Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Austria

Austria, Innsbruck-Kufstein - at/56

Fritzens/Baumkirchen - High Speed Railway

  Preinformation notice for construction of the Fritzens-Baumkirchen section, 5.3 km in length, on the Innsbruck-Kufstein rail link in Unterintal, Tyrol. Cut-and-cover construction, either 1.5 and 2 km plus Baumkirchen station or 1 and 3 km. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=028395-2003, OJ S 34, or contact Brenner Eisenbahn, Innsbruck, fax +43 512 5309110. E-mail Hans Lindenberger or Christian Nemec bw@beg.co.at 09/03.Preinformation notice for construction management and work control of the Fritzens-Baumkirchen section. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=028666-2003, OJ S 34, or contact Brenner Eisenbahn, Innsbruck, fax +43 512 5309110. E-mail Hans Lindenberger or Christian Nemec bw@beg.co.at 09/03.Open call for bids, deadline 9th August, 2004 for construction of the 5.2 km Fritzens/Baumkirchen section in loose ground. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=085805-2004, OJ S 105, or contact Brenner Eisenbahn, Innsbruck, fax +43 512576887. E-mail bws@beg.co.at 24/04.Open invitation to tender, deadline 28th October, 2004 for construction management and work control of the 5.3 km Fritzens-Baumkirchen section on the Innsbruck-Kufstein rail link in Unterinntal, Tyrol including between 1 and 3 km of cut-and-cover construction. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=149372-2004, OJ S 174, or contact Brenner Eisenbahn, Innsbruck, fax +43 512576887. E-mail bws@beg.co.at 38/04.Open invitation to tender, deadline 27th October, 2004 for geotechnical measurements for the 5.3 km Fritzens-Baumkirchen section on the Innsbruck-Kufstein rail link. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=149376-2004, OJ S 174, or contact Brenner Eisenbahn, Innsbruck, fax +43 512576887. E-mail bws@beg.co.at 38/04.Geoconsult ZT and SEIB Ingenieur-Consult secured a EUR4.9 million contract for construction supervision for the approximately 5.3 km-long section of the Lower Inn Valley railway to the Brenner high speed line, between Fritzens and Baumkirchen. Visit www.gcs.co.at and www.seib.de 09/05.A JV of Strabag, Hochtief and Zueblin secured a EUR138.9 million contract for construction of the 5.2 km Fritzens/Baumkirchen section in soft ground (contract H7-1), including 400 m of NATM and 2.4 km of cut-and-cover. It is a dual-track section. Visit www.bauholding.at, www.hochtief.de and www.zueblin.de 11/05.IBPA secured a EUR67,900 contract for construction management and work control of the 5.3 km Fritzens-Baumkirchen section on the Innsbruck-Kufstein rail link in Lower Inn Valley including 1 to 3 km of cut-and-cover tunnel. Visit www.ibpa.info 20/05.Ingermeier Ingenieure secured a EUR792,700 contract for geotechnical measurements for the 5.3 km Fritzens-Baumkirchen section on the Innsbruck-Kufstein rail link in Lower Inn Valley. Visit www.angermeier.de 20/05.



Permalink

Negotiated invitation to tender, deadline 07.09.2015, for equipment maintenance in tunnels on the new railways Vienna-St. Polten, Innsbruck-Kufstein in Unterintal and Koralm. The contract is composed of six lots of duration 01.01.2016 to 31.12.2018, with a optional extension to 31.12.2020. Contact OEBB-Infrastruktur AG, represented by OEBB Business Competence Center GmbH, att.n Florian Fuehrer, Vienna, tel +43 19300032927, e-mail florian.fuehrer@oebb.at. For electronic access www.oebb.at/m2c. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=291490-2015. Ref.n. 2015/M2C ID-N.3723. 34/15.




Permalink