The TBM Angeli, boring twin tunnels for the Regional Connector Transit Project, broke through at Grand Avenue Arts/Bunker Hill Station at 2nd Place and Hope Street in Downtown Los Angeles on June 1st , four months after being launched in Little Tokyo.
Following June’s breakthrough at the east end of the Grand Avenue Arts/Bunker Hill Stationthe TBM will have to be moved to the southwest end, where it will resume excavating until it reaches the intersection of Flower and 4th streets. Angeli will then be taken apart and transported back to the 1st and Central Station site in Little Tokyo where the TBM will be reassembled in order to begin boring the second tunnel. Click here for a video and here for tunnelbuilder archive. For further information please visit https://www.metro.net. 23/17.
09.05.2025 Germany
09.05.2025 Poland
09.05.2025 Switzerland
13.05.2025 Germany
14.05.2025 Switzerland
14.05.2025 Poland
16.05.2025 Switzerland
16.05.2025 Italy
22.05.2025 Austria
23.05.2025 Switzerland
26.05.2025 Czech Republic
26.05.2025 Norway
28.05.2025 Italy
02.06.2025 Spain
04.06.2025 Norway
04.06.2025 Austria
05.06.2025 Iceland
09.06.2025 Switzerland
16.06.2025 Spain
17.06.2025 Italy
17.06.2025 France
19.06.2025 France
19.06.2025 Italy
24.06.2025 Switzerland
27.06.2025 Switzerland
28.07.2025 Brazil