NTA Metropolitan Mass Transit System Ltd is an Israeli government owned company in charge of the design and construction of the mass transit system in Tel Aviv metropolitan area, Israel. The red line – a 23 km-long Line is the first to be implemented, and includes a central 8.2 km-long section of bored underground tunnels. The green line – a 35 km-long line is the second to be implemented, and includes a central 6 km-long section of bored underground tunnels . NTA wishes to appoint a design build contractor(s) for the TBM bored tunnels for both lines. Submission of the PQ are invited by 27.03.2012. CLICK for details of this tender 053/2011and download documents at www.nta.co.il/site/en/neta.asp?pl=464.
31.07.2025 Czech Republic
31.07.2025 France
31.07.2025 Germany
04.08.2025 Austria
05.08.2025 Poland
11.08.2025 Switzerland
12.08.2025 Austria
12.08.2025 Czech Republic
14.08.2025 Austria
14.08.2025 Italy
14.08.2025 Switzerland
19.08.2025 Spain
25.08.2025 France
26.08.2025 Switzerland
29.08.2025 Denmark
01.09.2025 Brazil
01.09.2025 Switzerland
02.09.2025 Macedonia
02.09.2025 Spain
03.09.2025 Spain
11.09.2025 Switzerland
15.09.2025 Sweden
15.09.2025 Italy
22.09.2025 Netherlands
03.10.2025 Netherlands