Work has started on assembling TBM Lucia, which will drive the 3.9 km tunnel for the national road SS 1 Nuova Aurelia, access to the Savona harbour. The contract was awarded to JV Cooperativa Muratori e Cementisti CMC and Itinera SpA of Ravenna. The cutterhead has a 13.72 m diameter and a total weight of 250 t. Click here and it/88 for tunnelbuilder archive. 39/13.
15.09.2025 Italy
15.09.2025 Sweden
19.09.2025 Norway
22.09.2025 Netherlands
29.09.2025 Germany
03.10.2025 Netherlands
06.10.2025 Spain
07.10.2025 Germany
09.10.2025 Germany
09.10.2025 Switzerland
10.10.2025 Norway
10.10.2025 Spain
13.10.2025 Switzerland
15.10.2025 France