The TBM Chessie, that was custom-made by Herrenknecht for Dragados USA Inc and Schiavone Construction Co. LLC, is now ready to begin construction of the New Tunnel under the Thimble Shoal Canal in Chesapeake Bay, Virginia, USA. The TBM EPB has a diameter of 13 m and is about 100 m long. Click here for more information about the project, and us/121 for the tunnelbuilder archive. Also visit http://www.cbbt.com/ . 34/18.
10.11.2025 Bosnia and Herzegovina
11.11.2025 Spain
13.11.2025 France
13.11.2025 Germany
13.11.2025 Switzerland
17.11.2025 Romania
20.11.2025 Romania
21.11.2025 Switzerland
21.11.2025 Austria
27.11.2025 Spain
27.11.2025 Switzerland
09.12.2025 Switzerland
09.12.2025 Belgium
09.12.2025 Italy