NTA Metropolitan Mass Transit System Ltd is an Israeli government owned company in charge of the design and construction of the mass transit system in Tel Aviv metropolitan area, Israel. The red line – a 23 km-long Line is the first to be implemented, and includes a central 8.2 km-long section of bored underground tunnels. The green line – a 35 km-long line is the second to be implemented, and includes a central 6 km-long section of bored underground tunnels . NTA wishes to appoint a design build contractor(s) for the TBM bored tunnels for both lines. Submission of the PQ are invited by 27.03.2012. CLICK for details of this tender 053/2011and download documents at www.nta.co.il/site/en/neta.asp?pl=464.
09.05.2025 Germany
09.05.2025 Poland
09.05.2025 Switzerland
13.05.2025 Germany
14.05.2025 Switzerland
14.05.2025 Poland
16.05.2025 Switzerland
16.05.2025 Italy
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Czech Republic
26.05.2025 Norway
28.05.2025 Italy
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
09.06.2025 Switzerland
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
28.07.2025 Brazil