On 25.04.2013 construction started on Stage III of Line 1 Metro extension Mladost 1-Business Park-Mladost 4 in Sofia, Bulgaria. The new section, to be built totally underground using cut/cover, is 2.7 km-long with 3 metro stations. Deadline for completion of the section and the stage is 25.04.2015. Click bg/11. Visit www.metropolitan.bg. 18/13.
30.04.2024 Germany
07.05.2024 Poland
07.05.2024 Switzerland
13.05.2024 India
15.05.2024 Czech Republic
15.05.2024 Macedonia
16.05.2024 Finland
17.05.2024 Finland
24.05.2024 Switzerland
31.05.2024 Switzerland
07.06.2024 Canada
15.12.2024 Austria