Tunnelbuilder Promoting the world's tunnelling industry to a huge qualified audience

View the Spanish Tunnelbuilder website View the Italian Tunnelbuilder website

Archive Search

Bulgaria

Bulgaria, Gabrovo - bg/12

Highway

Five bids, ranging from EUR37-43.6 million, excluding VAT, have been received for design and construction of Gabrovo bypass from km 0+000 to km 31+000. The project, including the 3.22 km-long tunnel passing under Shipka peak, will be implemented in two phases: Phase 1 is for programme period 2007-2013. The total length of the section is 23.254 km. Phase 2, including construction of the Shipka tunnel, will be in 2014-2020, value around EUR150 million. Visit http://www.api.government.bg/index.php/Home/3237-Five-Price-Offers-Have-Been-Opened-for-Design-and-Construction-of-Gabrovo-Bypass. 03/13.



Permalink