On 09.01.2013 Sophia, Crossrail’s fifth TBM, began the drive from Plumstead to North Woolwich which will carry London’s new rail link under the River Thames. The 110 m-long machine is scheduled to bore around 100 m/week, installing a lining of precast concrete segmental rings. Visit uk/40 and http://www.crossrail.co.uk/news/press-releases/crossrail-tunnelling-in-souast-london-gets-underway. 03/13.
15.01.2025 Germany
15.01.2025 Romania
17.01.2025 Spain
17.01.2025 Switzerland
20.01.2025 Switzerland
20.01.2025 Croatia
21.01.2025 Romania
23.01.2025 France
27.01.2025 Switzerland
29.01.2025 Romania
30.01.2025 France
31.01.2025 Germany
31.01.2025 Norway
04.02.2025 Belgium
04.02.2025 France
10.02.2025 Switzerland
20.02.2025 Germany
06.03.2025 Germany
11.03.2025 Italy
01.04.2025 Poland
16.05.2025 Switzerland