On the 20.06.2018 Adif completed the excavation of the left tube of the Requejo tunnel (2.5 km), on the Pedralba de la Praderia - Padornelo Tunnel subsection (province of Zamora) of the AV Madrid-Galizia line. The left tube of the Requejo tunnel is 2,540 m long, of which 20 m and 120 m at the cut and cover portals and the remaining 2.4 km will be dug in the traditional way. Click es/110 for the tunnelbuilder archive. Go to http://prensa.adifaltavelocidad.es/nde/u08/GAP/Prensa.nsf/Vo000A/386C0949DF14710AC12582B20039FA87?Opendocument.
31.07.2025 Czech Republic
31.07.2025 France
31.07.2025 Germany
04.08.2025 Austria
05.08.2025 Poland
11.08.2025 Switzerland
12.08.2025 Austria
12.08.2025 Czech Republic
14.08.2025 Austria
14.08.2025 Italy
14.08.2025 Switzerland
19.08.2025 Spain
25.08.2025 France
26.08.2025 Switzerland
29.08.2025 Denmark
01.09.2025 Brazil
01.09.2025 Switzerland
02.09.2025 Macedonia
02.09.2025 Spain
03.09.2025 Spain
11.09.2025 Switzerland
15.09.2025 Sweden
15.09.2025 Italy
22.09.2025 Netherlands
03.10.2025 Netherlands