Deutsche Bahn project to provide 50 km of new track with 26 km underground together with new central station to cut travelling times to Munich and to airport. Working group considering all options prior to arranging finance package. October 1999.   Further seed finance required to bolster promised $900 million before $2.5 billion scheme to excavate 8-track central station and bury existing lines can start. Visit www.stuttgart21.de 04/01.Negotiated procedure, deadline 3rd December, 2007 for general planning for lots PFA 1.2, PFA 1.6a and PFA 1.6b for the Stuttgart 21 project. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=260644-2007, OJ S 214, or contact DB ProjektBau, Stuttgart, tel. +49 71120927696 or fax +49 71120923690. E-mail ute.schmidt@bahn.de or wolfgang.grau@bahn.de.Lot PFA 1.2 runs from the central station to the Filder plain. It comprises 2 x 9,260 metres of single-track bored tunnels, in circular and horseshoe-shaped cross-sections, about 200 metres of cut-and-cover tunnel, and two single-track underpasses of approx. 450 m. The Filder tunnel connects lots PFA 1.1 and PFA 1.6a with lot PFA 1.3. The tunnel crosses different geological layers, in particular rock formations consisting predominantly of gypsum-bearing rock and anhydrite.Lot PFA 1.6a mainly contains also two single-track tunnels with a circular cross-section and the connection to the Stuttgart Untertuerkheim railway yard. The route length is 6.3 km from the central station to Stuttgart Obertuerkheim and Stuttgart Untertuerkheim.Lot PFA 1.6b is for a new railway yard in Stuttgart Untertuerkheim and associated technical facilities for maintenance. Click here to know more about the Stuttgart 21 project. Visit www.stuttgart21.de 46/07.Negotiated call for tenders, deadline 8th April, 2008 for cost control for the Stuttgart 21 project. Click here and here. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=49902-2008, OJ S 36, or contact Innenministerium Baden-Württemberg, Stuttgart, fax +49 7112315737. E-mail beate.schuler@im.bwl.de 09/08.Spiekermann has been assigned the general planning for lots PFA 1.2 and PFA 1.6 for the Stuttgart 21 project. Click de/22. Visit www.spiekermann.de and www.stuttgart21.de 36/08.Negotiated invitation to tender, deadline 10th October 2008, for planning of lot PFA 1.3 of the Stuttgart 21 project. Lot PFA 1.3 includes single-track tunnels and an underground station at the Stuttgart airport, approx. 3 km long altogether, a 500 m tunnel and a 1.5 km dual-track tunnel box. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=231601-2008, OJ S 173, or contact DB ProjektBau, Stuttgart, fax +49 71193319391. E-mail jens.lukas@bahn.de 37/08.



Negotiated invitation to tender, deadline 24.04.09, for construction-site supervision services of lot PFA 1.5 of the Stuttgart 21 project. Lot PFA 1.5 includes 4 bi-tube tunnels, approximately 3.6 km, 4.2 km, 1.2 km and 0.5 km. Contract duration 25.06.2009 to 31.12.2019. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=083118-2009, OJ S 58, or contact Joachim Miehle at DB ProjektBau in Stuttgart, tel +49 71193319366, e-mail joachim.miehle@deutschebahn.com. 14/09.



Periodic information notice for refurbishment of the railway junction in Stuttgart. The Stuttgart21 project is going to replace the existing terminal station with a new 8 tracks underground station, linked by tunnel to the rail network, for a total of 57 km, with about 33 km underground. The main tunnels of this section are: Filder (2 x 9.5 km), 3.7 km of tunnels under the airport, Obertuerkheim (2 x 5.7 km) and Untertuerkheim (2 x 913 m) under construction; railway by-pass (800 m), Feuerbach (2 x 3.2 km) and Bad Cannstatt (2 x 3.8 km). Duration of contract 01.07.2009 - 31.12.2018. For more on Stuttgart21 project click here and visit tunnelbuilder archive de/22. Contact DB, Stuttgart21 project, Wendlingen-Ulm, Stuttgart, fax +49 6926521939, e-mail FaxInVEC5@deutschebahn.com. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=100407-2009.19/09.Periodic information notice for construction of the new AV Wendlingen – Ulm line, length 60 km, including the following tunnels: Albworland (2 x 7.9 km), Weilheim (225 m), Bossler (2 x 8.7 km), Steinbuehl (2 x 4.7 km), Autostrada A8 (378 m), Widderstall (963 m), AS Merklingen (424 m), Imberg (499 m) and Albabstieg (2 x 5.9 km). Duration of contract 01.07.2009 – 31.12.2018. DB contact details in TED 100407 above.http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=100408-2009.19/09.Negotiated procedure, deadline 29.05.2009, for construction site supervision services of Albabstieg tunnel (2 x 5.9 km) and other works on the new AV Wendlingen-Ulm line. Contract duration 01.08.2009 – 31.12.2016. Contact DB, Joachim Miehle, Stuttgart, tel +49 71193319-366, e-mail: joachim.miehle@deutschebahn.com. http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=114259-2009. 19/09.Negotiated procedure, deadline 29.05.2009, for construction site supervision services of Lot PFA 1.4, Stuttgart21 project, the 10 km Stuttgart-Wendlingen line linking to AV Wendlingen-Ulm and including a tunnel under A8 Highway, a double track tunnel, a 770 m cut & cover tunnel and a 500 m rock tunnel. Contract duration 27.07.2009 – 31.12.2019. DB contact details in TED 114259 above. http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=117196-2009. 19/09.



Invitation to tender by negotiated procedure for geotechnical consultation for the execution of construction inclusive examination of the tender documents and co-operation with the assignment for the large-scale project Stuttgart 21, sections 1.1 to 1.6, including 10.5 km tunnel. Contract duration 04.12.2009-31.12.2019. Contact Thomas Wilhelmi at DB, Progetto Stoccarda21, NBS Wendlingen-Ulm, tel +49 71193319-368, fax +49 69265-21939. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=244448-2009. 36/09.



Invitation to tender by negotiated procedure, deadline 03.12.2009, for construction site supervision services and assistance in checking tender documents for section PFA 2.3, Stuttgart21 project. Contract duration 01.04.2010 - 31.12.2017. Contact Joachim Miehle at DB ProjektBau GmbH in Stuttgart, tel +49 71193319-366, e-mail joachim.miehle@ deutschebahn.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=319800-2009. 48/09.



The JV BOL/Bíœ Stuttgart 21 PFA 2.2, composed by Ing.-Büro Dipl.-Ing. Vössing GmbH (Düsseldorf) and CDM Consult GmbH (Bochum) secured the contract for site supervision services during the construction of the Stuttgart 21/NBS Wendlingen-Ulm section (NBS, PA 2.2) including two tunnels lengths about 8,790 m and 4,825 m consisting of two single-track tubes and 200 m in open cut. Contact Michael Frahm at DB ProjektBau GmbH in Stuttgart, tel +49 71193319-366, e-mail michael.frahm@dbnetze.com. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=008992-2010. 06/10.



Invitation to tender by negotiated procedure, deadline 13.04.2010, for health and safety coordination during the construction of the Stuttgart 21/Wendlingen-Ulm section of high speed railway. Contact Joachim Miehle, Deutsche Bahn AG, Stuttgart, tel +49 71193319-366, e-mail einkauf-S21NBS@deutschebah.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=096308-2010. 14/10.



Invitation to tender by negotiated procedure, deadline 20.05.2010, for construction of Lots 1A and 1B twin-tube tunnels. Lot 1A is the 18.7 km-long Filder tunnel to be excavated in Keuper gypsum/marl and marl/sandstone and including 19 compound structures of 17-24 m-long, 250 m-long underground rescue access, 1.3 km-long intermediate section, and 255 m-long open cut tunnel. Lot 1B is the 12.3 km-long Untertuerkheim connection to be excavated with associated structures in Keuper marls and Upper Quaternary deposits. NATM or TBM methods can be used in both lots. Further information, specs and docs from Axel Heintel at Deutsch Bahn AG in Stuttgart, tel +49 71193319-361, fax +49 69-26521939, to whom tenders or requests to participate should be sent. For full history of Stuttgart 21 project over the last 10 years visit tunnelbuilder archive de/22. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=130705-2010. 18/10.



Invitation to tender by negotiated procedure, deadline 30.07.2010, for construction of new underground station and excavation of north and south tunnels below Directorate building, under Heilbronnerstrasse, through the castle garden and beneath Fahrbrucke at Willy-Brandt-Strasse, totalling approximately 1 m cu m. Contract starts 14.02.2011 for completion 31.12.2018. Further information, specs and docs from BBA (TEC 5) in Stuttgart, fax +49 6926521939, e-mail einkauf-s21nbs@deutschebahn.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=211193-2010. 29/10.



Invitation to tender by negotiated procedure, deadline 25.10.2010, for design and construction of new 2.3 km-long S-Bahn railway line from Stuttgart main station to Stuttgart North with 1.5 km shell covered tunnel, 260 m-long Mittnachstrasse station, and associated structures. Contract starts 14.04.2011 for completion 31.12.2019. Further information, specs and docs from BBA (TEC 5) at DB AG in Stuttgart, fax +49 6926521939, e-mail einkauf-s21nbs@deutschebahn.com. For Stuttgart 21 project history visit tunnelbuilder archive de/22. For this contract notice visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=302725-2010. 41/10.



Invitation to tender by negotiated procedure, deadline 28.06.2011, for design and construction of 17 km of new S-Bahn railway line in three lots from Unterturkheim to Bad Canstatt and Oberturkheim with tunnels, stations, and associated structures. Contracts lots 2A, 2B and 3 start 28.10.2011 for completion 31.12.2019. Further information, specs and docs from BBA (TEI 3) at DB AG in Stuttgart, fax +49 6926521939, e-mail einkauf-s21nbs@deutschebahn.com. For Stuttgart 21 project history visit tunnelbuilder archive de/22. For this contract notice visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=187618-2011. 24/11.



Periodic indicative notice (PIN), without call for competition, for start of award procedures on 15.07.2011 for the new AV line Wendlingen-Ulm, 60 km length, half in tunnel and for remodelling of the railway junction in Stuttgart. Completion of contract: 31.12.2019. Contact Deutsche Bahn AG, Stuttgart, e-mail einkauf-S21nbs@deutschebahn.com, fax +49 6926521939. For more go to www.bahnprojekt-stuttgart-ulm.de/siteutilities/header/presse/20110715/default.aspx. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=226693-2011 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=226694-2011. 30/11.



Award of contract to Porr International of Austria for construction of Lots 1A and 1B twin-tube tunnels on Stuttgart-Ulm project. Lot 1A is the 9.5 km-long Filderstadt tunnel to be excavated in Keuper gypsum/marl and marl/sandstone. Lot 1B is the 12.3 km-long Ober-Untertuerkheim connection to be excavated with associated structures in Keuper marls and Upper Quaternary deposits. NATM or TBM methods can be used in both lots. Further information from Axel Heintel at Deutsch Bahn AG in Stuttgart, tel +49 71193319-361, fax +49 69-26521939. For full history of Stuttgart 21 project over the last 10 years visit tunnelbuilder archive de/22. Visit www.porr.at. 31/11.



Invitation to tender by negotiated procedure, deadline 11.01.2012, for construction in mainly karst of twin-tube, single-track, 4.7 m-diameter Boessler tunnel in two lots of 3.67 km and 820 m with 280 m cover, and 4.82 km Steinbuehel tunnel as Lot 3 with 120 m cover, all with crosspassages at 500 m intervals. Further information, specs and docs from BBA (TEI 3) at DB AG in Stuttgart, fax +49 6926521939, e-mail einkauf-s21nbs@deutschebahn.com, to where tenders or requests to participate must be sent. For full Stuttgart 21 project history visit tunnelbuilder archive de/22. For this contract notice visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=349672-2011. 45/11.



Invitation to tender by negotiated procedure, deadline 31.01.2012, for engineering design services for construction of the 60 km Stoccarda-Ulm line, including 30 km underground. The line is divided in the following sections: PA 1,4; PA 2.5a1; PA 2.1: 16 km length with 8 km underground; PA 2.2: 15 km of which 14 km in tunnel; PA 2.3: 21 km including 2 km underground; PA 2.4: 7 km length with 6 km in tunnel. Contract duration 24.04.2012 to 31.12.2020. Further information, specs and docs from BBA (TEI 3) at DB AG in Stuttgart, fax +49 6926521939, e-mail einkauf-s21nbs@deutschebahn.com, to where tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=022540-2012. 04/12.



Award of EUR290 million contract to JV Wayss & Freytag Ingenieurbau/Hochtief/Alpine for construction of 3.8 km-long rail tunnel in Bad Cannstatt as part of Deutsche Bahn rail project Stuttgart 21. Completion 2018. Visit http://www.bam.eu/press/wayss-freytag-ingenieurbau-wins-joint-venture-tunnel-contract-germany. 16/12.



Negotiated procedure, deadline 23.07.2012, for the construction of the 963 m-long Widderstall tunnel on the new 60 km-long AV line Wendlingen-Ulm, half of which is in tunnel. Contract duration 15.11.2012 to 30.04.2016. Contact Deutsche Bahn AG, attn Beschaffung Infrastruktur TEI 3, Stuttgart, e-mail einkauf-S21nbs@deutschebahn.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=214642-2012. 28/12.



Negotiated procedure, deadline 24.08.2012, for engineering planning and construction from intermediate attack of 6 km-long Albabstieg tunnel with two single-track tubes with crosspassages on section Ulm-Dornstadt of the new 60 km-long AV line Wendlingen-Ulm. Contract duration 02.07.2013 to 01.06.2019. Contact Deutsche Bahn AG, attn Beschaffung Infrastruktur TEI 3, Stuttgart, fax +49 6926521939, e-mail einkauf-S21nbs@deutschebahn.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=227619-2012. 29/12.



Award of contract to Bietergemeinschaft Porr/Porr of Muenchen for design and construction of lots 2A and 3 of 17 km-long new S-Bahn railway line from Unterturkheim to Bad Canstatt and Oberturkheim with tunnels, stations, and associated structures. Further information, specs and docs from BBA (TEI 3) at DB AG in Stuttgart, fax +49 6926521939, e-mail einkauf-s21nbs@deutschebahn.com. For Stuttgart 21 project history, visit tunnelbuilder archive de/22. For this contract notice visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=230212-2012. 30/12.



Periodic indicative notice (PIN) without call for competition for construction of the new AV Wendlingen–Ulm line, length 60 km, including about 30 km in tunnel. Award procedures started on 26.07.2012. Contact DB AG, Stuttgart, fax +49 6926521939, e-mail einkauf-S21nbs@deutschebahn.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=239733-2012 and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=243056-2012. 32/12.



The EUR323.44 million contract, excluding VAT, for construction of new underground station and excavation of north and south tunnels below Directorate building, under Heilbronnerstrasse, through the castle garden and beneath Fahrbrucke at Willy-Brandt-Strasse, totalling approximately 1 million cu m, has been awarded. For more DB AG in Stuttgart, fax +49 6926521939, e-mail einkauf-s21nbs@deutschebahn.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=356149-2012. 46/12. 

The consortium Baresel/Kunz/Walo of Stuttgart secured the section Fernbahn-Zufuhrung Feuerbach  (lot 2) including 5.2 km of tunnels. The consortium Hochtief/W&F/Alpine of Frankfurt secured the section Fern- u. S-Bahn-Zufuhrung Bad Cannstatt (lot 3) including 7.3 km of tunnels. Contact DB ProjektBau GmbH, Stuttgart.

Visit http://www.bahnprojekt-stuttgart-ulm.de/details/s21-neuordnung-bahnknoten-stuttgart/die-bauabschnitte-pfa/zufuehrung-feuerbach-und-bad-cannstatt/ and http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=303795-2012. 46/12.



Award of contract, value EUR635 million excluding VAT, to ArGe Tunnel Albaufstieg comprising Porr/Hinteregger/Oestu Stettin/Swietelsky for construction of 8.806 km-long Boessler tunnel and 4.847 km-long Steinbuehl tunnel on Wendlingen-Ulm planning section 2.2 at Goeppingen. Further information, specs and docs from BBA (TEI 3) at DB AG in Stuttgart, fax +49 6926521939, e-mail einkauf-s21nbs@deutschebahn.com. For contract notice visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=378469-2012. NUTS code DE114. 48/12.

 



Invitation to tender by negotiated procedure, deadline 20.12.2012, for engineering services for tunnelling Lot PFA 2.1 on Wendlingen-Ulm line, including the bi-tube, single track Albvorland tunnel, length 8.2 km. Contract duration 01.02.2013-31.01.2015. Contact DB ProjektBau GmbH, Stuttgart, e-mail einkauf-s21nbs@deutschebahn.com. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=390652 -2012. 50/12



Invitation to tender using negotiated procedure, deadline 05.02.2013, for supply and installation of ventilation equipment for section Wolframstrasse to junction with Tuerlenstrasse in Wagenladungsstrasse tunnel. Further information, specs and docs from Hans Kammerer at DB AG in Stuttgart, tel +49 7112092-1297, fax –3690, e-mail hans.kammerer@deutschebahn.com, to whom tenders or requests to participate must be sent. Visit http://ted.europa.eu/udl?request=Seek-deliver&language=en&docid=019702-2013. 04/13.



Negotiated invitation to tender, deadline 13.03.2013, for engineering-related scientific and technical services for tunnels included in Lots PFA 1.6 a/b and PFA 1.2 for the Stuttgart 21 project. The Lots PFA 1.6 a/b and PFA 1.2 include two bi-tube tunnels each, 5,730m and 1,080 m the first, 4,610 m and 4,880 m the second. Duration of contract 01.05.2013 -30.04.2015. Contact DB AG, Infrastructures tender (TEI 3), Stuttgart, e-mail einkauf-s21nbs@deutschebahn.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=064520-2013, GU S 40. 10/13.



Negotiated invitation to tender, deadline 08.04.2013, per muck loading, transport and disposal, excavated from tunnel in lots PFA 1.6, PFA 1.6a and1b, of the Stuttgart 21 project. Duration contract 01.07.2013 to 31.12.2017. Contact TEI3 - Beschaffung Grossprojekt Stuttgart-Ulm, Stuttgart, e-mail einkauf-s21nbs@deutschebahn.com, fax +49 6926521939. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=085619-2013. 11/13.