Eight Terratec 6.52 m-diameter EPBs are at work on Delhi Metro Phase 3. During the last two months, four significant breakthroughs have been recorded, and another 14 will be accomplished during the coming year. Read the press release and visit http://terratec.co/NewsInfos/detail/19. 45/14.
04.04.2025 Austria
07.04.2025 France
07.04.2025 Germany
07.04.2025 Spain
08.04.2025 Netherlands
11.04.2025 Switzerland
11.04.2025 Italy
14.04.2025 Austria
14.04.2025 Switzerland
15.04.2025 Poland
17.04.2025 Austria
22.04.2025 Germany
22.04.2025 Sweden
23.04.2025 Norway
23.04.2025 Germany
24.04.2025 Romania
25.04.2025 Poland
25.04.2025 Switzerland
25.04.2025 Norway
28.04.2025 Germany
28.04.2025 Austria
30.04.2025 Austria
06.05.2025 Germany
09.05.2025 Poland
09.05.2025 Switzerland
14.05.2025 Switzerland
16.05.2025 Switzerland
16.05.2025 Italy
26.05.2025 Czech Republic
27.06.2025 Switzerland