Israel

Israel, Jerusalem - il/12

Light Rail

First stage involves 14 km line with four tunnels connecting Pisgat Zeev in the north to the old city, the city centre and up to Mount Herzl in the southwest. Two underground sections. City Entrance tunnel in hard dolomite with only 2 m rock cover; Paratroopers tunnel in limestone with low vibration limitation; Hashalom Road tunnel in chalk and marly chalk; Depot's Entrance tunnel in chalk and limestone. $351 million total, of which $47 million for underground works. Design subject to re-evaluation by Semaly, France. Final plan calls for 8 lines with double tracks comprising 50 km with 75 stations. February 1999.   Tenders are likely to be called before the end of 1999 for construction of the first line from French Hill via Yaffo Street to Herzl Boulevard, estimated cost US$250 million. The entire five-line project now comprises 47 km of track, including 6.5 km in tunnel, and 72 stations. Total cost is estimated at US$1.3 billion and completion is expected in 2002. November 1999.   Tenders are likely to be called before the end of this year for construction of a light rail network in Jerusalem. The entire five-line project comprises 47 km of track, including 6.5 km in tunnel, and 72 stations. Total cost is estimated at US$1.3 billion and completion is slated for 2002. The first line will run from French Hill via Yaffo Street to Herzl Boulevard, and will cost about US$250 million. December 1999.   Prequalification bids for the 30-year build-operate-maintain concession for the first 14-km phase of the planned light rail network received from Baran Group in partnership with SNC-Lavalin, Canada as well as from domestic companies Africa Israel Investments and Housing & Construction Holding Co. March 2000.  The City Pass consortium, made up of Alstom, CGEA, and local companies Polar Investments and Ashtrom, was chosen as preferred candidate to build the first line, estimated to cost NIS1.7 billion.Trains are scheduled to start passenger services in mid-2006 between Mount Herzl and Pisgat Ze'ev via Rehov Jaffa on a 13.8 kilometre route serving 23 stations. The project is a BOT concession for 30 years. 45/02.



Permalink

Israel, Jerusalem - il/11

Mount Scopus Highway

Two parallel two-lane vehicle tunnels about 500 m long to be driven linking to eastern ring road. First phase north tube under way by Moriah Ltd in jointed chalk with chalky limestone and solution cavities. February 1999.   $12 million Scopus twin tubes under construction by Solel Boneh. 600 m-long, 10 m-wide and 8.5 m-high in chalk and marl using roadheaders in top heading and D229 hammer in bench. Initial support by steel arch, mesh and shotcrete. Secondary support by two layers of steel mesh and 25 cm of shotcrete. Contact shetz@infomall.co.il 16/01.



Permalink

Italy

Italy, Campania - it/279

Hydro

Closing Date: 15.05.2023 (Tender Closed)


Competitive procedure with negotiation, deadline 15/05/2023,  for theworjs and engineering services  for the drinking use of the water of Campolattarodam. The contract is composed by 3 lots. For bid documents click here, where tenders must be sent. Value of contract EUR529.27 million, excluding VAT. Duration of contract 96 months. Contact Giunta Regionale della Campania - Ufficio Speciale Grandi Opere , attn Salvatore Aversano, Naples, tel 39 0817964450, email salvatore.aversano@regione.campania.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=265089-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=202649-2023. Ref.n. 3593/RI/2023. 18/23. 




Permalink


The Joint Venture composed of Ghella (leader), TunnelPro, Itinera, within the ASTM Group, RDR and  IdroAmbiente has been awarded two of the three lots put out to tender for the design and execution of the works for the Campolattaro Dam, located in Campania, Italy. Value of contract is 410 million euros. Completion of the work will enable the enhancement of drinking water supply for more than 2.5 million people, as well as the irrigation of about 15,000 hectares for agricultural production. 

The first lot, whose value is approximately 277 million euros, will foresees the realization of a 7.5km diversion tunnel with a TBM, the construction of a drinking water treatment plant and a 30,000 cubic meters depositary reservoir. With the second lot, which is worth approximately 133 million euros, a potable adductor line will be built and the aqueducts in the area will be strengthened and integrated. 

Visit https://www.ghella.com. 41/23. 



Permalink

Italy, Campania - it/278

Railway

Closing Date: 15.09.2023 (Tender Closed)


Restricted invitation to tender, deadline 15/09/2023,  for the design, construction and equipment of the new  Afragola Napoli (LAN) line, from Afragola Centro to Piazza Carlo III at Naples. The contract includes design, supply and maintenance (full service).  

The construction works are composed of three parts: 

  1. The 9.5km main line with 10 stations and 2 interchanges with the existent railway at Vittorio and Casoria/Afragola. The single tube bi-track will be mainly driven by TBM EPB-S.  
  2. Optional 1.90 km extension to  Afragola High Speed station-Deposit with 1 Stations, a pedestrian interchange with RFI High Speed network, manufacts (ventilation chambers and safety exits), a depot, a interchange parking near Afragola High Speed station.  
  3. Optional 1.20 km extension to the center of Naples with 1 stations and manufacts (ventlation chambers and safety exits).  

For tender documents, click here. Value of the contract is  EUR1.61 bn, excluding VAT, with EUR 592.40 million belonging to  OG4 category. Duration of contract 2787 days. Contact Ente Autonomo Volturno Srl, attn Filippo Porzio, Naples, tel +39 0817722006, fax +39 0817722522, email f.porzio@eavsrl.it. Visit  http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=438598-2023, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=347100-2023http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=263605-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=198708-2023. 29/23. 




Permalink

Italy, Trentino-South Tyrol - it/277

Railway

Closing Date: 29.08.2023 (Tender Closed)


Open invitation to tender, deadline 29/08/2023, for the executive design and the construction of the new Virgolo railway tunnel - three tracks from km149+100 to km149+635 on the Verona-Brennero line, of the new sections(BD) of the Verona - Brennero line (km148+735 - km149+771), of the extension of the Meranese track (km 0+651 – km 1+763). Click here for tender documents, where tenders must be sent. Value of contract will be EUR78.55 million, excluding VAT, with EUR22.36 million belonging to OG4 category. Duration of the contract is 1655 days. Contact RFI SpA, attn Luca Lancieri, Rome, email l.lancieri@rfi.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=388028-2023 . Ref. n. DAC.0134.2023. 27/23.  

 




Permalink


Notice of the existence of a qualification system for the awarding of the services of Technical Administrative Tests Commission and Static Tests for the construction of the new three-track Virgolo tunnel and relocation of the Merano line junction. The contract consists of Lot N. 1 (Technical Administrative Testing) and Lot N. 2 (Static Testing). Click here for bid documents and here where tenders must be sent.  Contact RFI SpA, attn Sergio Meloni, Rome, fax +39 06 47308901, email rfi-ad-dac.sns@pec.rfi.it. Visit https://ted.europa.eu/en/notice/-/detail/699668-2023. Ref. n. DAC.0005.2024. 47/23. 

 




Permalink


The Joint Venture D'Agostino Angelo Antonio Costruzioni Generali Spa (Leader)  and E.L.U.S. Srl secured the EUR 70.71 million contract, excluding VAT, for the executive design and the construction of the new Virgolo railway tunnel - three tracks from km149+100 to km149+635 on the Verona-Brennero line, of the new sections(BD) of the Verona - Brennero line (km148+735 - km149+771), of the extension of the Meranese track (km 0+651 – km 1+763). Contact RFI SpA, attn Luca Lancieri, Rome, tel +39 06 47308846, email l.lancieri@rfi.it. Visit https://ted.europa.eu/en/notice/-/detail/293389-2024. Ref. n. DAC.0134.2023. 21/24. 



Permalink


No winner was selected for the awarding of the services of the Technical Administrative and Static Testing Commission for the construction of the new three-track Virgolo Tunnel and relocation of the Merano line junction. The tender is closed. Contact RFI SpA, attn Maria Rosaria Maggio, Rome, tel +39 011 6652247, email rfi-ad-dac.to@pec.it. Visit https://ted.europa.eu/en/notice/-/detail/356306-2024. Ref. n. DAC.0005.2024. 25/24. 



Permalink

Italy, Liguria - it/276

Metro

Closing Date: 20.02.2023 (Tender Closed)

Open invitation to tender, deadline 20/02/2023, for the executive design and completion works of the Corvetto station, part of the Genoa subway. For tender documents please click here, where tenders must be sent. Value of the contract will be EUR38.39 million. Duration of the contract is 1181 days. Contact Comune di Genova, attn Eng. Manuela Sciutto, Genoa, tel +039 0105573325, fax +039 3346589853, email direzionemobilita@comune.genova.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=053864-2023 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=726003-2022. Rif.n. 01-21-5039.  05/23. 

 



Permalink

Italy, South Tyrol - it/275

Road

Closing Date: 28.04.2022 (Tender Closed)


Open invitation to tender, deadline 28/04/2022, for the general management and safety coordination during construction of the Perca bypass on SS 49 Val Pusteria. For tender documents, please click here. Value of contract is EUR3.50 million, excluding VAT. Duration of contract will be 1700 days. Contact Provincia Autonoma di Bolzano, attn Umberto Simone, email umberto.simone@provinz.bz.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=204436-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=192606-2022. Ref.n. TB/IS 3/2022. 16/22. 

 




Permalink


Open invitation to tender, deadline 09/03/2022, for the construction of the Perca bypass on SS49 Val Pusteria, including a 2317 tunnel, 632 m of which in cut&cover. For tender documents, please click here. Value of the contract is EUR 79.99 million contract,  excluding VAT. Duration of the contract will be 1470 days. Contact Provincia Autonoma di Bolzano, email generaldirektion@provinz.bz.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=073133-2022.  Ref.n. TB IS-01 2022. 07/22. 

 




Permalink


Open invitation to tender, deadline 17/11/2022, for technical-administrative, static and plant testing (including fire testing) during and at the end of construction for the Perca bypass on SS49 Val Pusteria, including a 2317 tunnel. For tender documents, please click here. Value of the contract is EUR1.23 million contract,  excluding VAT. Duration of the contract will be 1700 days. Contact Provincia Autonoma di Bolzano, attn Arno Brancalion, email arno.brancalion@provincia.bz.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=612262-2022, http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=598502-2022 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=575651-2022.  Ref.n. TB IS-10 2022. 45/22. 

 




Permalink


The Joint Venture Valdemarin Srl from Bressanone (BZ),  EUT Engineering GmbH from Bressanone (BZ), Bergmeister GmbH from Varna (BZ),  PLAN TEAM GmbH  from Bolzano and Pfeifer Partners GmbH from Appiano (BZ) have secured the EUR 1.69 million contract,  excluding VAT, for the general management and safety coordination during construction of the Perca bypass on SS 49 Val Pusteria. Contact Provincia Autonoma di Bolzano, attn Umberto Simone, email umberto.simone@provinz.bz.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=648791-2022.  47/22.



Permalink


The Joint Venture Strabag AG, Alpenbau GmbH, Unionbau AG and Moser & Co have secured the EUR 73.51 million contract for the construction of the Perca bypass on the SS49 Val Pusteria, including a 2317 tunnel, 632 m of which is cut & cover. Contact Provincia Autonoma di Bolzano, email generaldirektion@provinz.bz.it. Visit https://news.provincia.bz.it. Ref.n. TB IS-01 2022. 47/22. 

 




Permalink

Italy, Basilicata - it/274

Railway

Closing Date: 02.11.2022 (Tender Closed)


Open invitation to tender, deadline 02/11/2022, for the executive design and completion, extraordinary maintenance, integration and adaptation of the existing works of the new Ferrandina - Matera La Martella line. The contract includes the construction of the following new infrastructures: Basento 1 viaduct, rock tunnel for the emergency exit from the 6.5km Miglionico tunnel, extension of the cut&cover sections at the Miglionico tunnel entrances, new technological buildings, railway equipment with armament, signaling and telecommunication systems, light and driving power, contact line, mechanical systems and electrical substations. For tender documents please click here, where tenders must be sent. Value of the contract is EUR311.71 million, excluding VAT, with EUR 79.87 million belonging to OG4. The duration of the contract will be 1170 days. Contact Rete Ferroviaria Italiana, attn Alessio Sammartino, Rome, email rfi-ad-dac.ba@pec.rfi.it.Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=433258-2022. Ref.n. DAC.0128.2022_GPA_Ferrandina-Matera. 32/22

 

Italy-Rome: Railway construction works


2022/S 151-433258

Contract notice – utilities

Works

Legal Basis:
Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses
Official name: Rete Ferroviaria Italiana – Società con socio unico soggetta alla direzione e coordinamento di Ferrovie dello Stato Italiane S.p.A. a norma dell’art. 2497 sexies Codice Civile e del D.Lgs. 112/2015. Direzione Acquisti – Sede di Roma
Postal address: Via dello Scalo Prenestino, 25
Town: Roma
NUTS code: ITI43 Roma
Postal code: 00159
Country: Italy
Contact person: Responsabile del Procedimento per la fase di affidamento: Alessio Sammartino
E-mail: rfi-ad-dac.ba@pec.rfi.it
Internet address(es):
Main address: www.gare.rfi.it
I.6)Main activity
Railway services

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:


Progettazione esecutiva ed esecuzione dei lavori per completamento, manutenzione straordinaria, integrazione e adeguamento delle opere esistenti della nuova linea Ferrandina–Matera La Martella


Reference number: DAC.0128.2022 - CUP J81H92000020001 - CIG 93350062A6
II.1.2)Main CPV code
45234100 Railway construction works
II.1.3)Type of contract
Works
II.1.5)Estimated total value
Value excluding VAT: 311 708 426.85 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ITF52 Matera
II.2.6)Estimated value
Value excluding VAT: 311 708 426.85 EUR
II.2.7)Duration of the contract, framework agreement or dynamic purchasing system
Duration in days: 1170
This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information
IV.2.2)Time limit for receipt of tenders or requests to participate
Date: 02/11/2022
Local time: 12:00
IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates
IV.2.4)Languages in which tenders or requests to participate may be submitted:
Italian

Section VI: Complementary information

VI.5)Date of dispatch of this notice:
03/08/2022




Permalink


Postponed from 02/11/2022 to 21/11/2022 the deadline of the open invitation to tender for the executive design and completion, extraordinary maintenance, integration and adaptation of the existing works of the new Ferrandina - Matera La Martella line. The contract includes the construction of the following new infrastructures: Basento 1 viaduct, rock tunnel for the emergency exit from the 6.5km Miglionico tunnel, extension of the cut & cover sections at the Miglionico tunnel entrances, new technological buildings, railway equipment, signaling and telecommunication systems, light and driving power, contact line, mechanical systems and electrical substations. For tender documents please click here, where tenders must be sent. Value of the contract is EUR 311.71 million, excluding VAT, with EUR 79.87 million belonging to OG4. The duration of the contract will be 1170 days. Contact Rete Ferroviaria Italiana, attn Alessio Sammartino, Rome, email rfi-ad-dac.ba@pec.rfi.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=605004-2022 . Ref.n. DAC.0128.2022_GPA_Ferrandina-Matera. 44/22 

 




Permalink

Italy, Abruzzo and Lazio - it/273

Motorway


Prior information notice for the design, implementation and construction of a dynamic monitoring system for the remote control of bridges, viaducts, tunnels and geotechnical support works, of Smart Road Technological Systems and of a Processing Control Center Station, data management and monitoring for the A24 and A25 motorways. Value of the contract is EUR200 million, excluding VAT. Estimated date of publication of the contract notice: 31/12/2021. Contact Italferr SpA, attn Massimo Scalzi, Rome, tel +39 0649752087, email  gareappalti.italferr.it@legalmail.it

Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=493227-2021. 41/21.  

Italy-Rome: Road-maintenance works

2021/S 191-493227

Prior information notice

This notice is for prior information only

Works

Legal Basis:
Directive 2014/24/EU

Section I: Contracting authority

I.1)Name and addresses
Official name: Italferr S.p.A., Società con socio unico, soggetta all'attività di direzione e coordinamento di Ferrovie dello Stato Italiane S.p.A. in nome e per conto del Commissario Straordinario Autostrade A24-A25 nominato ai sensi dell’art.206, c.1 D.L. 19/05/2020, n.34, convertito in L. 17/07/2020 n.77
Postal address: Via Vito Giuseppe Galati, 71
Town: Roma
NUTS code: IT Italia
Postal code: 00155
Country: Italy
Contact person: Massimo Scalzi
E-mail: gareappalti.italferr.it@legalmail.it
Telephone: +39 0649752087
Internet address(es):
Main address: www.acquistionline.italferr.it
Address of the buyer profile: http://www.italferr.it
I.3)Communication
Additional information can be obtained from the abovementioned address
I.4)Type of the contracting authority
Body governed by public law
I.5)Main activity
Other activity: Servizi

Section II: Object

II.1)Scope of the procurement
II.1.1)Title:

Autostrade A24-A25

II.1.2)Main CPV code
45233141 Road-maintenance works
II.1.3)Type of contract
Works
II.1.4)Short description:

Progettazione, implementazione e realizzazione di un Sistema di “MONITORAGGIO DINAMICO” per il controllo da remoto di ponti, viadotti, tunnel ed opere geotecniche di sostegno, di Sistemi Tecnologici “SMART ROAD” e di una “STAZIONE CENTRO DI CONTROLLO” di elaborazione, gestione e monitoraggio dei dati per le AUTOSTRADE A24 e A25.

II.1.5)Estimated total value
Value excluding VAT: 200 000 000.00 EUR
II.1.6)Information about lots
This contract is divided into lots: no
II.2)Description
II.2.3)Place of performance
NUTS code: ITF1 Abruzzo
NUTS code: ITI4 Lazio
Main site or place of performance:

Autostrade A24-A25

II.2.4)Description of the procurement:

Progettazione, implementazione e realizzazione di un Sistema di “MONITORAGGIO DINAMICO” per il controllo da remoto di ponti, viadotti, tunnel ed opere geotecniche di sostegno, di Sistemi Tecnologici “SMART ROAD” e di una “STAZIONE CENTRO DI CONTROLLO” di elaborazione, gestione e monitoraggio dei dati per le AUTOSTRADE A24 e A25.

II.2.14)Additional information
II.3)Estimated date of publication of contract notice:
31/12/2021

Section IV: Procedure

IV.1)Description
IV.1.8)Information about the Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement: no

Section VI: Complementary information

VI.3)Additional information:

Criterio di aggiudicazione: Offerta Economicamente più Vantaggiosa.


Il Bando di gara potrà prevedere la suddivisione in lotti.


Categorie di lavori: prevalente OS19. Altre categorie saranno indicate nel Bando di gara.


Nell'appalto sono compresi, oltre ai lavori, i servizi e le forniture.

VI.5)Date of dispatch of this notice:
27/09/2021



Permalink


Open invitation, deadline 05/06/2023, for fire protection services on the A24-A25 motorway sections, in inadequate tunnels falling within the ANAS sphere. The contract is divided into 3 lots: 

Lot 1 - tunnels: Stonio, Ara Salere, Roviano, Pietrasecca, Colle Mulino 

Lot 2 - tunnels: Genzano, San Giacomo, Gran Sasso, Colledara, Collurania 

Lot 3 - tunnels: Monte Sant'Angelo, San Rocco, San Domenico, Colle Castiglione 

For tgender documents click here, where tenders must be sent. Value of the contract is EUR 17.27 million, excluding VAT. Contact ANAS Spa, Roma, email acquisti@postacert.stradeanas.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=230941-2023. Ref.n. DGACQ 23-23. 19/23.   




Permalink

Italy, National - it/272

Railway and Road

Closing Date: 06.10.2021 (Tender Closed)


Open invitation to tender, deadline 06/10/2021, for 5 framework agreements contracts on qualified support for the Technical and Economic Feasibility Design and the Final Design of railway and road infrastructures in Italy:  Lot 1 - RdA-45692 - Regions Valle d’Aosta, Piedmont, Liguria; Lot 2 - RdA-45693 - Regions Lombardy, Veneto, Emilia Romagna; Lot 3 - RdA-45695 - Regions Trentino Alto Adige, Friuli Venezia Giulia; Lot 4 - RdA-45696 - Regions Tuscany, Umbria, Marche, Lazio, Abruzzo, Molise, Campania; Lot 5 - RdA-45697 - Regions Puglia, Basilicata, Calabria, Sicily, Sardegna. Value of the contract is EUR 20 million, excluding VAT. Duration of the contract will be 24 months. For tender documents https://www.acquistionline.italferr.it/esop/toolkit/opportunity/current/3252/detail.si where tendes must be sent. Contact Italferr SpA, attn Angelo Putaturo, Rome, tel +39 0649752446/05, email gareappalti.italferr.it@legalmail.it. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=450309-2021. Ref.n. RdA45692 - RdA45693 - RdA45695 - RdA45696 - RdA45697. 36/21.

Italy-Rome: Railway engineering services

2021/S 172-450309

Contract notice – utilities

Services

Legal Basis:

Directive 2014/25/EU

Section I: Contracting entity

I.1)Name and addresses

Official name: Italferr S.p.A., Società con socio unico, soggetta all'attività di direzione e coordinamento di Ferrovie dello Stato Italiane S.p.A.
Postal address: Via Vito Giuseppe Galati, 71
Town: Roma
NUTS code: IT Italia
Postal code: 00155
Country: Italy
Contact person: Angelo Putaturo
E-mail: gareappalti.italferr.it@legalmail.it
Telephone: +39 0649752446/05
Internet address(es):
Main address: www.acquistionline.italferr.it
Address of the buyer profile: http://www.italferr.it

I.6)Main activity

Railway services

Section II: Object

II.1)Scope of the procurement

II.1.1)Title:

RdA-45692 - RdA-45693 - RdA-45695 - RdA-45696 - RdA-45697

II.1.2)Main CPV code

71311230 Railway engineering services

II.1.3)Type of contract

Services

II.1.5)Estimated total value

Value excluding VAT: 20 000 000.00 EUR

II.1.6)Information about lots

This contract is divided into lots: yes

II.2)Description

II.2.1)Title:

RdA-45692 - CIG: 88160556BB

Lot No: 1

II.2.2)Additional CPV code(s)

71311230 Railway engineering services

II.2.3)Place of performance

NUTS code: IT Italia

II.2.6)Estimated value

Value excluding VAT: 4 000 000.00 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 24

This contract is subject to renewal: no

II.2)Description

II.2.1)Title:

RdA-45693 - CIG: 88160724C3

Lot No: 2

II.2.2)Additional CPV code(s)

71311230 Railway engineering services

II.2.3)Place of performance

NUTS code: IT Italia

II.2.6)Estimated value

Value excluding VAT: 4 000 000.00 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 24

This contract is subject to renewal: no

II.2)Description

II.2.1)Title:

RdA-45695- CIG: 8816085F7A

Lot No: 3

II.2.2)Additional CPV code(s)

71311230 Railway engineering services

II.2.3)Place of performance

NUTS code: IT Italia

II.2.6)Estimated value

Value excluding VAT: 4 000 000.00 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 24

This contract is subject to renewal: no

II.2)Description

II.2.1)Title:

RdA-45696 - CIG: 8816097963

Lot No: 4

II.2.2)Additional CPV code(s)

71311230 Railway engineering services

II.2.3)Place of performance

NUTS code: IT Italia

II.2.6)Estimated value

Value excluding VAT: 4 000 000.00 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 24

This contract is subject to renewal: no

II.2)Description

II.2.1)Title:

RdA-45697 - CIG: 88161071A6

Lot No: 5

II.2.2)Additional CPV code(s)

71311230 Railway engineering services

II.2.3)Place of performance

NUTS code: IT Italia

II.2.6)Estimated value

Value excluding VAT: 4 000 000.00 EUR

II.2.7)Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 24

This contract is subject to renewal: no

Section IV: Procedure

IV.2)Administrative information

IV.2.2)Time limit for receipt of tenders or requests to participate

Date: 06/10/2021

Local time: 13:00

IV.2.3)Estimated date of dispatch of invitations to tender or to participate to selected candidates

IV.2.4)Languages in which tenders or requests to participate may be submitted:

Italian

Section VI: Complementary information

VI.5)Date of dispatch of this notice:

01/09/2021





Permalink