TBM Armelle
TBM Armelle, a TBM on the Grand Paris Express Line 16 has broken through. The TBM was originally launched from the Georges Braque shaft in October 2019 and broke through in Aulnay-sous-Bois after 1.3km. The machine will have to drive another 2 km, before reaching its final destination: the Hugo structure in Le Blanc-Mesnil. Once completed, the 3.3 km tunnel will allow trains to access the operations and maintenance centre of Lines 16 and 17 at the ex PSA site in Aulnay-sous-Bois.
For further information please click here and fr/127 for the tunnelbuilder archive. Also visit https://www.societedugrandparis.fr. 38/20.
31.03.2025 Sweden
01.04.2025 Germany
01.04.2025 Poland
02.04.2025 Austria
04.04.2025 Austria
07.04.2025 France
07.04.2025 Germany
07.04.2025 Spain
08.04.2025 Netherlands
11.04.2025 Italy
11.04.2025 Switzerland
14.04.2025 Switzerland
14.04.2025 Austria
22.04.2025 Germany
22.04.2025 Sweden
23.04.2025 Norway
24.04.2025 Romania
25.04.2025 Poland
25.04.2025 Norway
25.04.2025 Switzerland
30.04.2025 Austria
06.05.2025 Germany
09.05.2025 Switzerland
14.05.2025 Switzerland
16.05.2025 Switzerland
27.06.2025 Switzerland