TBM Aby has broken through at the Villejuif Louis-Aragon station on Line 15 South. The TBM - that last March crossed the Vitry Centre Station - completed the 4.3km tunnel from the Arrighi shaft. Click here for the video, here and fr/127 for tunnelbuilder archive. Visit https://www.societedugrandparis.fr. 41/21.
19.09.2025 Norway
22.09.2025 Netherlands
26.09.2025 Poland
29.09.2025 Germany
03.10.2025 Netherlands
06.10.2025 Spain
07.10.2025 Germany
09.10.2025 Germany
09.10.2025 Switzerland
10.10.2025 Spain
10.10.2025 Norway
13.10.2025 Switzerland
15.10.2025 France
10.11.2025 Bosnia and Herzegovina