On 09.01.2013 Sophia, Crossrail’s fifth TBM, began the drive from Plumstead to North Woolwich which will carry London’s new rail link under the River Thames. The 110 m-long machine is scheduled to bore around 100 m/week, installing a lining of precast concrete segmental rings. Visit uk/40 and http://www.crossrail.co.uk/news/press-releases/crossrail-tunnelling-in-souast-london-gets-underway. 03/13.
04.02.2026 Germany
06.02.2026 Spain
09.02.2026 Norway
16.02.2026 Iceland
17.02.2026 France
19.02.2026 Sweden
23.02.2026 Switzerland
19.03.2026 Bulgaria
24.03.2026 Italy
23.04.2026 Sweden
24.04.2026 United Kingdom