NTA Metropolitan Mass Transit System Ltd is an Israeli government owned company in charge of the design and construction of the mass transit system in Tel Aviv metropolitan area, Israel. The red line – a 23 km-long Line is the first to be implemented, and includes a central 8.2 km-long section of bored underground tunnels. The green line – a 35 km-long line is the second to be implemented, and includes a central 6 km-long section of bored underground tunnels . NTA wishes to appoint a design build contractor(s) for the TBM bored tunnels for both lines. Submission of the PQ are invited by 27.03.2012. CLICK for details of this tender 053/2011and download documents at www.nta.co.il/site/en/neta.asp?pl=464.
01.07.2025 Germany
01.07.2025 Poland
03.07.2025 Czech Republic
04.07.2025 Norway
10.07.2025 Germany
15.07.2025 Spain
22.07.2025 France
28.07.2025 Austria
28.07.2025 Brazil
29.07.2025 Czech Republic
29.07.2025 Germany
31.07.2025 France
11.08.2025 Switzerland
14.08.2025 Switzerland
19.08.2025 Spain
01.09.2025 Brazil
01.09.2025 Switzerland
15.09.2025 Sweden