After an extensive amount of research and testing CREG has developed the world's first U-sharp EPB machine for application in soft ground conditions. The Menghua U-sharp EPB TBM created by CREG has successfully completed the first 500m of the 3,345 m Baicheng railway tunnel, located in Shanxi Province. The tunnel is in being constructed in Quaternary alluvium (silty fine sand and yellowish clay).
The TBM was launched in November 2016 and after a period of adaptation achieved a high level of productivity producing five rings per shift. For further information please read their press release or visit their website http://creg-germany.com. 04/17.
07.02.2025 France
07.02.2025 Italy
07.02.2025 Poland
07.02.2025 Spain
10.02.2025 Switzerland
17.02.2025 Romania
20.02.2025 Germany
27.02.2025 Romania
06.03.2025 Germany
06.03.2025 Norway
11.03.2025 Italy
13.03.2025 Switzerland
01.04.2025 Poland
16.05.2025 Switzerland