TBM Armelle
TBM Armelle, a TBM on the Grand Paris Express Line 16 has broken through. The TBM was originally launched from the Georges Braque shaft in October 2019 and broke through in Aulnay-sous-Bois after 1.3km. The machine will have to drive another 2 km, before reaching its final destination: the Hugo structure in Le Blanc-Mesnil. Once completed, the 3.3 km tunnel will allow trains to access the operations and maintenance centre of Lines 16 and 17 at the ex PSA site in Aulnay-sous-Bois.
For further information please click here and fr/127 for the tunnelbuilder archive. Also visit https://www.societedugrandparis.fr. 38/20.
10.11.2025 Bosnia and Herzegovina
11.11.2025 Spain
13.11.2025 France
13.11.2025 Germany
13.11.2025 Switzerland
17.11.2025 Romania
20.11.2025 Romania
21.11.2025 Switzerland
21.11.2025 Austria
27.11.2025 Spain
27.11.2025 Switzerland
09.12.2025 Switzerland
09.12.2025 Belgium
09.12.2025 Italy