The dimensions of the Stad ship tunnel are massive with a height of 50 m and a width of 36 m, in a length of 1,700 m. In total, more than three million cubic meters of solid rock must be removed from the tunnel. The Coastal Administration and the municipalities of Stad, Kinn and Vanylven have now agreed on a priority list of which business initiatives can receive rock masses from the Stad ship tunnel. For further information please click here and no/132 for the tunnelbuilder archive and visit https://kystverket.no/en. 09/24.
28.04.2025 Austria
28.04.2025 France
28.04.2025 Germany
30.04.2025 India
30.04.2025 Austria
30.04.2025 Switzerland
02.05.2025 Germany
05.05.2025 Macedonia
06.05.2025 Germany
07.05.2025 Germany
09.05.2025 Germany
09.05.2025 Switzerland
09.05.2025 Poland
13.05.2025 Germany
14.05.2025 Poland
14.05.2025 Switzerland
16.05.2025 Switzerland
16.05.2025 Italy
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Norway
26.05.2025 Czech Republic
28.05.2025 Italy
05.06.2025 Iceland
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
27.06.2025 Switzerland
28.07.2025 Brazil