On the 28.05.2018 the flagging-off ceremony was held for the Kalkaji Mandir - Janakpuri West section of Line 8 (Magenta Line) in Delhi. The 24.82 km Janakpuri West – Kalkaji Mandir corridor (underground 21.9 km and elevated 2.9 km) is the longest stretch opened as part of Delhi’s Metro Phase 3 so far. It consists of 16 stations, 14 of which are underground, and will provide Metro connectivity to the national capital’s arterial Outer Ring Road. The corridor will also connect the airport’s domestic terminal with Metro services for the first time. Delhi Metro now has a network of 277 km. By December this year, it will reach the 380 km stage.
Click here and in/11 for the tunnelbuilder archive. Also visit http://www.delhimetrorail.com/press_reldetails.aspx?id=eQM2nlig5R4lld. 22/18.
13.03.2025 Switzerland
14.03.2025 Slovakia
17.03.2025 Norway
17.03.2025 France
19.03.2025 Germany
19.03.2025 Norway
21.03.2025 Spain
24.03.2025 Romania
24.03.2025 Greece
24.03.2025 Austria
24.03.2025 Croatia
26.03.2025 Finland
27.03.2025 Spain
28.03.2025 France
31.03.2025 Sweden
01.04.2025 Germany
01.04.2025 Poland
04.04.2025 Austria
07.04.2025 France
07.04.2025 Spain
08.04.2025 Netherlands
14.04.2025 Switzerland
25.04.2025 Norway
16.05.2025 Switzerland