TBM Aby has broken through at the Villejuif Louis-Aragon station on Line 15 South. The TBM - that last March crossed the Vitry Centre Station - completed the 4.3km tunnel from the Arrighi shaft. Click here for the video, here and fr/127 for tunnelbuilder archive. Visit https://www.societedugrandparis.fr. 41/21.
25.11.2024 Austria
27.11.2024 Poland
28.11.2024 Austria
03.12.2024 Austria
05.12.2024 France
05.12.2024 Germany
06.12.2024 United States
09.12.2024 France
09.12.2024 Austria
12.12.2024 Belgium
12.12.2024 Switzerland
13.12.2024 Norway
13.12.2024 Germany
15.12.2024 Austria
09.01.2025 Switzerland
15.01.2025 Germany
17.01.2025 Spain