On 25.04.2013 construction started on Stage III of Line 1 Metro extension Mladost 1-Business Park-Mladost 4 in Sofia, Bulgaria. The new section, to be built totally underground using cut/cover, is 2.7 km-long with 3 metro stations. Deadline for completion of the section and the stage is 25.04.2015. Click bg/11. Visit www.metropolitan.bg. 18/13.
03.11.2025 Romania
04.11.2025 Slovakia
04.11.2025 Germany
05.11.2025 Germany
06.11.2025 Belgium
06.11.2025 Slovakia
06.11.2025 Romania
10.11.2025 Bosnia and Herzegovina
11.11.2025 Spain
13.11.2025 France
13.11.2025 Germany
13.11.2025 Switzerland
17.11.2025 Romania
20.11.2025 Romania
21.11.2025 Austria
21.11.2025 Switzerland
27.11.2025 Switzerland
27.11.2025 Spain
09.12.2025 Switzerland
09.12.2025 Belgium