After an extensive amount of research and testing CREG has developed the world's first U-sharp EPB machine for application in soft ground conditions. The Menghua U-sharp EPB TBM created by CREG has successfully completed the first 500m of the 3,345 m Baicheng railway tunnel, located in Shanxi Province. The tunnel is in being constructed in Quaternary alluvium (silty fine sand and yellowish clay).
The TBM was launched in November 2016 and after a period of adaptation achieved a high level of productivity producing five rings per shift. For further information please read their press release or visit their website http://creg-germany.com. 04/17.
02.01.2025 Czech Republic
09.01.2025 Switzerland
14.01.2025 Poland
15.01.2025 Romania
15.01.2025 Germany
17.01.2025 Spain
17.01.2025 Switzerland
20.01.2025 Switzerland
20.01.2025 Croatia
23.01.2025 France
27.01.2025 Switzerland
29.01.2025 Romania
31.01.2025 Norway
10.02.2025 Switzerland
20.02.2025 Germany
06.03.2025 Germany
01.04.2025 Poland
16.05.2025 Switzerland