Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Deep driller required for Chile

21/05/2014

International recruitment specialist iPS has posted a vacancy for a Spanish-speaking vertical drilling supervisor for a 6 m-diameter water shaft in Chile. Read the details below and contact H.Passchier@ipspowerfulpeople.com. 21/14.

Position - Vertical drilling supervisor in Chili.

  • Vertical shaft is 6 meters in diameter.
  • The project is to bring salt water into the mountains at a height of 3,000 meters.
  • The horizontal tunnels ( in  and out take) have been built so the connection needs to be made by setting up the drilling equipment in the mountains so the person has to be medically fit and able to deal with high altitudes.
  • The duration of the project is at least two years.
  • Preferably Spanish speaking.

 

Job request TA. 00477



NEED QUALIFIED PERSONNEL?