Delhi Jal Board DJB is laying a 59 km-long sewer along the Yamuna river at depths of 6-18 m on which a Terratec DN1600 microtunnelling system is already halfway through its allotted task. Read the press release and visit www.terratec.co. 02/13.
09.12.2025 Austria
09.12.2025 Belgium
09.12.2025 Italy
09.12.2025 Switzerland
10.12.2025 Belgium
16.12.2025 Iceland
17.12.2025 Italy
06.01.2026 France
12.01.2026 Austria
23.01.2026 Switzerland