On December 2nd the shield for the TBM Gaia weighing 150 tons and 11 m in diameter was lifted out of the receiving shaft of the Rijnland Route. The rest of the TBM will be dismantled throughout December and removed through the shaft. For further information please click here and nl/41 for the tunnelbuilder archive and also visit https://rijnlandroute.nl and https://www.comol5.nl/. 47/20.
07.05.2024 Poland
07.05.2024 Switzerland
13.05.2024 India
15.05.2024 Macedonia
15.05.2024 Czech Republic
16.05.2024 Finland
17.05.2024 Finland
24.05.2024 Switzerland
31.05.2024 Switzerland
07.06.2024 Canada
15.12.2024 Austria