The TBM Chessie, that was custom-made by Herrenknecht for Dragados USA Inc and Schiavone Construction Co. LLC, is now ready to begin construction of the New Tunnel under the Thimble Shoal Canal in Chesapeake Bay, Virginia, USA. The TBM EPB has a diameter of 13 m and is about 100 m long. Click here for more information about the project, and us/121 for the tunnelbuilder archive. Also visit http://www.cbbt.com/ . 34/18.
23.02.2026 Switzerland
23.02.2026 Denmark
24.02.2026 Italy
25.02.2026 United Kingdom
19.03.2026 Bulgaria
24.03.2026 Italy
31.03.2026 Ireland
23.04.2026 Sweden
24.04.2026 United Kingdom
04.05.2026 Switzerland
04.06.2026 Switzerland