyve and Sapanca in Sakarya province, Marmara region. More from general directorate of State railways in Ankara TCDD, e-mail www.tcdd.gov.tr to where tenders should be addressed. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=389809-2011. 50/11.



Permalink

Open invitation to tender, deadline 26.02.2013, for construction work on the Ankara-Istanbul High Speed Train Project, Dogancay Realignment First Section between Ali Fuat Pasa and Dogancay (km 132+560-143+661). Duration of works 240 days. Contact TCDD, Ankara, tel +90 312 3090515/4262, /1802, fax +90 312 3104114, e-mail demiryoluyapimdairesi@tcdd.gov.tr for more information and for submitting tenders. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=002243-2013. Bid code n. 2012/182441. 04/13. 



Permalink

Turkey, Black Sea Region - tr/32

Hydropower

Invitation to tender, deadline 15th August, 2007 for construction of the Artvin-Erzurum relocation road project including eight single-tube tunnels in the first phase, each with two lanes, as part of the Yusufeli dam and hydropower project. NATM to be used. Tunnel lengths are: 100 m, 274 m, 700 m, 262 m, 1,476 m, 340 m, 179 m, and 293 m. The existing road will be submerged when the lake for Deriner dam is formed. Visit www.dsi.gov.tr/english/ilete.htm 31/07.



Permalink

Turkey, Istanbul - tr/31

Sanitation

Turkish contractor í–ztas has signed a contract for the supply of a refurbished Lovat RME136SE series 19500 earth pressure balance TBM that will be employed in the construction of the Gürpinar and Firuzkoy tunnels in Istanbul. The TBM will undergo a complete refurbishment at Lovat's facilities in Toronto. The 3.5 m-diameter mixed face TBM will first bore the 5,227 m-long Gürpinar tunnelpredominantely located in Gürpinar formation, mainly anticipated to consist of hard to stiff over-consolidated plastic clay with some weak sandstone, siltstone, claystone and tuff. A small portion of the tunnel alignment will be in a formless landslide complex consisting of water saturated sand layers. A faulted zone is likely to be encountered, in which greater water inflow is expected. The entire alignment is below the groundwater level, with a maximum groundwater height above the tunnel invert of 60 metres.The TBM will then bore the 3,770 m-long Tahtakale-Ambarh wastewater tunnel in Firuzkoy through three distinctive formations: the Kusdili formation, consisting of very soft to firm sandy silty clay, the Ceylan formation, consisting of limestone with marl fragments and clay layers, and also through the Gürpinar formation as described above. Groundwater levels will vary from one to 48 metres below the surface, with the entire alignment below the groundwater level. The TBM is scheduled to be delivered to Istanbul prior to year's end. Visit www.lovat.com and www.oztas.com.tr 23-24/07.



Permalink

Turkey, Istanbul - tr/30

Highway

Invitation to tender, deadline 12th June, 2007 for BOT concession contract for a road tunnel crossing under the Bosphorus. The project will connect Kazlií§esme region on the European side with Göztepe road crossing on the Asian side. The tunnel will be a two-deck two-lane link for only light vehicles. The tunnel includes a 3.3 km undersea section and 2.1 km connecting roads, totalling 5.4 km. The toll booths will be on the European side. The concessionaire will carry out advanced engineering studies and the final application project preparation works, including geological and geotechnical work. He will also finance and operate the tunnel. Read E-News Weekly 43/2006 for more. Contact General directorate of railways, harbours and airports (DLH), Mr Mehmet Korkmaz, tel. +90 3125501717, fax +90 3125501718, e-mail mkorkmaz@ubak.gov.tr 05/07.Two consortiums have made offers for the BOT concession contract for an immersed highway tunnel project to connect the European and Asian sides of Istanbul. The Turkish-Korean Joint Venture (TKJV) made up of Turkey's Yapi Merkezi and South Korean companies SKEC, Samwhan Corp., Hansin, Namkwang Engineering & Construction and Kukdong Corp. as well as a consortium of Turkish firms Cengiz, Makyol and Dogus and France's VINCI submitted their bids in a tender organised by the Railroads, Ports and Airports Construction General Directorate (DLH) of the Ministry for transport. The tunnel, to be constructed under the Bosphorus, will connect the two sides of Istanbul. It will have two levels of traffic and two lanes per direction. Each level will be dedicated to one direction of traffic. Planned to be completed in around three years, the project will consist of tunnelling methods such as advanced TBM technology for the parts under the sea and open cut and NATM for other parts. The total length of the project including connecting roads will be 5.5 km. The length of the TBM tunnel will be 3.34 km, with internal diameter of 11.4 metres and external diameter of 12.4 metres. The NATM cross-section will be 15 m wide and 22 m high, whereas the open cut cross-section will be 10 mwide and 6 m high. Visit www.dlh.gov.tr 28/08.In the tender organised by the transportation ministry's railroads, ports and airports construction general directorate (DLH), a Turkish-French consortium formed by Cengiz, Makyol, Dogus and VINCI offered the lowest bid in a tender for the construction of a road tunnel project that is to connect the European and Asian sides of Istanbul. The consortium offered a contract period of 19 years for the tunnel, six years for investment and 13 years for running. The tunnel will be located deeper than the tubes of the Marmaray project, a railway project currently under construction that will also link the two sides of the city. The tunnel, to be constructed under the Bosphorus, will have two levels and two lanes. Each level will be dedicated to one direction of traffic. Click tr/30. Visit www.dlh.gov.tr 34-35/08.



Permalink

The Avrasya Tuneli (Eurasia Tunnel) AS (an SPV incorporated to execute the Project, “ATAS” in short) signed the finance documents on 11.12.2012 in Ankara. ATAS, jointly owned by Yapi Merkezi and SK Engineering & Construction of Korea, will have the right to build and operate for 30 years the Eurasia tunnel for light motor vehicles, a 5.4 km-long tunnel some 25 m-deep beneath the Bosphorus in Istanbul. Overall length of the project is 14.6 km, for which construction of the approach roads will start at the Asian side. Start of commercial operation is scheduled for late-2016 or early-2017. Visit www.ym.com.tr. 51/12

.

 



Permalink

The consortium Italferr (Italy)/Altinok (Turkey) has been awarded the EUR3.9 million contract for the supervision of works and design review of Eurasia Tunnel, the undersea road tunnel that will connect the European and Asiatic sides of Istanbul. The Eurasia Tunnel, about 15 km-long, including 3.4 km below sea level, at a depth of about 25 m, crosses the Bosphorus Strait in parallel with the Marmaray rail tunnel. Once completed, it will allow the connection between the two continents in 15 minutes, compared to the current 100 minutes. The entire project is funded by the European Bank for Reconstruction and Development (EBRD) with a loan of EUR110 million. Visit http://www.fsnews.it/cms/v/index.jsp?vgnextoid=43c6b7e482506410VgnVCM1000008916f90aRCRD. 24/14.



Permalink

Page: