After an extensive amount of research and testing CREG has developed the world's first U-sharp EPB machine for application in soft ground conditions. The Menghua U-sharp EPB TBM created by CREG has successfully completed the first 500m of the 3,345 m Baicheng railway tunnel, located in Shanxi Province. The tunnel is in being constructed in Quaternary alluvium (silty fine sand and yellowish clay).
The TBM was launched in November 2016 and after a period of adaptation achieved a high level of productivity producing five rings per shift. For further information please read their press release or visit their website http://creg-germany.com. 04/17.
09.03.2026 Italy
11.03.2026 Italy
19.03.2026 Bulgaria
20.03.2026 Italy
23.03.2026 France
24.03.2026 Italy
31.03.2026 Ireland
09.04.2026 Germany
23.04.2026 Sweden
24.04.2026 United Kingdom
30.04.2026 Sweden
04.05.2026 Switzerland
04.06.2026 Switzerland