On 23.04.2012 the JV Danya Cebus/China Civil Engineering Construction Corp (CCECC) began work on a 4.6 km-long twin-bore tunnel at a depth of 100 m that will carry the new Acre-Carmiel railway under Gilon mountain. The two tubes will have 18 cross passages at 250 m intervals. The contract was awarded to Danya Cebus and CCECC in 2011 by Israel National Roads Company Ltd, which is also responsible for rail projects. Click here for the video, here for more on the project and il/16. Visit www.danya-cebus.co.il, www.ccecc.com.cn and www.iroadsrnd.co.il. 19/12.
31.03.2025 Sweden
01.04.2025 Germany
01.04.2025 Poland
02.04.2025 Austria
04.04.2025 Austria
07.04.2025 France
07.04.2025 Germany
07.04.2025 Spain
08.04.2025 Netherlands
11.04.2025 Italy
11.04.2025 Switzerland
14.04.2025 Switzerland
14.04.2025 Austria
22.04.2025 Germany
22.04.2025 Sweden
23.04.2025 Norway
24.04.2025 Romania
25.04.2025 Poland
25.04.2025 Norway
25.04.2025 Switzerland
30.04.2025 Austria
06.05.2025 Germany
09.05.2025 Switzerland
14.05.2025 Switzerland
16.05.2025 Switzerland
27.06.2025 Switzerland