Delhi Jal Board DJB is laying a 59 km-long sewer along the Yamuna river at depths of 6-18 m on which a Terratec DN1600 microtunnelling system is already halfway through its allotted task. Read the press release and visit www.terratec.co. 02/13.
12.01.2026 Austria
14.01.2026 Netherlands
15.01.2026 Spain
16.01.2026 Germany
20.01.2026 Romania
23.01.2026 Switzerland
23.01.2026 Ireland
26.01.2026 Italy
26.01.2026 Germany
29.01.2026 Bosnia and Herzegovina
04.02.2026 Germany
06.02.2026 Spain
09.02.2026 Norway