Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Norway

Norway, Hordaland - no/13

Highway

Folgefonn Drill/Blast 11 km twin tube being driven by Hordaland authority's tunnelling department reported having advanced 1.5 km by end-Sept 1998 with breakthrough planned for 2000. Nov 1998. Breakthrough beneath glacier reported between Veidekke driving 4 km from one end and Statens Vegvesen driving 7 km from other end, using Atlas Copco Rocket Boomer 353. Visit www.vegvesen.no/hordaland and www.atlascopco.com October 2000.  Open invitation to tender, deadline 28th May, 2001, for construction of Fusa road tunnel for Statens Vegvesen Hordaland, Bergen. Contact SV by fax +47 551 68715 or visit www.vegvesen.no/hordaland 18/01.Open call for bids, deadline 20th September, 2005 for construction of the E39 in Romarheimsdalen, consisting of 7 km road including a 1 km tunnel and four bridges. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=130028-2005, OJ S 131, or contact Statens vegvesen Region west, Leikanger, fax +47 57655986. E-mail firmapost-vest@vegvesen.no 29/05.



Permalink

Open invitation to tender, deadline 06.01.2010, for installation of water wells and monitoring regimes along the line of E39 Svegatjorn-Radal where several long tunnels are to be built. Water quality and fluctuations to be measured before and throughout the construction period from 2011-2014. Estimated contract value, excluding VAT, EUR416,000 - 594,000. Further information, specs and docs from Sara Skutlaberg at Statens vegvesen Region vest in Leikanger, tel +47 81544010, fax +47 57655986, e-mail Sara.Skutlaberg@vegvesen.no to whom tenders or requests to participate should be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=320699-2009. 47/09.



Permalink

The company Vestnorsk brunnboring AS, Eikangervag, secured the EUR484,662.86 contract for installation of water wells and monitoring regimes along the line of E39 Svegatjorn-Radal, where several long tunnels are to be built. Water quality and fluctuations are to be measured before and throughout the construction period from 2011-2014. Contact Sara Skutlaberg at Statens vegvesen Region vest in Leikanger, tel +47 81544010, e-mail Sara.Skutlaberg@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=143433-2010. 21/10.



Permalink

Prior information notice of invitation to tender for information meeting about the project E39 Svegatjorn-Radal, the new main road between Os and Bergen, including 28.2 km of tunnels. The project involves two major contracts: K10 for Svegatjorn-Fanavegen and K11 for Radal-Nordas-Fanavegen. Information meeting on 27.10.2014 at Clarion Hotel Bergen Airport. Visit http://www.vegvesen.no/_attachment/694614/binary/985703?fast_title=Information+meeting+27+october.pdfRegister attendance by 15.10.2014, e-mail tone.holmefjord@vegvesen.no. Contact Statens vegvesen Region west, attn Tone Holmefjord, Leikanger, tel +47 55111824, fax +47 57655986, e-mail tone.holmefjord@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=339882-2014 and http://www.vegvesen.no/Vegprosjekter/e39svegatjornradal/english. Ref. n. EEA 059-2014. 41/14.  



Permalink

Additional information about tender for the E39 Svegatjorn-Radal project, the new main road between Os and Bergen, including 28.2 km of tunnels. The scheduled date for start of award procedures is 15.10.2014.

Contact Statens vegvesen Region west, attn Tone Holmefjord, Leikanger, tel +47 55111824, fax +47 57655986, e-mail tone.holmefjord@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=347343-2014. Ref. n. EEA 059-2014. 42/14.  



Permalink

Open invitation to tender, deadline 21.04.2015, for contract K11 (Radal-Nordas-Flyplassvegen), part of E39 Svegatjorn-Radal project. The contract includes the construction of Ra and Soras tunnels (cross section from T9.5 to T27) and of one 1.5 km water tunnel (cross section T5). For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/125211. Registration for the tender conference (27.01.2015) is to be sent to tone.holmefjord@vegvesen.no by 22.01.2015 at the latest. Contact Knut Langeland, Statens Vegvesen Western Region, Leikanger, e-mail knut.langeland@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=440216-2014. Ref.n. 2014115867. 01/15.



Permalink

Open invitation to tender, deadline 05.05.2015, for contract K10 (Svegatjorn-Fanavege), part of E39 Svegatjorn-Radal project. The contract includes the construction of Skogafjells tunnel, 1.5 km T11.5 and Lyhorn tunnel, 9.2 km T9.5, as well as one water tunnel, 1.7 km T5. For electronic access to information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/125020. Registration for the tender conference (28.01.2015) is to be sent to tone.holmefjord@vegvesen.no by 22.01.2015 at the latest. Contact Kari Bremnes, Statens Vegvesen Western Region, Leikanger, e-mail kari.bremnes@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=440214-2014. Ref.n. 2014119316. 01/15.



Permalink

Open invitation to tender, deadline 16.06.2015, for engineering design services and preparation of the tender documentation for electro, control, regulation, monitoring (CRM), radio-rescue and communication (contract K3) including full area of E39 Svegatjorn-Radal project, with tunnels  Skogafjells (1,500 m), Lyshorn (9,300 m), Soras (1,800 m) and Ra (2,200 m)/(1,000 m). Duration of contract from 17.08.2015 to 07.10.2016. For electronic access to information visit https://kgv.doffin.no/ctm/Supplier/Documents/Folder/131145. Contact Markus Halland, Statens Vegvesen Western Region, Leikanger, e-mail markus.halland@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=157929-2015. Ref.n. 2015045059. 19/15.



Permalink

The following five companies: NCC (EUR204.39 million), Implenia (EUR174.73 million), Skanska (EUR187.74 million), Veidekke (EUR157.15 million) and Aldeso (EUR201.83 million) have been sent the offers for contract K11 (Radal-Nordas-Flyplassvegen), part of E39 Svegatjorn-Radal project, including the construction of Ra and Soras tunnels (cross section from T9.5 to T27) and of one 1.5 km-long water tunnel (cross section T5). Click no/13 for tunnelbuilder archive. Visit http://www.vegvesen.no/Vegprosjekter/e39svegatjornradal/Nyhetsarkiv/fem-tilbod-p%C3%A5-e39-svegatj%C3%B8rnr%C3%A5dal.19/15.



Permalink

The following seven companies: Leonard Nilsen & Sons (EUR292.28 million), Strabag AG, Austria (EUR392.22 million), Skanska Norway AS (EUR 286.26 million), AF Gruppo Norway AS (EUR 285.60 million), CMC of Ravenna, Italy (EUR340.51 million), Haehre Entreprenor AS (EUR283.23 million) and Veidekke Entreprenor AS (EUR274.33 million) have been sent the offers for contract K10 (Svegatjorn-Fanavege), part of E39 Svegatjorn-Radal project, including the construction of Skogafjells tunnel, 1.5 km T11.5 and Lyhorn tunnel, 9.2 km T9.5, as well as one water tunnel, 1.7 km T5. Click no/13 for tunnelbuilder archive. Visit http://www.vegvesen.no/Vegprosjekter/e39svegatjornradal/Nyhetsarkiv/sju-tilbod-p%C3%A5-stor-kontrakt. 19/15.

 

 



Permalink


Implenia Norge AS at Oslo secured the EUR158.32 million contract, excluding VAT, for contract K11 (Radal-Nordas-Flyplassvegen). The contract, part of E39 Svegatjorn-Radal project,  includes the construction of the Ra and Soras tunnels (cross section from T9.5 to T27) and a 1.5 km water tunnel (cross section T5). Contact Knut Langeland, Statens Vegvesen Western Region, Leikanger, e-mail knut.langeland@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=327253-2015. Ref.n. 2014115867. 38/15.




Permalink


Veidekke Entreprenor AS of Oslo secured the EUR248.89 million contract, excluding VAT, for the contract for K10 (Svegatjorn-Fanavege), part of the E39 Svegatjorn-Radal project. The contract includes the construction of Skogafjells tunnel (1.5 km) T11.5 and  the Lyhorn tunnel (9.2 km) T9.5, as well as one water tunnel (1.7 km) T5. For further information https://kgv.doffin.no/ctm/Supplier/Documents/Folder/125020. Contact Kari Bremnes, Statens Vegvesen Western Region, Leikanger, e-mail kari.bremnes@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=327252-2015. Ref.n. 2014119316. 38/15.




Permalink


Multiconsult ASA atNesttun secured the EUR2.59 million contract, excluding VAT, for the engineering design services and preparation of the tender documentation for control, regulation, monitoring (CRM), radio-rescue and communication (contract K3) for the full area of E39 Svegatjorn-Radal project, with tunnels  Skogafjells (1,500 m), Lyshorn (9,300 m), Soras (1,800 m) and Ra (2,200 m)/(1,000 m). Duration of the contract is from 17.08.2015 to 07.10.2016. Contact Markus Halland, The Norwegian Public Roads Administration, Region West, Leikanger, e-mail markus.halland@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=12470-2016. Ref.n. 2015045059. 02/16.




Permalink


Open invitation to tender, deadline 21.08.2017, for execution of electro-technical installations and CRM (control, regulation and monitoring) for the E39 Svegatjorn-Radal  entire project (contract K20). The duration of contract is from 23/10/2017 to  24/11/2021. For electronic access to information visit https://kgv.doffin.no/ctm/Supplier/Documents/Folder/153850. Contact Terje Gundersen, The Norwegian Public Roads Administration, Western Region, Leikanger, e-mail terje.gundersen@vegvesen.no. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=168966-2017. Ref.n. 2016/132787. 17/17.




Permalink

Norway, Haugeland - no/12

Propane Storage

  Two caverns 20m-wide x 190m-long x 33m-high in phyllite, rockbolted and shotcreted. Total excavation 250,000m3. Contract includes 4km of 30m2 section cooling water tunnel and 1km of 65m2 section road tunnel. Contractor: AF Spesialprosjekt using Atlas Copco Rocket Boomer 353 rigs with COP 1838 drills, one with extended reach. Bever controls for contouring. Caverns excavated on three benches with two faces at each level. 1,200m3 blasted in each round. Completion end-1998. Dec 1998.



Permalink

Norway, Oslo - no/11

Fjord Crossing

Twin 7.4 km tubes each with two lanes. Maximum gradient 7%, lowest point 130 m below sea level. Estimated completion 3 years. Value $90 million. Second land tunnel 2.4 km long. October 1998.



Permalink

Open invitation to tender, deadline 10.06.2010, for construction of two tunnels, one bridge and adjoining roads. Contract involves: 1.195 km-long Kaejfjord tunnel on TO3 with 65 m portals and 2.6 km of road; and 680 m-long Skjaeholmen tunnel on Rv 94 with 20 m portals, 1.5 km road and 33 m bridge. Site survey at 10.00h on 11.05.2010 at Skjaeholmen bridge on national road 94 in Kvalsund municipality. Time limit for requesting or accessing documents 21.05.2010. More information, specs and docs from Torgeir Dahle at Statens vegvesen Region nord in Alta, tel +47 6640 99211801/90673913, e-mail torgeir.dahle@vegvesen.no. Tenders or requests to participate should be sent to Edgar Olsen in Alta, tel +47 6640 90673913, e-mail edgar.olsen@vegvesen.no. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=125120-2010. 17/10.



Permalink

Page: