On 23.04.2012 the JV Danya Cebus/China Civil Engineering Construction Corp (CCECC) began work on a 4.6 km-long twin-bore tunnel at a depth of 100 m that will carry the new Acre-Carmiel railway under Gilon mountain. The two tubes will have 18 cross passages at 250 m intervals. The contract was awarded to Danya Cebus and CCECC in 2011 by Israel National Roads Company Ltd, which is also responsible for rail projects. Click here for the video, here for more on the project and il/16. Visit www.danya-cebus.co.il, www.ccecc.com.cn and www.iroadsrnd.co.il. 19/12.
15.07.2025 Spain
21.07.2025 Czech Republic
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Germany
29.07.2025 Czech Republic
31.07.2025 France
05.08.2025 Poland
11.08.2025 Switzerland
14.08.2025 Switzerland
14.08.2025 Italy
19.08.2025 Spain
26.08.2025 Switzerland
01.09.2025 Switzerland
01.09.2025 Brazil
02.09.2025 Spain
15.09.2025 Sweden
15.09.2025 Italy
22.09.2025 Netherlands