TBM Aby has broken through at the Villejuif Louis-Aragon station on Line 15 South. The TBM - that last March crossed the Vitry Centre Station - completed the 4.3km tunnel from the Arrighi shaft. Click here for the video, here and fr/127 for tunnelbuilder archive. Visit https://www.societedugrandparis.fr. 41/21.
01.07.2025 Germany
01.07.2025 Poland
03.07.2025 Czech Republic
04.07.2025 Norway
10.07.2025 Germany
15.07.2025 Spain
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
11.08.2025 Switzerland
14.08.2025 Switzerland
19.08.2025 Spain
01.09.2025 Brazil
01.09.2025 Switzerland
15.09.2025 Sweden