Slovenia, Skolija Loka - si/18

Highway

Open invitation to tender, deadline 03.02.2009, for construction of bypass with 820 m-long single tube tunnel. Contact Irena Skubic at Slovenian Roads Agency, tel +386 1 478 8336, e-mail irena.skubic@gov.si. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=312070-2008 51/08.

NEED QUALIFIED PERSONNEL?



Slovenia, Coastal-Kras Region - si/17

Motorway

Open call for tenders, deadline 30th June, 2006 for construction of the Markovec tunnel (2,140 m / 2,180 m) near the Adriatic coast on section Koper-Izola (5.1 km) of motorway H5 Skofije-Lucija. Geology is flysh. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=030730-2006, OJ S 28, or contact DARS, Ljubljana, fax +386 13009937 or 13068206. E-mail info@dars.si 08/06.The low bid, worth EUR87.4 milion, to construct the Markovec tunnel (2,140 m / 2,180 m) near the Adriatic coast on the 5.1 km Koper-Izola section of motorway H5 Skofije-Lucija has been submitted by an Italian joint venture of Vidoni, Oberosler and Intercantieri Vittadello. The other bidders are a Slovenian team of SCT and Primorje with EUR96.2 million and Strabag with a bid of EUR98 million. Visit www.vidonispa.it, www.oberosler.com and www.intercantieri.com 45/07.Open call for tenders, deadline 17th November, 2008 for construction of the Markovec tunnel (2,140 m / 2,180 m) near the Adriatic coast on section Koper-Izola (5.1 km) of motorway H5 Skofije-Lucija. Geology is flysh. This is a re-bid. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=it&docid=302374-2008, OJ S 190, or contact DARS, Ljubljana, fax +386 13068206. E-mail sasa.stanesic@ddc.si 41/08.New tender deadline 04.12.2008 for construction of the twin tube Markovec tunnel (2,140 m/2,180 m) near the Adriatic coast on 5.1 km-long Koper-Izola section of H5 Skofije-Lucija motorway. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=296100-2008 OJ S 223, or contact DARS, Ljubljana, fax +386 13068206, e-mail sasa.stanesic@ddc.si 47/08.Low rebid to construct 2.14 km-long twin-tube Markovec tunnel on motorway H5 Skofije-Lucija submitted by a joint venture of CPM Maribor and Alpine Bau, value EUR64.5 million. Second lowest rebidder was SCT/Primorje at EUR81.9 million. Contract duration is 32 months. Visit www.alpine-bau.de/en. More about the Slovenian motorway system from www.dars.si. 02/09.

NEED QUALIFIED PERSONNEL?



Award of contract number JN8208/2008 to construct 2.14 km-long twin-tube Markovec tunnel to CPM of SI-2000 Maribor, value EUR53,752,785 compared to engineer's estimate of EUR82,932,000, both sums excluding VAT. More from Oto Rubinic at DARS in Celje, tel +386 130682-04, fax -06, e-mail oto.rubinic@ddc.si. For project history visit tunnelbuilder archive si/17. More at http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=337389-2009. 50/09.

NEED QUALIFIED PERSONNEL?



Slovenia, Karavanke-Obrezje - si/16

Motorway

Procurement notice for civil works for construction of section Šentvid-Koseze on motorway A2 Karavanke-Pbrezje, including the 2,148 m Šentvid tunnel. Difficult construction is anticipated in the first 100 metres in the region of the Celovška road with a minimal cover. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=55441-2003, OJ S 64, or contact Mr. Joze Jenko, Head of Procurement Dept, ZIL Engineering, Kersnikova 10, Ljubljana, Slovenia. Tel. +386 41729636. Visit www.dars.si 15/03. General procurement notice for civil works for section Sentvid-Koseze on motorway A2 Karavanke-Obrezje, including the 2,148 m Sentvid tunnel. First 200 m in cut-and-cover already completed. NATM to be used. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=114360-2003, OJ S 128, or contact Mr. Joze Jenko, Head of Procurement Dept, ZIL Engineering, Kersnikova 10, Ljubljana, Slovenia. Fax +386 1 4304580. Visit www.dars.si 29/03.Open call for bids, deadline 4th August, 2004 for construction of the 1,100 m Sentvid tunnel. It is a two- and three-lane tunnel, cross sections 95 sq m to 140 sq m. Also a 350 sq m cavern. The main rock mass type according to NATM standards is C2 and C3. NATM to be used for construction. Construction cost: SIT13 million (without VAT). Construction to start in October 2004 for completion in December 2006. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=101160-2004, OJ S 120, or contact DARS, Ljubljana, fax +386 14304580. E-mail karel.licen@zilinzeniring.si, milan.crepinsek@zilinzeniring.si or sasa.kos@zilinzeniring.si 28/04.SCT and Primorje secured a SIT9.6 billion contract to build the Sentvid-Koseze section on highway A2 between Karavanke and Obrezje, including the 2 x 1,209 m Sentvid tunnel. The tunnel starts with two lanes from the north side and at about the middle of the length, it may widen to three lanes (this has yet to be decided) until the south entrance. Work has already started from the north entrance, using drill/blast to drive through stone. To date, 120 m has been excavated. Visit www.sct.si and www.primorje.si 15/05.IRGO Consulting and Geoinzeniring secured a SIT268.1 million contract for geological and geotechnical monitoring of the ground movements, the pressure between the ground and the primary lining and in the primary lining itself, and the rock mass displacements as well as geological logging at the tunnel face during construction of the Sentvid tunnel. Visit www.i-rgo.si and www.geo-inz.si 15/05.Invitation to tender, deadline 16.12.2008, for reconstruction of 257 m-long Ljubno tunnel and installation of signals and video surveillance cameras as part of EUR20 million refurbishment of 2.6 km length of A2 highway. Contract duration 20 months. Contact Sektor za razpise, Ljubljana, tel +386 1 3068204, e-mail sasa.stanesic@ddc.si 45/08. http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=287466-2008 45/08.

NEED QUALIFIED PERSONNEL?



Slovenia, Klanec-Ankaran - si/15

Highway

Call for bids released by DARS for the construction of the Dekani tunnel on the Klanec-Ankaran highway. Deadline 7th February, 2002. Double tube of 2,175 and 2,191 metres.Completion time of 32 months. Financing by DARS and the European Investment Bank. Visit http://ted.eur-op.eu.int, document S 245-168204 or fax +386 (0)14788332 to Mr. Oto Rubinic. Also visit www.dars.si 01/02. Slovenian contractor SCT has started tunnelling the 2,180 m-long left tube of the Dekani tunnel. The tunnel will cost $69.7million. The right bore will be 2,200 m in length. Time frame 26 months. The tunnel is part of the 14.9 km motorway section between Klanec and Strmina. Visit www.dars.si 48/02.General procurement notice for civil works for electrical and mechanical equipment of the Kastelec tunnel (lot 1) and Dekani tunnel (lot 2). Tender values: €7.4 million and 6.3 million respectively. Award in June 2003. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=022253-2003, OJ S 28, or contact Mr Oto Rubinic, Consulting & Engineering Ltd, Ljubljana, tel +386 01 3068204, fax +386 01 3068206. Visit www.dars.si 07/03.

NEED QUALIFIED PERSONNEL?



Slovenia, Postojna - si/14

Highway

Tender for design expected end of 2001 for Barnica tunnel (2 x 357 m) and Tabor tunnel (2 x 605 m) on Razdrto-Podnanos highway section. Roadway to be 7.70 m-wide and vertical height of 4.70 m. Design to be completed at autumn 2002 followed by tenders for construction. Visit www.dars.si and www.dd-ceste.si. 43/01.Open call for bids, deadline 12th April, 2005 for construction of the 2 x 300 m Barnica and 2 x 500 m Tabor tunnels, to be built using the drill/blast method in compliance with NATM. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=032543-2005, OJ S 33, or contact DARS, Ljubljana, fax +386 13068206. E-mail oto.rubinic@dd-ceste.si 08/05.Open call for bids, deadline 12th July, 2005 for construction of the 2 x 360 m Barnica and 2 x 600 m Slatna (Tabor) tunnels on the Razdrto-Podnanos highway H4 section, to be built using the drill/blast method in compliance with NATM. This is a rebid since all bids submitted further to the previous tendering exceeded the tender budget. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=096234-2005, OJ S 97, or contact DARS, Ljubljana, fax +386 13068206. E-mail oto.rubinic@dd-ceste.si 22/05.Construction of two twin bored tunnels, the Barnica and Tabor tunnels, has been commissioned by DARS, the Slovenian highway agency, to Italian contractors Vidoni and Oberosler. The tunnels form part of the Vipava-Podnanos-Razdrto section on the highway connecting Ljubljana to Nova Gorica, at the Italian border. The Barnica tunnel has a total length of 588.77 m (west tube 284.7 m and east tube 305.4 m). The Tabor tunnel has a total length of 1,202.6 m (west tube 588.8 m and east tube 613.8 m). Both tunnels will cost EUR26 million. Visit www.dars.si, www.vidonispa.it and www.oberosler.com 40/06.

NEED QUALIFIED PERSONNEL?



Slovenia, Trojane - si/13

Motorway

  Four twin-tube highway tunnels each around 1 km long under construction in three separate contracts in schists, schistose clays and sandstone to complete Maribor-Ljubljana motorway. Four Atlas Copco 352 Boomers and one L2C Rocket Boomer in use. Visit www.atlascopco.com/rde May 2000.General procurement notice for electrical and mechanical installation works for the Trojane and Podmilj tunnels, lengths 5,711 m and 1,168 m respectively, on Vransko-Blagovica section. Estimated value €15.1 million. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=049138-2003, OJ S 57, or contact Oto Rubinic, DARS, Ljubljana, fax +386 13068206. Also visit www.dars.si 13/03.Call for bids, deadline 20th May, 2004 for electrical and mechanical installation works in the Trojane and Podmilj tunnels on the Celje-Ljubljana motorway. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=046812-2004, OJ S 55, or contact DDC Consulting Engineering, Kotnikova 40, 1000 Ljubljana. Tel. +386 13068204, fax +386 13068206. 14/04.

NEED QUALIFIED PERSONNEL?



Slovenia, Doblar Plave - si/12

Hydro

Joint venture of SELI and Jager undertaking extension to existing hydroelectric power station using Robbins 5 m diameter TBM for 2 x 4 km headrace tunnels and Atlas Copco Boomers 135 and 282 in the powerhouse cavern. Visit www.atlascopco.com/rde and www.robbinstbm.com April 2000.

NEED QUALIFIED PERSONNEL?



Slovenia, Ljubljana - si/11

National Highway

New roads across Slovenia will require 34.3 km of twin-tube tunnels from Lendava to Koper and from Jesenice to Bregana with excavated section 80-100 sq m, finished section 70 sq m and height 4.7 m. Some 5.2 km have been constructed to date, mainly by Slovene enterprises. The six tunnel locations are in differing, complicated geological structures as follows: Trojane in schists, schistose clays and sandstone; Maribor in sandstone, marl and mixed ground; vicinity of Ljubljana in permocarbon schistose clays, sandstone and conglomerates; Primorje towards Nova Gorica in marl and sandstone flysch; Primorje towards Koper in tertiary limestone, marl and sandstone; and Dolenjska, near Catez in schistose clays, sandstone and mixed materials. Supervision and inspection of underground works in Slovenia is carried out by the National Mining Inspectorate, contact fax +386 61 1363325. Sept 1999.