On 25.04.2013 construction started on Stage III of Line 1 Metro extension Mladost 1-Business Park-Mladost 4 in Sofia, Bulgaria. The new section, to be built totally underground using cut/cover, is 2.7 km-long with 3 metro stations. Deadline for completion of the section and the stage is 25.04.2015. Click bg/11. Visit www.metropolitan.bg. 18/13.
01.07.2025 Germany
01.07.2025 Poland
03.07.2025 Czech Republic
04.07.2025 Norway
10.07.2025 Germany
15.07.2025 Spain
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
11.08.2025 Switzerland
14.08.2025 Switzerland
19.08.2025 Spain
01.09.2025 Brazil
01.09.2025 Switzerland
15.09.2025 Sweden