Turkey

Turkey, Istanbul - tr/46

Kirazli-Halkali Metro

Closing Date: 18.07.2016 (Tender Closed)


Open invitation to tender, deadline 18.07.2016, for Kirazli-Halkali metro line construction and E&M works. The tender includes construction work for an underground transfer center (Parking) and storage area. The 9.7 km long metro line consisting of 9 stations is on the Istanbul European side. The duration of the contract is 1080 calendar days after site delivery. Contact Istanbul Metropolitan Municipality Additional Service Building, Gungoren-Istanbul, tel 0 212 4494 175, -184, -180, e-mail hasan.pezuk@ibb.gov.tr. The tender documents are available by logging in at https://ekap.kik.gov.tr/EKAP/ and upon payment of 2,500 TRY (Turkish lira). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=168126-2016. Ref.n. 2016/147823. 21/16.




Permalink


Open invitation to tender, deadline 09.08.2016, for Kirazli-Halkali metro line construction and E&M works. The tender includes construction work for an underground transfer center (Parking) and storage area. The 9.7 km long metro line consisting of 9 stations is on the Istanbul European side. Value contract EUR1-1000 million, excluding VAT. The duration of the contract is 1020 calendar days after site delivery. For electronic access to information http://www.ibb.gov.tr/tr-TR/kurumsal/Birimler/AvrupaYakasiRayliSistemlerMD/Pages/Anasayfa.aspx#.V0abGPmLQdU. Documents are available by logging in at https://ekap.kik.gov.tr/EKAP/ and upon payment of 1 000 TRY (Turkish Lira) for the pre-qualification document and 1 500 TRY (Turkish Lira) for the tender document. Contact Istanbul Metropolitan Municipality, attn Hasan Pezuk, Director of European Side Rail Systems, Gungoren-Istanbul, tel +90 212 4494175, fax +90 212 4494180, e-mail hasan.pezuk@ibb.gov.tr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231052-2016. Ref.n. 2016/252446. 28/16.




Permalink


The open invitation to tender, deadline 18.07.2016, for Kirazli-Halkali metro line construction and E&M works has been cancelled. The tender includes construction work for an underground transfer center (Parking) and storage area. The 9.7 km long metro line consisting of 9 stations is on the Istanbul European side. Contact Istanbul Metropolitan Municipality Additional Service Building, Gungoren-Istanbul, tel 0 212 4494 175, -184, -180, e-mail hasan.pezuk@bb.gov.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234326-2016. Ref.n. 2016/147823. 28/16.




Permalink


DISCONTINUED - The awarding procedure, deadline 09.08.2016, for Kirazli-Halkali metro line construction and E&M works has been discontinued. The tender includes construction work for an underground transfer center (Parking) and storage area. The 9.7 km long metro line consisting of 9 stations is on the Istanbul European side. Contact Istanbul Metropolitan Municipality, attn Hasan Pezuk, Director of European Side Rail Systems, Gungoren-Istanbul, tel +90 212 4494175, fax +90 212 4494180, e-mail hasan.pezuk@ibb.gov.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=278240-2016. Ref.n. 2016/252446. 32/16.




Permalink

The Municipality of Istanbul secured to the Astaldi Group (15%) in a joint venture with Turkish companies Makyol (29%), Ictas (28%) and Kalyon (28%) the EUR 627 million EPC contract, to carry out the civil works and the E&M systems of the Kirazli-Halkalı section of the Istanbul Underground. The project calls for building 10 km of double-tube tunnels, 7 km of which will be made using a TBM. There will be 9 stations with annexed car parks and a depot area. The works will begin in next few days and are scheduled to take about two and a half years. Visit http://www.makyol.com.tr/en, http://www.ictas.com.tr/EN, http://www.kalyongrup.com/en-us/homepage.aspx http://www.astaldi.com/ .15/17.



Permalink

Turkey, Istanbul - tr/45

Umraniye-Atasehir-Goztepe Metro

Open invitation to tender, deadline 20.07.2016, for the Umraniye-Atasehir-Goztepe subway line construction and E&M systems procurement including installation and commissioning works. The total length is a 13 km section with 11 stations and is on Istanbuls Asian side. The duration of the contract is 1080 calendar days after site delivery. Contact Seyrantepe Metro Tesisleri, Seyrantepe SARIYER/Istanbul, tel/fax 0212 312 65 15 - 0212 455 43 73, e-mail abdullah.ozovali@ibb.gov.tr. The tender documents are available by logging in at https://ekap.kik.gov.tr/EKAP/ and upon payment of 2,500 TRY (Turkish lira). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=165652-2016. Ref.n. 2016/154433. 20/16.



Permalink

Open invitation to tender, deadline 10.08.2016, for the Umraniye-Atasehir-Goztepe subway line construction and E&M systems procurement including installation and commissioning works. The total length is a 13 km section with 11 stations and is on the Istanbul Asian side. Value of the contract is EUR1-1000 million, excluding VAT. The duration of the contract is 1020 calendar days after site delivery. For electronic access to information http://www.ibb.gov.tr/tr-TR/kurumsal/Birimler/AnadoluYakasiRayliSistemlerMD/Pages/Anasayfa.aspx#.V3TsLPmLSUk. Documents are available by logging in at https://ekap.kik.gov.tr/EKAP/ and upon payment of 1 000 TRY (Turkish Lira) for the pre-qualification document and 1 500 TRY (Turkish Lira) for the tender document. Contact Seyrantepe Metro Tesisleri, Seyrantepe SARIYER/Istanbul, att.n Feriha Mert, Director of Asian Side Rail Systems, Istanbul, tel +90 2123126515, fax +90 2124554373, e-mail feriha.mert@ibb.gov.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=213054-2016. Ref.n. 2016/252607. 28/16.



Permalink


The open invitation to tender, deadline 20.07.2016, for the Umraniye-Atasehir-Goztepe subway line construction and E&M systems procurement including installation and commissioning works has been cancelled. The total length is a 13 km section with 11 stations and is on Istanbul's Asian side. Contact Seyrantepe Metro Tesisleri, Seyrantepe SARIYER/Istanbul, tel/fax 0212 312 65 15 - 0212 455 43 73, e-mail abdullah.ozovali@ibb.gov.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234324-2016. Ref.n. 2016/154433. 28/16.




Permalink


Open invitation to tender, deadline 20.08.2016, for the Umraniye-Atasehir-Goztepe subway line construction and E&M systems procurement including installation and commissioning works. The total length is a 13 km section with 11 stations and is on the Istanbul Asian side. Value of the contract is EUR1-1000 million, excluding VAT. The duration of the contract is 1020 calendar days after site delivery. For electronic access to information please visit http://www.ibb.gov.tr/tr-TR/kurumsal/Birimler/AnadoluYakasiRayliSistemlerMD/Pages/Anasayfa.aspx#.V3TsLPmLSUk. Documents are available by logging in at https://ekap.kik.gov.tr/EKAP/ and upon payment of 1 000 TRY (Turkish Lira) for the pre-qualification document and 1 500 TRY (Turkish Lira) for the tender document. Contact Seyrantepe Metro Tesisleri, Seyrantepe SARIYER/Istanbul, att.n Feriha Mert, Director of Asian Side Rail Systems, Istanbul, tel +90 2123126515, fax +90 2124554373, e-mail feriha.mert@ibb.gov.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231054-2016. Ref.n. 2016/252607. 28/16.




Permalink

Turkey, Istanbul - tr/44

Kaynarca-Pendik-Tuzla Metro

Closing Date: 15.07.2016 (Tender Closed)

Open invitation to tender, deadline 15.07.2016, for the Kaynarca-Pendik-Tuzla Subway Line construction and E&M systems procurement including installation and commissioning. The total length is 12 km with 8 stations and is on Istanbuls Asian side. The duration of contract 1080 calendar days after site delivery. Contact Seyrantepe Metro Tesisleri, Seyrantepe SARIYER/Istanbul, tel/fax 0212 312 65 15 - 0212 455 43 73, e-mail abdullah.ozovali@ibb.gov.tr. The tender documents are available by logging in at https://ekap.kik.gov.tr/EKAP/ and upon payment of 2,500 TRY (Turkish lira). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=165653-2016. Ref.n. 2016/135639. 20/16.



Permalink


Open invitation to tender, deadline 08.08.2016, for the Kaynarca-Pendik-Tuzla Subway Line construction and E&M systems procurement including installation and commissioning. The total length is 12 km with 8 stations and is on Istanbuls Asian side. Value of the contract is EUR1-1000 million, excluding VAT. The duration of the contract is 1020 calendar days after site delivery. For electronic access to information  http://www.ibb.gov.tr/tr-TR/kurumsal/Birimler/AnadoluYakasiRayliSistemlerMD/Pages/Anasayfa.aspx. Documents are available by logging in at https://ekap.kik.gov.tr/EKAP/  and upon payment of 750 TRY (Turkish Lira) for the pre-qualification document and 1 250 TRY (Turkish Lira) for the tender document. Contact Seyrantepe Metro Tesisleri, Seyrantepe SARIYER/Istanbul, att.n Feriha Mert, Director of Asian Side Rail Systems, Istanbul, tel +90 2123126515, fax +90 2124554373, e-mail feriha.mert@ibb.gov.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231053-2016. Ref.n. 2016/252589. 28/16.




Permalink


The open invitation to tender, deadline 15.07.2016, for the Kaynarca-Pendik-Tuzla Subway Line construction and E&M systems procurement including installation and commissioning has been cancelled. The total length is 12 km with 8 stations and is on Istanbuls Asian side. Contact Seyrantepe Metro Tesisleri, Seyrantepe SARIYER/Istanbul, tel/fax 0212 312 65 15 - 0212 455 43 73, e-mail abdullah.ozovali@ibb.gov.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234325-2016. Ref.n. 2016/135639. 28/16. 




Permalink


The awarding procedure, deadline 08.08.2016, for the Kaynarca-Pendik-Tuzla Subway Line construction and E&M systems procurement including installation and commissioning, has been discontinued. The total length is 12 km with 8 stations and is on Istanbuls Asian side. Contact Seyrantepe Metro Tesisleri, Seyrantepe SARIYER/Istanbul, att.n Feriha Mert, Director of Asian Side Rail Systems, Istanbul, tel +90 2123126515, fax +90 2124554373, e-mail feriha.mert@ibb.gov.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=278237-2016. Ref.n. 2016/252589. 32/16.




Permalink

Turkey, Istanbul - tr/43

Metro

Closing Date: 14.07.2016 (Tender Closed)

Open invitation to tender, deadline 14.07.2016, for the Cekmekoy-Sancaktepe-Sultanbeyli and Sarıgazi (Hospital)-Tasdelen-Yenidogan Subway Lines for construction and E&M systems procurement also includes installation and commissioning works. The total length of the tunnel will be 17.8 km with 14 Stations and is on Istanbuls Asian side. The duration of the contract is 1080 calendar days after site delivery. Please contact Seyrantepe Metro Tesisleri, Seyrantepe SARIYER/Istanbul, tel/fax 0212 312 65 15 - 0212 455 43 73, e-mail abdullah.ozovali@ibb.gov.tr. The tender documents are available by logging in at https://ekap.kik.gov.tr/EKAP/ and upon payment of 3,000 TRY (Turkish lira). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=165654-2016. Ref.n. 2016/123038. 20/16.



Permalink


Open invitation to tender, deadline 05.08.2016, for the Cekmekoy-Sancaktepe-Sultanbeyli and Sarıgazi (Hospital)-Tasdelen-Yenidogan Subway Lines for construction and E&M systems procurement also includes installation and commissioning works. The total length of the tunnel will be 17.8 km with 14 Stations and is on Istanbul’s Asian side. Value of the contract is EUR1-1000 million, excluding VAT. The duration of the contract is 1020 calendar days after site delivery. Electronic access to information http://www.ibb.gov.tr/tr-TR/kurumsal/Birimler/AnadoluYakasiRayliSistemlerMD/Pages/Anasayfa.aspx#.V3TFF_mLSUk. Documents are available by logging in at https://ekap.kik.gov.tr/EKAP/ and upon payment of 2 000 TRY (Turkish Lira) for the pre-qualification document and 1 000 TRY (Turkish Lira) for the tender document. Contact Seyrantepe Metro Tesisleri, Seyrantepe SARIYER/Istanbul, att.n Feriha Mert, Director of Asian Side Rail Systems, Istanbul, tel +90 2123126515, fax +90 2124554373, e-mail feriha.mert@ibb.gov.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231055-2016. Ref.n. 2016/252601. 28/16.




Permalink


The open invitation to tender, deadline 14.07.2016, for the Cekmekoy-Sancaktepe-Sultanbeyli and Sarıgazi (Hospital)-Tasdelen-Yenidogan Subway Lines for construction and E&M systems procurement also includes installation and commissioning works has been cancelled. Contact Seyrantepe Metro Tesisleri, Seyrantepe SARIYER/Istanbul, tel/fax 0212 312 65 15 - 0212 455 43 73, e-mail abdullah.ozovali@ibb.gov.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234323-2016. Ref.n. 2016/123038. 28/16.




Permalink


The awarding procedure, deadline 05.08.2016, for the Cekmekoy-Sancaktepe-Sultanbeyli and Sarıgazi (Hospital)-Tasdelen-Yenidogan Subway Lines for construction and E&M systems procurement also includes installation and commissioning works, has been discontinued. The total length of the tunnel will be 17.8 km with 14 Stations and is on Istanbul’s Asian side. Contact Seyrantepe Metro Tesisleri, Seyrantepe SARIYER/Istanbul, att.n Feriha Mert, Director of Asian Side Rail Systems, Istanbul, tel +90 2123126515, fax +90 2124554373, e-mail feriha.mert@ibb.gov.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=278235-2016. Ref.n. 2016/252601. 32/16.




Permalink

Turkey, Istanbul - tr/42

Basaksehir-Kayasehir Metro

Closing Date: 12.07.2016 (Tender Closed)

Open invitation to tender, deadline 12.07.2016, for Basaksehir-Kayasehir Metro Line Construction and E&M works. The underground 6km section on Istanbuls European side includes 4 stations. The duration of the contract is 900 calendar days after site delivery. Please Contact Istanbul Metropolitan Municipality Additional Service Building, Gungoren-Istanbul, tel 0 212 4494 175, -184, -180, e-mail hasan.pezuk@ibb.gov.tr. The tender documents are available by logging in at https://ekap.kik.gov.tr/EKAP/ and upon payment of 2,500 TRY (Turkish lira). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=159484-2016. Ref.n. 2016/141784. 20/16.



Permalink


Open invitation to tender, deadline 04.08.2016, for Basaksehir-Kayasehir Metro Line Construction and E&M works. The underground 6km section on Istanbuls European side includes 4 stations. Value of the contract is EUR1-1000 million, excluding VAT. The duration of the contract is 900 calendar days after site delivery. Electronic access to information: http://www.ibb.gov.tr/tr-TR/kurumsal/Birimler/AvrupaYakasiRayliSistemlerMD/Pages/Anasayfa.aspx#.V0bYUfmLQdU. Documents are available by logging in at https://ekap.kik.gov.tr/EKAP/ and upon payment of 1 500 TRY (Turkish Lira) for the pre-qualification document and 1 000 TRY (Turkish Lira) for the tender document. Contact Istanbul Metropolitan Municipality, attn Hasan Pezuk, Director of European Side Rail Systems, Gungoren-Istanbul, tel +90 212 4494175, fax +90 212 4494180, e-mail hasan.pezuk@ibb.gov.tr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231057-2016. Ref.n. 2016/252306. 28/16.




Permalink


The open invitation to tender, deadline 12.07.2016, for Basaksehir-Kayasehir Metro Line Construction and E&M works has been CANCELLED. The underground 6km section on Istanbuls European side includes 4 stations. The duration of the contract is 900 calendar days after site delivery. Contact Istanbul Metropolitan Municipality Additional Service Building, Gungoren-Istanbul, tel 0 212 4494 175, -184, -180, e-mail hasan.pezuk@ibb.gov.tr. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=234327-2016. Ref.n. 2016/141784. 28/16.




Permalink


Open invitation to tender, deadline 09.09.2016, for Basaksehir-Kayasehir Metro Line Construction and E&M works. The underground 6km section on Istanbuls European side includes 4 stations. Value of the contract is EUR1-1000 million, excluding VAT. Duration of the contract is 900 calendar days from the award. Electronic access to information can be found at http://www.ibb.gov.tr/tr-TR/kurumsal/Birimler/AvrupaYakasiRayliSistemlerMD/Pages/Anasayfa.aspx#.V0bYUfmLQdU. Documents are available by logging in at https://ekap.kik.gov.tr/EKAP/ and upon payment of 1 500 TRY (Turkish Lira) for the pre-qualification document and 1 000 TRY (Turkish Lira) for the tender document. Contact Istanbul Metropolitan Municipality, attn Hasan Pezuk, Director of European Side Rail Systems, Gungoren-Istanbul, tel +90 212 4494175, fax +90 212 4494180, e-mail hasan.pezuk@ibb.gov.tr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231057-2016. Ref.n. 2016/303118. 32/16.




Permalink


DISCONTINUED - The awarding procedure, deadline 04.08.2016, for Basaksehir-Kayasehir Metro Line Construction and E&M works, has been discontinued. The underground 6km section on Istanbuls European side includes 4 stations. Contact Istanbul Metropolitan Municipality, attn Hasan Pezuk, Director of European Side Rail Systems, Gungoren-Istanbul, tel +90 212 4494175, fax +90 212 4494180, e-mail hasan.pezuk@ibb.gov.tr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=278236-2016. Ref.n. 2016/252306. 32/16.




Permalink


Open invitation to tender, deadline 09.09.2016, for Basaksehir-Kayasehir Metro Line Construction and E&M works. The underground 6km section on Istanbuls European side includes 4 stations. Value of the contract is EUR1-1000 million, excluding VAT. Duration contract 900 calendar days from award. Electronic access to information: http://www.ibb.gov.tr/tr-TR/kurumsal/Birimler/AvrupaYakasiRayliSistemlerMD/Pages/Anasayfa.aspx#.V0bYUfmLQdU. Documents are available by logging in at https://ekap.kik.gov.tr/EKAP/ and upon payment of 1 500 TRY (Turkish Lira) for the pre-qualification document and 1 000 TRY (Turkish Lira) for the tender document. Contact Istanbul Metropolitan Municipality, attn Hasan Pezuk, Director of European Side Rail Systems, Gungoren-Istanbul, tel +90 212 4494175, fax +90 212 4494180, e-mail hasan.pezuk@ibb.gov.tr.  Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=276477-2016. Ref.n. 2016/303118. 32/16.




Permalink

Turkey, Istanbul - tr/41

Ikitelli-Atakoy Metro

Closing Date: 14.09.2015 (Tender Closed)


Open invitation to tender, deadline 14.09.2015, for the construction of the Ikitelli-Atakoy Metro Line and E & M works. The 13.39 km long line on the European side of Istanbul, will be mainly underground in natural tunnels. This line is a public railway transportation system. In total there will be 12 new stations which will be cut and cover. Contact Istanbul Metropolitan Municipality Additional Service Building, Railway Systems Directorate of the European side, Istanbul, Tel 0 212 4494 175, -184, -180, e-mailhasan.pezuk@ibb.gov.tr. The tender documents are available by logging in on https: //ekap.kik.gov.tr/EKAP/ and upon payment of 2,500 TRY (Turkish lira). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=it&docid=258959-2015, OJ S 141. Rif.n. 2015/74736.  37/15.




Permalink

Postponed from 14.09.2015 to 29.09.2015 for the open invitation to tender for the construction of the Ikitelli-Atakoy Metro Line and E & M works. The 13.39 km long line on the European side of Istanbul, will be mainly underground in natural tunnels. This line is a public railway transportation system. In total there will be 12 new stations which will be cut and cover. Contact Istanbul Metropolitan Municipality Additional Service Building, Railway Systems Directorate of the European side, Istanbul, Tel 0 212 4494 175, -184, -180, e-mail hasan.pezuk@ibb.gov.tr. The tender documents are available by logging in at https: //ekap.kik.gov.tr/EKAP/  and upon payment of 2,500 TRY (Turkish lira). Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=337657-2015. Ref.n. 2015/74736.  40/15.



Permalink

Turkey, Istanbul - tr/40

Dudullu-Bostancı Metro

Closing Date: 29.09.2015 (Tender Closed)


Open invitation to tender , deadline 29/09/2015, for the construction of the Dudullu-Bostancı metro  line and E & M works, also includes the construction of underground parking, storage, administrative buildings and the control center. The line is 14.2 km long and will go from south to north on the Eastern side of Istanbul, which is densely populated.  The tender includes the building of 13 new underground stations Contact Istanbul Metropolitan Municipality Department of Rail Systems, Directorate of Anatolian Side Rail Systems, Huzur Mahallesi Ä°stasyon Yolu Seyrantepe Metro Tesisleri Sarıyer/Ä°STANBUL, Istanbul, tel 2123126515,2124554373, e-mailabdullah.ozovali@ibb.gov.tr. The tender documents are available by logging on to https://ekap.kik.gov.tr/EKAP/ and upon payment of 2,500 TRY (Turkish lira). Visithttp://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=258960-2015 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=314103-2015. Ref.n. 2015/85128. 37/15.




Permalink

Turkey, Siirt - tr/39

Hydropower

Closing Date: 30.10.2013 (Tender Closed)

Invitation to tender by negotiated procedure, deadline 01.07.2013, for civil and hydromechanical works of Pervari Dam and HEPP project on Botan river in Pervari district of Siirt province, including 970 m-long, 9.5 m-ID diversion tunnel, three cofferdams, 154 m-high concrete face rockfill dam with water intake, 1,335 m-long low pressure energy tunnel with 10.3 m-ID, 96 m-long high pressure energy tunnel with 8 m-ID, and associated shafts and other works including powerhouse with 2 off 195.5 MW Francis vertical turbines and 2 off 9.15 MW Francis horizontal turbines. Contract duration 46 months. Time limit for accessing documents 05.10.2013. Further information, specs and docs from Esra Songur at Enerjisa in Ankara, tel +90 312 58340-59, fax +90 312 4738546, e-mail esra.songur@enerjisa.com to whom tenders or requests to participate must be sent. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=307957-2013. 37/13.



Permalink

Turkey, Siirt - tr/38

Hydropower

Closing Date: 01.07.2013 (Tender Closed)

Invitation to tender by negotiated procedure, deadline 01.07.2013, for construction works of Incir Dam and HEPP project on Buyuk Cay in Siirt province, including 455 m-long, 8.1 m-ID diversion tunnel, three cofferdams, 150 m-high RCC dam with water intake, bottom outlet and two 195 m-long penstocks of diameters 4.2 m and 4.0 m, spillway, 168.4 Mwe powerhouse and associated works. Contract duration 40 months. Time limit for accessing documents 01.06.2013. Further information, specs and docs from Yasemin Eken/Murat Ersungur at Enerjisa in Ankara, tel +90 312 58340-14 or -47, fax +90 312 4738546, e-mail yasemin.eken@enerjisa.com to whom tenders or requests to participate must be sent. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=124259-2013. 16/13.



Permalink

Turkey, Eastern Anatolia - tr/37

Hydropower

Kalehan Enerji Uretim AS has awarded Poyry's Energy business group a EUR 2.9 million contract for detailed design services on the Beyhan 1 hydroelectric project in Turkey. The work will be executed jointly with consortium partner Temelsu. The contract includes execution of the detailed design for civil works of the powerhouse and review of the project's structures, such as the RCC (roller compacted concrete) dam with power intake and penstocks, spillway, diversion structures with three 9.5 m-diameter tunnels with 65 cm-thick lining, lengths 535 m, 572 m, and 608 m, bottom outlet and switchyard. The contract runs to the end of 2013. The installed capacity of Beyhan 1 is 550 MW with an annual generation of 1,245 GWh. The projects of Beyhan and Kalekoy cascade are part of the first hydropower plant projects developed by private investors in Turkey.Visit www.poyry.com and www.temelsu.com.tr. 29/11.