On 09.01.2013 Sophia, Crossrail’s fifth TBM, began the drive from Plumstead to North Woolwich which will carry London’s new rail link under the River Thames. The 110 m-long machine is scheduled to bore around 100 m/week, installing a lining of precast concrete segmental rings. Visit uk/40 and http://www.crossrail.co.uk/news/press-releases/crossrail-tunnelling-in-souast-london-gets-underway. 03/13.
02.01.2026 Germany
06.01.2026 France
12.01.2026 Austria
14.01.2026 Netherlands
15.01.2026 Spain
20.01.2026 Romania
23.01.2026 Switzerland
23.01.2026 Ireland
26.01.2026 Italy
26.01.2026 Germany
29.01.2026 Bosnia and Herzegovina
04.02.2026 Germany
06.02.2026 Spain
09.02.2026 Norway