TBM Aby has broken through at the Villejuif Louis-Aragon station on Line 15 South. The TBM - that last March crossed the Vitry Centre Station - completed the 4.3km tunnel from the Arrighi shaft. Click here for the video, here and fr/127 for tunnelbuilder archive. Visit https://www.societedugrandparis.fr. 41/21.
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
20.06.2025 Italy
24.06.2025 Switzerland
24.06.2025 Germany
27.06.2025 Switzerland
01.07.2025 Germany
04.07.2025 Norway
28.07.2025 Brazil
01.09.2025 Brazil