This October
the drill & blast excavation of the 2km La Piramide tunnel in the Recolet
municipality started . The tunnel is one of the sections of the Americo
Vespucio Oriente I (AVO I) which will join together the Avenida de Grecia
(South) with the Avenida El Salto (North) in the east of Santiago, completing
the ring road of the city.
The 9.1 km
long Avenida El Salto-Avenida Principe de Gales section will cross the San
Cristobal hill in a north-south direction, and it will include the
municipalities of Huechuraba, Recoleta, Vitacura, Las Condes, La Reina and
Nunoa.
The La
Piramide tunnel, near the current San Cristobal tunnel, will cross the San
Cristobal hill with three lanes, from North to South. This will connect the
Puente Centenario with the covered trench currently under construction at
Parque Vespucio. The tunnel will be part of the tunnel branch under the Mapocho
river, also built using drill & blast, but with a single carriageway, which
will allow the connection between the AVO I and Costanera Norte motorways,
towards the East, and will connect with the Radial Nororiente motorway ,
entering Santiago from the North East. Click cl/32 for tunnelbuilder archive.
Visit http://www.concesiones.cl/noticias/Paginas/DetalledeNoticias.aspx?item=573
and for further information click here and visit https://www.scavo.cl.
41/18.
http://www.concesiones.cl/proyectos/Paginas/detalleConstruccion.aspx?item=47