The 50th anniversary of the inauguration of the Mont Blanc tunnel was celebrated on 15.09.2012. Next year, the Janus fire appliances currently stationed at the adits and in the middle of the tunnel will be replaced by new vehicles equipped with georadar lasers. Onboard water capacity of the appliances is tripled to 12,000 litres to enable a 15-minute range of action.
A new management system is being installed, analyzing the 35,000 items of data collected from cameras and sensors installed in the tunnel, and allowing operators to activate the automatic station control systems and procedures suitable for all circumstances. Visit www.tunnelmb.net. 38/12.
01.04.2025 Germany
01.04.2025 Poland
02.04.2025 Austria
04.04.2025 Austria
07.04.2025 Germany
07.04.2025 France
07.04.2025 Spain
08.04.2025 Netherlands
11.04.2025 Switzerland
11.04.2025 Italy
14.04.2025 Switzerland
14.04.2025 Austria
22.04.2025 Germany
22.04.2025 Sweden
23.04.2025 Norway
23.04.2025 Germany
24.04.2025 Romania
25.04.2025 Poland
25.04.2025 Norway
25.04.2025 Switzerland
28.04.2025 Austria
30.04.2025 Austria
06.05.2025 Germany
09.05.2025 Switzerland
14.05.2025 Switzerland
16.05.2025 Switzerland
16.05.2025 Italy
27.06.2025 Switzerland