On 25/04/2022 the TBM Caroline reached the future Antonypole station in the Antony municipality for Line 18, of the Grand Paris Express project. The TBM - launched in December 2021 from the Marechal Leclerc shaft in Massy, has driven 720 m, making the first breakthrough on Line 18. The machine will shortly continue its journey onwards towards the Pistes d'Orly manufact. For further information please click here and fr/127 for tunnelbuilder archive. Visit https://www.societedugrandparis.fr. 18/22.
07.04.2025 France
07.04.2025 Germany
07.04.2025 Spain
08.04.2025 Netherlands
11.04.2025 Italy
11.04.2025 Switzerland
14.04.2025 Switzerland
14.04.2025 Austria
15.04.2025 Poland
17.04.2025 Austria
22.04.2025 Germany
22.04.2025 Sweden
23.04.2025 Germany
23.04.2025 Norway
24.04.2025 Romania
25.04.2025 Switzerland
25.04.2025 Norway
25.04.2025 Poland
28.04.2025 Germany
28.04.2025 Austria
30.04.2025 Austria
06.05.2025 Germany
09.05.2025 Poland
09.05.2025 Switzerland
14.05.2025 Switzerland
16.05.2025 Switzerland
16.05.2025 Italy
26.05.2025 Czech Republic
27.06.2025 Switzerland