Delhi Jal Board DJB is laying a 59 km-long sewer along the Yamuna river at depths of 6-18 m on which a Terratec DN1600 microtunnelling system is already halfway through its allotted task. Read the press release and visit www.terratec.co. 02/13.
30.04.2024 Germany
07.05.2024 Poland
07.05.2024 Switzerland
13.05.2024 India
15.05.2024 Czech Republic
15.05.2024 Macedonia
16.05.2024 Finland
17.05.2024 Finland
24.05.2024 Switzerland
31.05.2024 Switzerland
07.06.2024 Canada
15.12.2024 Austria