On the 28.05.2018 the flagging-off ceremony was held for the Kalkaji Mandir - Janakpuri West section of Line 8 (Magenta Line) in Delhi. The 24.82 km Janakpuri West – Kalkaji Mandir corridor (underground 21.9 km and elevated 2.9 km) is the longest stretch opened as part of Delhi’s Metro Phase 3 so far. It consists of 16 stations, 14 of which are underground, and will provide Metro connectivity to the national capital’s arterial Outer Ring Road. The corridor will also connect the airport’s domestic terminal with Metro services for the first time. Delhi Metro now has a network of 277 km. By December this year, it will reach the 380 km stage.
Click here and in/11 for the tunnelbuilder archive. Also visit http://www.delhimetrorail.com/press_reldetails.aspx?id=eQM2nlig5R4lld. 22/18.
28.05.2025 Italy
30.05.2025 Poland
02.06.2025 Spain
04.06.2025 Austria
04.06.2025 Norway
05.06.2025 Iceland
05.06.2025 Italy
09.06.2025 Switzerland
13.06.2025 Norway
13.06.2025 Austria
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
04.07.2025 Norway
28.07.2025 Brazil