Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website
  • NFM
  • Terratec
  • Robbins
  • PPS
  • CBE
  • Jennmar
  • Robit
  • Sandvik
  • Normet
  • BASF

Archive Search

India

India, National - in/66

Highway

Closing Date: 16.11.2012 (Tender Closed)

Invitation of Application, deadline 16.11.2012, for empanelment of consultants for Highways Bridges and Tunnel Projects on National Highways and other centrally sponsored schemes. Visit http://www.bro.nic.in/newsdetails.asp?newsid=158 and http://www.morth.nic.in/tenderdetails.asp?lang=1&tid=203. 45/12.



India, Manipur - in/65

Railways

The JV Hindustan Construction Company Ltd (60%)/Coastal Projects Pvt Ltd (40%) has been awarded a project by North Frontier Railway for design and construction of a railway tunnel from km 15.880 to km 19.500 between Dholakal and Kaimai on the new railway line being developed between Jiribam and Tupur in Imphal. The project, which includes a 3.25 km-long single-track tunnel, will be completed in 24 months at a cost of EUR32.6 million. Visit http://www.hccindia.com and www.coastalprojects.co.in. 13/10.



HCC awarded construction contract, value EUR52.5 million duration 28 months, for 4.7 km-long single-track tunnel between Khongsang and Tupur on new railway line between Jiribam and Tupur in Imphal. More from sandeep.sawant@hccindia.com or visit www.hccindia.com and www.coastalprojects.co.in. 37/10.



Open invitation to tender, deadline 30.04.2013, for detail design and construction supervision of NATM method for tunnel n. 2,4,5,6 & 6A. Approximate total length 5.98 km in connection with the construction of new railway line project from Jiribam to Tupul. Duration contract 18 months. Availability of tender documents from 17.04.2013 to 30.04.2013. Visit http://www.nfrcon.org/tenderDet.asp?id=6903. Bid Code n. CE/CON/J-T/Tunnel (Design)/2011/15(RT-1). 12/13.



Open invitation to tender, deadline 30.04.2013, for construction of single line BG tunnel n.26A (length 270 m) at km 92.97 to km 93.24 between Noney and Tupul in connection with construction of new railway line project from Jiribam to Tupul. Duration contract 12 months. Availability of tender documents from 17.04.2013 to 30.04.2013. Visit http://www.nfrcon.org/tenderDet.asp?id=6904.

Bid Code n. CE/CON/J-T/Tunnel No.26A/2013/17. 12/13.



Open invitation to tender, deadline 09.04.2013, for convergence measurement in nine tunnels (length 6.20 km) under jurisdiction of DY.CE/CON-I/Imphal in connection with construction of new railway line project from Jiribam to Tupul. The contract includes supply, installation and maintenance of convergence measuring instruments. Duration contract 20 months. Availability of tender documents from 26.03.2013 to 09.04.2013. Visit http://www.nfrcon.org/tenderDet.asp?id=6892.

Bid Code n. CE/CON/J-I/Tunnel Instrumentation/2013/03. 12/13.



Open invitation to tender, deadline 09.04.2013, for convergence measurement in tunnels T-24, T-25, T-26, T-26-A & T-27 under jurisdiction of DY.CE/CON-II/Imphal in connection with construction of new railway line project from Jiribam to Tupul. The contract includes supply, installation and maintenance of convergence measuring instruments. Duration contract 20 months. Availability of tender documents from 26.03.2013 to 09.04.2013. Visit http://www.nfrcon.org/tenderDet.asp?id=6893. Bid Code n. CE/CON/J-I/Tunnel Instrumentation/2013/04. 12/13.



India, Kolkata - in/64

Metro rail

On 29.01.2009 the Kolkata Metro Rail Corporation Limited (KMRCL), a joint venture between the West Bengal government and the Union urban development ministry, published a pre-qualification notice for design and construction of tunnel by shield TBM and stations by cut/cover on the East West corridor of Kolkata metro rail project. The last date of submission of PQ documents was postponed from 30.03.2009 to 15.05.2009. Visit www.kmrc.in/admin/uploaded_tender/1233226654Final%20PQ%20document%20for%20Underground%20civil%20works.pdfOn 17.08.2009, KMRCL invited bids from the shortlisted/pre-qualified contractors for the design and construction of the underground section from the west end of Central station to end of underground alignment at Subhas Sarobar. The contract includes the 3 stations at Central, Sealdah and Phool Bagan and 4,500 m twin bored tunnels and cut/cover transition structure. Deadline 09.11.2009, later postponed to 09.12.2009. Estimated end of work: 31.03.2013. Code bid: KMRCL/CE/UG2/760/09. Visit www.kmrc.in/admin/uploaded_tender/1250577175Addendum%20No.1%20to%20Notice%20TBM%20UG2%20website%20180809.pdfOn 29.09.2009, KMRCL invited bids from the short listed/prequalified contractors for the design andconstruction of the underground section from the Howrah Maidan station to west end of Central station. The contract includes the three stations at Howrah Maidan, Howrah and Mahakaran and about 3,000 m twin bored tunnels. Deadline 28.12.2009, later postponed to 08.02.2010. Estimated end of work: 31.03.2014. Code bid: KMRCL/CE/UG1/ 903/09. Visit www.kmrc.in/admin/uploaded_tender/1254311924NIT%20for%20UG1%20290909%20&%20Covering%20letter%20LV%20PDF.pdfAt the end of February 2010, the KMRCL awarded to the JV of Italian-Thai Development Public Company Limited (Lead Partner) & ITD Cementation India Ltd, selected among ten pre-qualified groups, the first underground section starting from Subhas Sarobar to Central Metro station of the Kolkata Metro Rail Project. Value of UG2 contract is EUR146.7 million.Despite slight delays, officials claim the elevated section of the East-West corridor will be operational by October, 2013 while the entire project, inclusive of the underground section, will be in service by December, 2014. Visit www.itd.co.th and http://itdcem.co.in/. 10/10.



The UG1 contract for the 3.89 km-long central Calcutta to Howrah Maidan section of Kolkata metro, with three underground stations, has been awarded to Afcons Infrastructure (India) and Transtonnelstroy (Russia), value EUR155.4 million (Rs9.38 billion). The stretch includes a 2,954 m-long tunnel, with 520 m under the Hooghly river, 30 m beneath the water surface and 15 m below the river bed. This is India's first underwater train tunnel. Contract duration is 42 months. Dubai-based firm Atkins will provide consultancy services for the tunnel work, which includes monitoring and studying the impact of tunnelling on the buildings and structure above ground. Visit www.afcons.com and www.atkins-me.co. 13/10.



India, Jammu and Kashmir - in/63

Border Road

Closing Date: 16.11.2009 (Tender Closed)

Prior information notice of invitation to prequalify, deadline 16.11.2009, for consultancy services for detailed feasibility study for construction of 4 km-long highway tunnel across Shinkunla Pass on the new Darcha-Nimu road. Prequalification and tender documents may be downloaded from www.bro.govt.nic.in or www.bro.nic.in from 20.10.2009. Part of Project Deepak, subject to international competitive bidding. Click here for Notice of Tender, and contact Anil Khanna anil@camce.in for local resources. 40/09.



The Letter of Award (LOA) for the 6.50 km Z-Morh tunnel (and 6.050 km approaches) on NH-1 (old NH-1D) was awarded on BOT(Annuity) basis to M/s. Soma Enterprises Ltd. The Concession Period for the EUR543.38 million (Rs. 2716.90 crore) project is 20 years (5 years construction, 15 years maintenance). Besides this tunnel, proposal for another 13.95 km Zojila Tunnel (single tube bi-directional tunnel with parallel egress tunnel and 10.820 km approaches) is under progress. The construction of Zojila Tunnel in continuation of Z–Morh Tunnel is necessary in order to establish all weather connectivity to Kargil and Leh. Visit http://pib.nic.in/newsite/PrintRelease.aspx?relid=93581 and www.soma.co.in. 11/13.



Request for expressions of interest, deadline 28.01.2013, for engaging an Independent

Engineer (IE) for Construction, Operation and Maintenance of 6.5 km of the Z- Morh tunnel on Srinagar Sonamarg Gumri road (NH-1). The project will be executed on DBFOT  (Design, Build, Finance, Operate and Transfer) basis. Download the Expression of interest document from http://www.tenderwizard.com/MORTH, before 27.01.2013. Contact HQ DGBR/E8 Section, Seema Sadak Bhawan, Mr Rakesh Kureel, New Delhi, tel +91 (0)11-25686914, fax +91 (0)11-25696026, e-mail bro-e8@nic.in. Bid Code n. 24552/DGBR/BCN/Z-Morh/01/E8. Visit http://bro.nic.in/writereaddata/tenders/2945496880.pdf. 52-53/12.



India, Andhra Pradesh - in/62

Railway

Closing Date: 30.07.2009 (Tender Closed)

Invitation to tender, deadline 30.07.2009, for construction of cut and cover tunnel at km 135/5-8 and 136/6 of Bhalumaska-Keutguda section of KR line in Waltair division. Tender ref no 16/2009/WAT/ENGG-15. For more visit www.tenders.gov.in or contact R V N S Prasad of East Coast Railway in Visakhapatnam, e-mail srdencowat@yahoo.com 28/09.



India, Jammu and Kashmir - in/61

Hydropower

  Seven-year engineering, procurement and construction contract for the Kishanganga hydro project awarded by NHPC to JV formed by HCC (98%) and Halcrow (2%). Project involves the construction of a 37 m-high concrete faced rockfill dam, 14 km-long headrace tunnel, and a 330 MW underground powerhouse. Tunnel subcontractor SELI will use a new 6.1 m-diameter double shield universal TBM featuring very high cutterhead torque and thrust, with significant overboring, overcutting and ground treatment capabilities. Visit www.hccindia.com, www.halcrow.com and www.selitunnel.com. For details of forty more water tunnel projects in India visit tunnelbuilder archive. 08/09.



India, Arunachal Pradesh - in/60

Hydropower

Invitation for prequalification, deadline 3rd November, 2008 for Lot 3 of the 3,000 MW (12 x 250 MW) Dibang multipurpose project. Lot 3 is for all civil works comprising five 12 m-diameter horseshoe-shaped diversion tunnels varying from 1,175 m to 1,325 m in length (6,260 m altogether); an upstream RCC cofferdam, a downstream earthfill cofferdam and a 288 m-high concrete gravity dam; six intake structures (one for each headrace tunnel); and six smaller horseshoe-shaped headrace tunnels, 9 m in diameter and with lengths varying from 300 m to 600 m (total length of 2,700 m). The completion time is 90 months. Contact National Hydroelectric Power Corporation (NHPC), Chief engineer (civil contracts-IV), NHPC Office complex, Room No.215, Second floor, Sector-33, Faridabad 121003, Haryana. Tel. +91 1292270974, fax +91 1292254674, e-mail tkkapoor@nhpc.nic.in. Visit www.nhpcindia.com/English/Scripts/Tender_Specification.aspx?vid=2133 and www.nhpcindia.com/English/Scripts/T_tender_extension_link.aspx?vid=1529 40/08.Invitation for prequalification, deadline 31st October, 2008 for Lot 4 of the 3,000 MW (12 x 250 MW) Dibang multipurpose project. Lot 4 is for all civil works comprising six 184.8 m-high 7.5 m-diameter vertical pressure shafts downstream of each headrace tunnel; an underground powerhouse complex containing 12 x 250 MW units with a 277.8 m-long x 17 m-wide x 26.1 m-high MIV cavern, a 382.8 m-long x 24.5 m-wide x 54.8 m-high powerhouse cavern and a 325 m-long x 19 m-wide x 31.5 m-high transformer cavern; six 9 m-diameter horseshoe-shaped tailrace tunnels varying from 320 m to 470 m in length; and a pothead yard. Completion time is 78 months. Contact National Hydroelectric Power Corporation (NHPC), Chief engineer (civil contracts-IV), NHPC Office complex, Room No. 216, Second floor, Sector-33, Faridabad 121003, Haryana. Tel. +91 1292270974, fax +91 1292254674, e-mail tkkapoor@nhpc.nic.in. Visit www.nhpcindia.com/English/Scripts/Tender_Specification.aspx?vid=2046 and www.nhpcindia.com/English/Scripts/T_tender_extension_link.aspx?vid=1535 40/08.Application for prequalification for Dibang Lot 4 has been extended until 30.01.2009. More from T K Kapoor at NHPC, tel +91 129 227 0974, e-mail tkkapoor@nhpc.nic.in. For full description of Lot 4 visit archive in/60. 51/08.



India, Maharashtra - in/59

Highway

Maharashtra State Road Development Corporation (MSRDC) has handed over the feasibility study for an underground tunnel in Mumbai to Arup, following withdrawal by Delhi Metro Rail Corporation (DMRC) while they had begun the study of geological conditions. DMRC had initially volunteered to do the feasibility study for a tunnel, linking the Haji Ali area of central Mumbai to Nariman Point in south Mumbai. Arup will submit the report in two to three months. Other options being weighed, apart from the tunnel, are an undersea tunnel or the stiffly-opposed 4.35 km Pedder Road flyover that would help ease vehicular congestion due to the opening of the Bandra-Worli sealink bridge later this year. Visit www.arup.com 34-35/08.



India, Himachal Pradesh - in/58

Hydropower

Invitation for bids, deadline 5th June, 2008 for construction of a powerhouse complex comprising a surge shaft, pressure shafts, machine hall, erection bay, control bay, transformer cavern, pot head yard, cable tunnel, MAT, tailrace tunnel and other tunnels for the 111 MW Sawra Kuddu hydroelectric project in Shimla district. Visit http://hppcb.nic.in/EIAKudduHEP/Chap1.pdf for more on the project. Contact Himachal Pradesh Power Corporation Ltd, General Manager (contracts), Shanti Kutir, Kamna Nagar, Chakkar, Shimla, Himachal Pradesh, India 171005. Tel. +91 1772832513, Fax +91 1772832307, e-mail hppc.contracts@gmail.com. Visit http://tenders.gov.in/viewtenddoc.asp?tid=hp126835&wno=1&td=TD 16/08.Invitation for bids, deadline 12th June, 2008 for the construction of civil works of the 3 x 65 MW Kashang hydroelectric project comprising a river diversion, intake structure, conveyance channel, desilting basins, power channel, headrace tunnel, underground balancing reservoir, pressure shaft, valve chamber, adit to valve chamber/balancing reservoir (bifurcating from road tunnel), underground power house/transformer hall including various adits in power house complex and tailrace tunnel in Kinnaur district. Contact Himachal Pradesh Power Corporation Ltd, General Manager (contracts), Shanti Kutir, Kamna Nagar, Chakkar, Shimla, Himachal Pradesh, India 171005. Tel. +91 1772832513, Fax +91 1772832307, e-mail hppc.contracts@gmail.com. Visit http://tenders.gov.in/viewtenddoc.asp?tid=hp126836&wno=1&td=TD 16/08.



India, Arunachal Pradesh - in/57

Hydropower

International competitive bidding (tender number NIB 36), deadline 12th May, 2008 for Package I of the 110 MW Pare hydroelectric project in Papumpare district. The scheme mainly consists of a concrete gravity dam, a spillway, a 8 m-diameter 270 m-long horse shoe-shaped diversion tunnel, a 2,810.75 m-long 7.5 m-diameter modified horse shoe-shaped headrace tunnel including adits, a 18 m-diameter 58 m-high surge shaft, a 220 m-long 6.4 m-diameter pressure shaft, and other associated works, at an estimated value of INR2.45 billion. Package II (tender number NIB 37) is for the design and engineering, manufacture, supply, testing, delivery at site, erection, testing and commissioning of 2 x 55 MW turbine generator sets, etc. E-mail contract@neepco.gov.in and edcp@neepco.gov.in. Visit www.neepco.gov.in, then click on Tenders. 08/08.International competitive bidding (tender number NIB 35), deadline 24th March, 2008 for design and review consultancy works for the two packages. E-mail contract@neepco.gov.in and edcp@neepco.gov.in. Visit www.neepco.gov.in, then click on Tenders. 08/08.



Page:

Browse Countries

subscribe to our e-alerts view our advertising rates view our jobs
subscribe to our e-alerts view our advertising rates view our jobs