United Kingdom

United Kingdom, Amesbury - uk/34

Highway

Restricted invitation to tender, deadline 16th May, 2001, for design and target cost construction of $150 million, 2 km-long Stonehenge bypass tunnel in chalk for UK Highways Agency, Birmingham, fax +44 (0)1216 788299. World heritage site, for which TBM would be the natural choice. Visit www.mottmac.com and www.highways.gov.uk 18/01. Prequalification list for tunnel to divert A303 road around Stonehenge World Heritage site includes Costain-Balfour Beatty, Skanska, Mowlem-Miller, Sir Alfred MacAlpine-Amec, and Sir Robert MacAlpine-Bouyges. This is notionally a cut and cover tunnel with bored option. However, cut and cover is not a realistic proposition in an area of such archaeological importance, so the underground option is likely to be chosen. Visit www.highways.gov.uk 38/01.A jv between Balfour Beatty and Costain has been awarded an improvement scheme contract for the A303 road close to Stonehenge by the Highways Agency. The project includes a bypass for the village of Winterbourne Stoke and a 2 km tunnel for the A303. The jv will be supported by designers Halcrow and Gifford. Construction work to start in 2005, subject to Public Inquiry. Visit www.highways.gov.uk 14/02.The government has shelved plans to build a 2.1 km tunnel by burying the A303 in the surroundings of Stonehenge because the tunnel's estimated cost has ballooned from GBP284 million two years ago to GBP470 million. The new estimate would have made the Stonehenge tunnel one of the most expensive stretches of road ever planned, exceeding the 1.6 km Limehouse link tunnel from the City to Canary Wharf in east London, which cost GBP450 million in the early 1990s. The increase in the cost was due to two main factors: very large quantities of soft, weak chalk and a high water table, with the ground water potentially rising to the surface at times of heavy rainfall. These factors would significantly complicate the tunnelling process and extend the overall construction period of the scheme. Construction was due to have started this spring and the tunnel would have been completed by 2009. Click uk/34. 30/05.



Permalink


Highways England has been awarded to an Atkins/Arup joint venture. It is a package of work with an estimated value of EUR23.04 million to design options for A303 between Amesbury and Berwick Down to take to public consultation and ultimately to find a preferred route announcement. The scheme includes a tunnel near Stonehenge and a bypass for the village of Winterbourne Stoke. Subject to statutory procedures, the proposed scheme is on target for construction work to start by April 2020.

The design team, appointed under Highways England’s Collaborative Delivery Framework (CDF), will provide technical services including highway and tunnel design, environmental and geotechnical engineering, acoustics and prepare a public consultation on options in readiness for a preferred route announcement. Visit https://www.gov.uk/government/news/contract-awarded-for-the-a303-between-amesbury-and-berwick-down-stonehenge, http://www.arup.com/ and  http://www.atkinsglobal.com. 04/16. 




Permalink


Open invitation to tender, deadline 28.09.2016, for a Technical Partner for A303 Amesbury-Berwick Down project. Value contract EUR47.15-59.94 million, excluding VAT. Duration contract 93 months from award. Contact Highways England, Woodlands, attn Annabel Dunn, Bedford, tel +44 3004704819, e-mail Annabel.Dunn@highwaysengland.co.uk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=268817-2016. 31/16.




Permalink

Prior information notice without call for competition for the A303 Amesbury to Berwick Down project which passes through the Stonehenge, Avebury and Associated Sites World Heritage Site (WHS).

Highways England, charged with operating, maintaining and improving England's motorways and major A roads, wishes to formally make the market aware of potential opportunities in relation to the project.

The project comprises of a new dual, two-lane carriageway approximately 13 km long between Amesbury and Berwick Down consisting of  a bypass to the north of Winterbourne Stoke with a viaduct over the River Till; a new junction between the A303 and A360 to the west of and outside the WHS, replacing the existing Longbarrow Roundabout; a twin-bore tunnel through the WHS and past Stonehenge c.2 miles in length; a new junction between the A303 and A345 at the existing Countess Roundabout.

Estimated date of publication of contract notice: 31/07/2019.

For additional information please visit

https://www.gov.uk/government/organisations/highways-england.

For more information on the A303 Stonehenge project please visit https://highwaysengland.co.uk/projects/a303-stonehenge-amesbury-and-berwick-down/.

Contact Highways England, Birmingham, tel +44 1210000000, email cipmarketengagement@highwaysengland.co.uk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=056979-2019.

21/19.



Permalink

Competitive dialogue, deadline 13.09.2019, for the A303 Amesbury to Berwick Down project which passes through the Stonehenge, Avebury and Associated Sites World Heritage Site (WHS). The project comprises of a new dual, two-lane carriageway approximately 13 km long between Amesbury and Berwick Down consisting of  a bypass to the north of Winterbourne Stoke with a viaduct over the River Till; a new junction between the A303 and A360 to the west of and outside the WHS, replacing the existing Longbarrow Roundabout; a twin-bore tunnel through the WHS and past Stonehenge 3.3 km in length; a new junction between the A303 and A345 at the existing Countess Roundabout. Value contract EUR1.39 bn (GBP1.25bn), excluding VAT. Duration of the contract is from 04/01/2021 to 31/12/2034.

For bid documents https://highways.bravosolution.co.uk where offers must be sent. Contact Highways England Company Ltd, Birmingham, email procurementa303@highwaysengland.co.uk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=328673-2019.

30/19.



Permalink

Highways England has shortlisted the following three international groups to build the EUR1.85 bn (GBP1.7bn) Stonehenge tunnel:  BM JV (Bouygues Travaux Publics SAS and J Murphy & Sons Ltd), HD JV (Hochtief Infrastructure GmbH and Dragados SA) and MORE JV (FCC Construccion SA -42.5%, Salini Impregilo SPA-42,5% and BeMo Tunnelling UK Ltd -15%). The three groups in the next 6 months will have a competitive dialogue with Highways England. They  have to submit their final tenders by October. The winner will be announced in 2021.

At the beginning of March in the 2020 budget document from the UK government confirmed the funding of the new, high-quality dual carriageway and of the two-mile tunnel in the South West to speed up journeys on the A303 removing traffic from the iconic setting of Stonehenge.

The government is transforming regional connections through the largest ever investment in England’s motorways and major A roads. The second Road Investment Strategy (RIS2) will spend over £27 billion between 2020 and 2025. The project is included in the RIS2. For further information please use this link . 13/20.



Permalink


Wessex Archaeology Limited secured the  EUR38.46 million (GBP35 million) contract for archaeological protection and excavation work ahead of the A303 Amesbury to Berwick Down (Stonehenge ) upgrade. The  contract has been awarded now to enable Wessex Archaeology to start their pre-planning, with fieldwork not expected to start until late spring 2021, should planning consent be granted for the scheme. Visit https://www.gov.uk/government/news/highways-england-announces-archaeological-specialists-for-a303-upgrade-near-stonehenge. 44/20



Permalink

National Highways (UK) selected the More Joint Venture composed of Webuild (42,5%), FCC Construccion (42.5%) and BeMo Tunnelling (15%) as its Preferred Bidder for the GBP1.25 billion (EUR1.48 billion) contract for the tunnel and main construction work for the A303 Amesbury to Berwick Down scheme past Stonehenge. The A303 Stonehenge - Main Works Contract covers the construction of the proposed 2 miles (3.3 km) tunnel’s civil, structural, mechanical, electrical and technology components along with the approach 8 miles (approximately 13 km) of free-flowing, high-quality dual carriageway roads, a new bypass to the north of the village of Winterbourne Stoke and junctions with the A345 and A360 either side of the World Heritage Site. Estimated duration construction works 5 years.    

The tunnel alignment will be underneath the World Heritage Site, closely following the existing A303 route, but a further 50 metres away from the Stonehenge monument, avoiding important archaeological sites, and avoiding intrusion on the view of the setting sun from the stones during the winter solstice .  

The contract will only become live once the Secretary of State for Transport has concluded the current process of relooking at the planning application for scheme, following the quashing of the decision to grant the Development Consent Order last year.   

The More Joint Venture will be supported with a design partnership made up of Atkins, Jacobs and Sener.  



Permalink


Mace, the international construction and consultancy company, has won on a five-year contract to deliver commercial services on two of National Highways’ major projects through its Complex Infrastructure Programme (CIP).  

Following Mace’s appointment to Lot 1 of the £420m National Highways framework for commercial and project management services in 2021, the company has been appointed as the Complex Infrastructure Programme (CIP) Commercial Partner on the delivery of both the A428 Black Cat to Caxton Gibbet improvements, and the A303 Stonehenge between Amesbury and Berwick Down dualling scheme.  

Mace’s work will involve delivering commercial services including cost consultancy and quantity surveying, as well as acting as a liaison between National Highways and its main contractors.  

National Highways’ CIP is focused on delivering more complex and higher value improvement schemes, focused on nationally important infrastructure. Visit https://www.macegroup.com. 24/22. 




Permalink


The MORE consortium composed of Webuild (42.5%), FCC Construcción (42.5%) and BeMo Tunnelling UK (15%)  secured the A303 Stonehenge – Main Works Contract, value EUR1.5bn (GBP1.25-bn),  to improve the A303 trunk road and excavate a tunnel near Stonehenge between Amesbury and Berwick Down in southern England. The signing of the definitive contract comes after the Group and its partners were named preferred bidders in May.  

The contract entails building a near 13-km dual carriageway with a 3.3-km tunnel that will remove traffic that passes through the UNESCO World Heritage Site and return the landscape to something resembling its original setting. 

The contract covers the construction of the proposed tunnel’s civil, structural, mechanical, electrical and technology components, including the TBM, along with the approach roadworks and structures and the environmental components. Construction is to last five years. 

Visit https://www.webuildgroup.com, https://www.fccco.com and https://www.bemo.net/ and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=551530-2022. 39/22. 



Permalink

United Kingdom, Dartford - uk/33

Electricity

Amec has been awarded a £16.1 million contract to construct a high voltage cable tunnel in Dartford for the National Grid Company. The tunnel length is 2.4 km in length and 3 m internal diameter. It will be driven under the River Thames at depths up to 30 metres through Upper Chalk, Seaford and Lewes formations. Amec will use one of its Lovat TBMs, upsized to 3.5 metre external diameter, operating in earth pressure balance mode. The lining will be precast concrete trapezoidal segments produced and supplied by C V Buchan, a sister Amec business. The segments are 3.35 m external diameter, 1.2 m long, with 6 plates to a ring. Babtie Group are National Grid Company's designers and project supervisors. Tunnelling will start in August 2003 and is programmed to last four months. The contract value includes extensive civil engineering, mechanical and electrical and other works. The project will be financed by the National Grid Company. Visit www.amec.com 14/03.



Permalink

United Kingdom, Dunfermline - uk/32

Sewer

Contract under negotiation for construction of East Trunk sewer from Dunfermline to North Queensferry STW, 3.45 km-long x 2 m-diameter and gradient 1:300 at depths of 5-50 m through sedimentary and igneous rocks. Main consultant, Mott McDonald, Glasgow; hydraulics design, East of Scotland Water (Waterway Consultants) and University of Abertay; site investigations, WIMTEC; project sponsor, Jim Thomson, East of Scotland Water Authority, fax +44 1383 848417 or visit www.eswa.org.uk November 2000.



Permalink

United Kingdom, Cambridge - uk/31

Sewer

Contract award to Barhale Construction for 2.1 km-long x 1.2 m-diameter drainage tunnel value $3 million to be excavated using shielded TBM over 44 week period for Anglian Water and Cambridge city council. Visit www.barhale.co.uk October 2000.



Permalink

United Kingdom, Stirling - uk/30

Water Supply

Award of $140 million design/build contract for Loch Katrine scheme including two 1.8 m-diameter TBM tunnels totalling 1 km in length to Stirling Water consortium comprising Gleeson, Thames Water, and Montgomery Watson. Work at site to start mid-2002 for completion 2005. Visit www.thames-water.com 24/01.



Permalink

United Kingdom, Stansted - uk/29

Light Rail

Design and construction underway for 10m wide twin bore light rail cut-and-cover tunnels for an extension to passenger transit system at Stansted airport with station at Satellite Building No. 3 designed by the BAA/Brown & Root/Laing airport infrastructure team for completion early 2001. Visit www.halliburton.com August 2000.



Permalink

United Kingdom, London - uk/28

Cable Duct

City of London project comprising 2.8 km of 2.59 m and 2.44 m-diameter tunnels into which six 132kV circuits will be installed to enable linking of three inner London sub-stations. Designed by Brown & Root and constructed by J Murphy and Sons for London Electricity. Weaving alignment avoids other cable ducts, underground railways, large sewers and telecomms. Lovat ME116SE series 11400 2.95 m-diameter EPBM erecting Macrete concrete wedge block lining due to complete September, 2000. Further 1.2 km of tunnel in design to link a fourth sub-station into the network adjacent to the Tate Art Gallery includes a Thames crossing. Visit www.halliburton.com, www.macrete.com and www.lovat.com August 2000.Negotiated procedure, deadline 31st December, 2002 for construction of a 1.2 km-long 2.59 m-diameter tunnel through Woolwich and Reading Beds and London Clay to connect the Bankside main substation to Farrington Street. Work to commence in second quarter 2003 with completion by end-2004. Visit http://ted.eur-op.eu.int/udl?request=Seek-Deliver&language=en&docid=186483-2002, OJ S 234, or contact 24seven Utility Services Ltd, Bexleyheath, fax +44 2082988104. 50/02.Restricted procedure, deadline 18th March, 2005 for design and construction of the Lower Lea Valley cable tunnels, consisting of one or two tunnels (between Hackney and West Ham substations) with diameters in the range 2.5 m to 6 m and a route length of approximately 5.6 km each, together with associated works. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=024856-2005, OJ S 26, or contact London Development Agency, London, fax +44 2076802040. E-mail andrewlomas@lda.gov.uk or tunnelworks@lda.gov.uk 07/05.J Murphy & Sons has been appointed to build massive tunnels which will replace overhead power lines that cut across a swathe of east London. The GBP70 million project is the first phase of a GBP200 million scheme, in which 50 huge electricity pylons will be removed. The removal of pylons will free up more than 40 hectares of land for development of the Olympic Park for the 2012 Games in London. Builders will construct 12 km of tunnels to replace power lines which run across the Lower Lea Valley. Two power tunnels will be constructed 20 m underground, one at 2.5 m for EDF Energy and the other 4 m in diameter for National Grid. The larger is on the same scale as a London metro tunnel and will have its own monorail running down the middle for inspection and servicing. The tunnelling work comprises two cable tunnels and associated shafts. The tunnels will each be approximately 6 km. Visit www.lda.gov.uk and www.murphygroup.co.uk 35/05.



Permalink

United Kingdom, London - uk/27

Electricity Transmission

National Grid Company undertaking 3 m-diameter x 20 km-long cable tunnel from Elstree to St John's Wood at 20 m depth with seven shafts 20 m to 40 m deep. Ventilation and control buildings will be sited at Kilburn, Cricklewood, Colindale, Canons Corner and Elstree. Bidding process complete and award due October. Shortlist contractors are Murphy, AMEC, Miller and Amey. Visit www.halliburton.com and www.nationalgrid.com June 2000. Contractors Amec and Murphy shortlisted for $60 million, 20 km-long St Johns Wood to Edgware segmentally lined TBM tunnel with 5 shafts for National Grid. Award expected early-2001 for immediate start. Visit www.halliburton.com November 2000.Appointment of Murphy as preferred contractor for 20 km x 3 m-diameter segmentally lined tunnel with five shafts from Elstree to St John's Wood. Three TBMs will drive concurrently from 20 m-deep shafts at Elstree and in both directions at Cricklewood. Visit www.murphygroup.co.uk 02/01.



Permalink

United Kingdom, Falkirk - uk/26

Canal

British Waterways has awarded the contract to construct a $2.4 million, 150 m-long, 7m-diameter tunnel to connect the disused Forth & Clyde and Union canals near Falkirk to regenerate the canal corridor across the Scottish Lowlands, from Glasgow through to Grangemouth and Edinburgh. Main contractors for the scheme are a jv of Morrison Construction Ltd and Bachy-Soletanche. The tunnelling work is sub-contracted on a design and construct basis to Spray Concrete Ltd in association with Joseph Gallagher Ltd whose tunnel designer is High-Point Rendel. Excavation in boulder clay overlying coal measures strata will be carried out using a Schaeff ITC 112 E3 backhoe/loader and the tunnel will be lined with sprayed concrete. A novel feature of the tunnel will be that it will pass above abandoned claystone workings and will be required to withstand possible future collapse. To achieve this the tunnel, and canal base, will be specially strengthened to bridge an anticipated maximum void created by a roof failure in the room and pillar workings some 20m below the tunnel invert. The tunnel also passes below the remains of the Antonine Wall, a 60 km-long Roman earthworks structure dating from the second century AD and constructed some 160 km north of the more famous Hadrian's wall. More from hprendel@btinternet.com March 2000.  Good progress reported on 147m-long, 7m-diameter Roughcastle tunnel, part of the new Millennium Link Canal connecting the Forth & Clyde and Union canals. Classical NATM method with single side drifts in the boulder clay of the upper half excavated using a Schaeff ITC 112 E3 backhoe/loader with a rock breaker attachment. Holethrough of first side drift expected next week. Bench to be excavated in sandstones and mudstones using a road planer. This method used successfully on the Channel Tunnel Rail Link North Downs tunnel in chalk (see uk/20). August 2000.



Permalink

United Kingdom, London - uk/25

Underground

  Westminster, the final station on the Jubilee Line Extension, opened on 22nd December just in time to ferry members of Parliament to the Millennium Dome for the New Year celebrations. The line had been opening in sections since 14th May, 1999 and trains had been running along its full length since 20th November without stopping at Westminster. The new station extends 38.2 m below street level to service the JLE lines (which are stacked at this point) and interchanges with the existing Circle and District line. It has 17 escalators, two elevators and four fixed stairways from the JLE platforms to the ticket hall, and another two elevators and two staircases from the Circle and Disrict line. The station forms the foundation for Portcullis House, a new office block opposite Big Ben reputed to be the most expensive accommodation in London at $1.6 million/room. January 2000. The Crossrail and Chelsea-Hackney underground railway proposals have received a $200 million allocation to fund further design work, for which tenders will be invited soon. Administrators will be Sir Alastair Morton's Strategic Rail Authority and Mayor Livingstone's Transport for London, run by Bob Kiley. Both schemes have been on the back burner for years, with Crossrail having completed its final design in the early nineties. Mott MacDonald and Maunsell designed the Crossrail tunnels; Symons/Travers Morgan, Liverpool Street station; Babtie, Farringdon station; Mott MacDonald, Tottenham Court Road station; Halcrow, Bond Street station; and Benaim/Golder, Paddington station. Dr Sauer was NATM consultant. Halcrow had earlier completed the preliminary design for the Chelsea-Hackney line.Crossrail was kicked into touch in favour of the Jubilee Line Extension, a project subsequently consigned to the Chamber of Horrors on account of its time and cost overruns. Before Crossrail can be tendered, Messrs Morton and Kiley have to overcome the public resentment generated by the JLE debacle. In the meantime, they have briefs to remedy the infrastructural dereliction of both Railtrack and London Underground. With the best will in the world, they cannot do both, and Crossrail will be the inevitable loser. Visit www.dr-sauer.com 27/01.A team led by Balfour Beatty Civil Engineering including Balfour Kilpatrick for the mechanical and electrical works and Stent for ground improvement, has secured a GBP115 million contract. The scope of the work is predominantly below ground and comprises the construction of the Northern ticket hall adjacent to King's Cross main railway station. It includes construction and fitout of a three-storey concrete box which will provide improved access to the Northern, Piccadilly and Victoria lines via new escalators and accessible lifts. Fitout works include both architectural finishes and the installation of a full range of building services.Mobilisation has already started and work will start in the summer. The works will be undertaken without impeding the station's 80 million annual passengers. Partial completion of the works in 2008 will allow access for Network Rail to proceed with the redevelopment of the mainline station. When finished in 2011, the station is estimated to be handling 92,000 passengers during the daily morning peak. Works at both the underground and mainline stations will be completed for the 2012 Olympics. Visit www.balfourbeatty.com 23/06.The Morgan Est / Beton- und Monierbau joint venture (MBJV) has been awarded a GBP55 million programme of tunnelling works by Metronet Rail to provide additional underground pedestrian links at King's Cross station. The tunnelling works form part of the new Northern ticket hall that will link the metro station to the King's Cross and St Pancras main line stations and the new Channel Tunnel Rail Link terminus at St Pancras. The contractors will build over 300 linear metres of tunnels ranging from 4 metres to 9.5 metres in diameter. These will then connect and provide passengers with new underground links from the Northern ticket hall to the deep-level Piccadilly, Northern and Victoria lines. The works will also include the construction of stairways, escalator shafts and an elevator shaft which will provide lifts for the mobility impaired within the underground station. The project involves building new works underneath King's Cross main line station and adjacent to St Pancras Chambers, which are Grade I listed, and the Great Northern Hotel, which is Grade II listed. The tunnelling project is due for completion in spring 2008. View schematic here. Read E-News Weekly 23/2006. Visit www.morganest.com and www.bemo.net 23/06.Negotiated call for bids, deadline 4th February, 2008 for the Victoria station upgrade, comprising civil engineering, fit-out and services installations for a new subsurface Northern ticket hall, for extension to existing subsurface Southern ticket hall, new subsurface tunnels to provide access to existing platforms, and other minor works. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=7696-2008, OJ S 7, or contact London Underground Ltd, London, fax +44 2079183800. E-mail chris.eaglen@tube.tfl.co.uk 05/08.Negotiated procedure, deadline 03.11.2008, for design, supply, installation, commissioning and maintenance of integrated distributed control system (TCCS) for cooling and ventilation equipment for a number of ventilation shafts and stations on the London Underground system, value STG4 million, duration of contract 48 months. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=260596-2008, OJ S 197. Contact Julian Frost at LUL, julian.frost@tube.tfl.gov.uk More at www.tfl.gov.uk 44/08.Invitation to tender by negotiated procedure, deadline 20.02.2009, for repair and maintenance services of underground installations operated by Metronet. Five year overall value of contracts ranges from EUR517 million to EUR595 million. Companies expressing interest will be sent a prequalification questionnaire. Further information from Alan Chowles at Metronet, tel +44 2070 384504, e-mail TPSInfo@metronetrail.com. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=008978-2009 03/09.



Permalink

Invitation to tender by negotiated procedure for maintenance of mechanical and electrical and fire systems in Jubilee, Northern and Piccadilly Lines on London Underground network. Expressions of Interest are invited for Lot 1 or Lot 2 or for both Lots. Contract value EUR57.3-68.7 million (GBP 50-60 million), duration 96 months. The programme may be for the M & E systems maintenance to commence in Summer, 2010 and for the fire systems maintenance potentially to be added in Spring, 2013. Contact Paul Headington at Tube Lines Limited, 15 Westferry Circus, Canary Wharf, London E14 4HD, tel +44 2070885880, e-mail paul.headington@tubelines.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=244469-2009. 36/09.



Permalink

Invitation to tender using restricted procedure, deadline 07.06.2010, for SMEs and BMEs to support Mouchel prequalification process for TfL Engineering and Project Management Framework TFL 900001. Download documentation and submit tenders at www.competefor.com. TED document reference number GB003ZM8016. 21/10.



Permalink

Invitation to tender using negotiated procedure, deadline 19.12.2011, for Bank station capacity upgrade project which includes new surface ticket hall, diversion of southbound Northern line running tunnel for 570 m, and formation of new southbound platform. Contract starts 04.06.2013 for completion 31.12.2021. Expressions of interest by e-mail to BankSCUProjectProcurement@tfl.gov.uk. Pre-qualification questionnaires will be issued on 20.12.2011. Further information, specs and docs from Paul Wiltshire, Commercial Manager at London Underground Ltd in London, tel +44 2079180390, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=363980-2011. 47/11.



Permalink

Periodic information notice for DeepTube Programme railway control system high bandwidth communications technology options for upgrade of Bakerloo, Piccadilly, Waterloo & City and Central lines. Further information from Neil McFadden at LUL in London, e-mail neil.mcfadden@tube.tfl.gov.uk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=369366-2012. 52/12.



Permalink

Periodic indicative notice without call for competition for technical dialogue feasibility stage for mechanization maintenance and renewals vehicles. The vehicles will be used in the deep tube tunnel environment and will need to be able to operate in the confined space of a single bore tunnel. Contact Ben Edwards, London Underground Ltd in London, tel +44 2070383019, e-mail trackprocurement@tfl.gov.uk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=427573 -2013. 51/13.



Permalink

Periodic information notice for Railway Control Systems in Piccadilly, Central, Bakerloo, and Waterloo & City lines for London Programme (NTfL). Expressions of Interest are required by noon on 08.09.2014. Further information from Stuart Hardy at London Underground Limited (LUL) in London, tel  +44 2070384285, e-mail ntflrcspin@tfl.gov.uk. Expressions of Interest are required by noon on 08.09.2014. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=233009-2014 and

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=288116-2014.

35/14.



Permalink


Invitation to tender by negotiated procedure, deadline 12.10.2015, for  the complete upgrade of 4 London Underground mid-tunnel ventilation systems. Three sites are on the Jubilee Line and one site is on the Northern Line. Works include removal of the existing ventilation systems, installation, commissioning and handover of upgraded systems on London Underground network. Duration of the contract is from 01.04.2016 to 31.12.2017.  For further information, electronic submission of tenders and requests to participate https://eprocurement.tfl.gov.uk/epps/home. Contact Ethnie Abbasali at Transport for London - London Underground (Line Upgrades), London, e-mail ethnieabbasali@tfl.gov.uk , julian.frost@tube.tfl.gov.uk . Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=325884-2015. 39/15.




Permalink


Negotiated invitation to tender, deadline 12.05.2016, for the provision of a new railway communications based train control (CBTC) system for the Piccadilly line which is part of the London Underground with options for Waterloo and City, Central and Bakerloo lines. Time limit for receipt of requests for documents or for accessing documents is 22.4.2016 - 12:00. The duration of the contract is from 29.10.2018 to 01.11.2058. Contact London Underground Ltd, London, e-mail NTFLSTCPIN@tfl.gov.uk. For electronic access to information  https://lucpd.bravosolution.co.uk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=98608-2016. 12/16.




Permalink

Dyer and Butler Ltd from Southampton secured the EUR 6.87 million contract, excluding VAT, for  the complete upgrade of 4 London underground mid-tunnel ventilation systems. Three sites are on the Jubilee Line and one site is on the Northern Line. Works include removal of the existing ventilation systems, installation, commissioning and handover of upgraded systems on the London Underground network. Contact Transport for London - London Underground (Line Upgrades), att.n Julian Frost, London, e-mail julian.frost@tube.tfl.gov.uk. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=167872-2016. 20/16.



Permalink

Negotiated invitation to tender, deadline 10.04.2019, for minor, additional and ad hoc FM Works within the TfL and London Underground infrastructures. The contract is composed of 5 lots. The value of the contract is EUR99.66 million (GBP 85 million). The duration of the contract is 48 months. For bid documents https://procontract.due-north.com where tenders must be sent. Contact Transport for London, London, attn Paul Booth,  email PAULBOOTH2@TFL.GOV.UK.. Visit

http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=118260-2019.

Ref.n. DN391299. 11/19.



Permalink

Transport for London has shortlisted the 4 bidders - Axia SC Consortium, BAI Communications, Cellnex UK Ltd and Wireless Infrastructure Group - for a contract to roll out 4G mobile connectivity across the underground sections of the London Underground network. TfL is working with the UK’s 4 mobile network providers to install 4G connectivity on a trial section of the Jubilee Line between Westminster and Canning Town. It expects connectivity within most stations and tunnels from March 2020; TfL plans to install more than 2,000km of cabling on this section.

Once the concession contract is awarded, the pilot area may be subject to changes. The pilot section is envisaged as the first step to rolling out mobile connectivity across the whole of the London Underground by the mid-2020s. Visit https://tfl.gov.uk. 30/19.

 

https://tfl.gov.uk/info-for/media/press-releases/2019/july/4g-on-jubilee-line-tunnel-section-from-march-2020



Permalink