This year, you have the unique chance to visit the entire
underground area between the Ahrental access tunnel, Aldrans and Ampass and to
see the different steps required to build a tunnel lining as well as a
completed inner lining.
The Open Tunnel Day begins at 09.00 a.m. with a Holy Mass.
Subsequently, the BBT SE engineers will
tell you everything about the interesting aspects of this project of the
century. Life Radio will be reporting live from the tunnel all day long. Tunnel
cinema, a 3-D flight above the project area, a construction machinery
exhibition and lots of play options for children as well as an artist’s
workshop will inform and entertain visitors of all ages. Food and drink will be
provided.
Shuttle buses will bring you from the DEZ-parking lot to the
construction site and/or to the event zone inside the tunnel.. Another shuttle
service will be available between Innsbruck Main Station (platform D) and the
DEZ shopping centre. It will shuttle regularly back and forth during the event.
There is no parking available on the construction site. Therefore, parking is
allowed only on the DEZ-parking lot and the Hervis parking space (Grabenweg).
We recommend wearing heavy shoes. The temperature in the
tunnel is about 20 degrees Celsius.
The BBT SE team is looking forward to your visit!
Please note that this is a public event. Photographs and
films will be taken in the event area (pedestrian area in the tunnel). These
can be published on TV and in print and online media as part of the coverage
for this event.
For further information please visit https://www.bbt-se.com/en/information/news/detail/news/tag-des-offenen-tunnels-ahrental-aldrans-ampass-16092018/
and https://www.bbt-se.com/en/information/news/detail/news/open-tunnel-day-isarco-river-underpass-september-23rd-2018/