Contractor Shapir, in JV with Pizzarotti, is driving twin 9.7 m-diameter tunnels, each 11.5 km-long, for the Tel Aviv-Jerusalem high-speed railway. Some 14,500 precast concrete rings will be set, using ES TunnelFlex 33 Plus rubber gaskets to withstand the expected 5 bar hydraulic pressure during rainy periods. Read the press release and visit www.esrubber.com. 41/12.
15.12.2024 Austria
16.12.2024 Belgium
16.12.2024 Poland
17.12.2024 Germany
20.12.2024 Czech Republic
20.12.2024 Norway
23.12.2024 Spain
02.01.2025 Czech Republic
09.01.2025 Switzerland
14.01.2025 Poland
15.01.2025 Romania
15.01.2025 Germany
17.01.2025 Spain
17.01.2025 Switzerland
20.01.2025 Switzerland
23.01.2025 France
27.01.2025 Switzerland
10.02.2025 Switzerland
20.02.2025 Germany
06.03.2025 Germany
16.05.2025 Switzerland