The Eglinton Crosstown West Extension project at Toronto has hit two major milestones - Rexy, one of the TBMs has completed 6 kms of tunnelling so far. The other TBM, Renny, has completed just over 5.3 km.
The extension will bring the Eglinton Crosstown LRT another 9.2km further west, creating a continuous rapid transit line from the east end of Toronto through the heart of the city and into Mississauga.
For more information click here and ca/39 for the tunnelbuilder archive and also visit https://www.metrolinx.com. 15/24.
30.04.2024 Germany
07.05.2024 Poland
07.05.2024 Switzerland
13.05.2024 India
15.05.2024 Czech Republic
15.05.2024 Macedonia
16.05.2024 Finland
17.05.2024 Finland
24.05.2024 Switzerland
31.05.2024 Switzerland
07.06.2024 Canada
15.12.2024 Austria