On 25.04.2013 construction started on Stage III of Line 1 Metro extension Mladost 1-Business Park-Mladost 4 in Sofia, Bulgaria. The new section, to be built totally underground using cut/cover, is 2.7 km-long with 3 metro stations. Deadline for completion of the section and the stage is 25.04.2015. Click bg/11. Visit www.metropolitan.bg. 18/13.
24.06.2025 Austria
24.06.2025 Germany
24.06.2025 Switzerland
27.06.2025 Switzerland
01.07.2025 Germany
04.07.2025 Norway
15.07.2025 Spain
22.07.2025 France
28.07.2025 Brazil
01.09.2025 Brazil
15.09.2025 Sweden